In order to optimize the spares configuration project at different stages during the life cycle, the factor of time is considered to relax the assumption of the spares steady demand in multi-echelon technique for reco...In order to optimize the spares configuration project at different stages during the life cycle, the factor of time is considered to relax the assumption of the spares steady demand in multi-echelon technique for recoverable item control (METRIC) theory. According to the method of systems analysis, the dynamic palm theorem is introduced to establish the prediction model of the spares demand rate, and its main influence factors are analyzed, based on which, the spares support effectiveness evaluation index system is studied, and the system optimization-oriented spares dynamic configuration method for multi-echelon multi-indenture system is proposed. Through the analysis of the optimization algorithm, the layered marginal algorithm is designed to improve the model calculation efficiency. In a given example, the multi-stage spares configuration project during its life cycle is gotten, the research result conforms to the actual status, and it can provide a new way for the spares dynamic optimization.展开更多
In equipment integrated logistics support(ILS), the supply capability of spare parts is a significant factor. There are lots of depots in the traditional support system, which makes too many redundant spare parts and ...In equipment integrated logistics support(ILS), the supply capability of spare parts is a significant factor. There are lots of depots in the traditional support system, which makes too many redundant spare parts and causes high cost of support. Meanwhile,the inconsistency among depots makes it difficult to manage spare parts. With the development of information technology and transportation, the supply network has become more efficient. In order to further improve the efficiency of supply-support work and the availability of the equipment system, building a system of one centralized depot with multiple depots becomes an appropriate way.In this case, location selection of the depots including centralized depots and multiple depots becomes a top priority in the support system. This paper will focus on the location selection problem of centralized depots considering ILS factors. Unlike the common location selection problem, depots in ILS require a higher service level. Therefore, it becomes desperately necessary to take the high requirement of the mission into account while determining location of depots. Based on this, we raise an optimal depot location model. First, the expected transportation cost is calculated.Next, factors in ILS such as response time, availability and fill rate are analyzed for evaluating positions of open depots. Then, an optimization model of depot location is developed with the minimum expected cost of transportation as objective and ILS factors as constraints. Finally, a numerical case is studied to prove the validity of the model by using the genetic algorithm. Results show that depot location obtained by this model can guarantee the effectiveness and capability of ILS well.展开更多
Spare parts are very common in industry and military fields, and the investigations of spare parts demand forecasting methods have draws much attention in recent years. However,to the best of our knowledge,only few pa...Spare parts are very common in industry and military fields, and the investigations of spare parts demand forecasting methods have draws much attention in recent years. However,to the best of our knowledge,only few papers reviewed the forecasting papers systematically. This paper is an attempt to provide a novel and comprehensive view to summarize these methods. A new framework was proposed to classify the demand forecasting methods into four categories,including empirical methods,methods based on historical data,analytical methods and simulation methods. Some typical literatures related to each category were reviewed.Moreover, a general spare parts forecasting procedure was summarized and some evaluation criteria were presented. Finally,characteristics of different forecasting methods and some avenues for further research were illustrated. This work provides the managers with a systematical idea about the spare parts demand forecasting and it can be used in practical applications.展开更多
With the wide application of condition based maintenance(CBM) in aircraft maintenance practice, the joint optimization of maintenance and inventory management, which can take full advantage of CBM and reduce the aircr...With the wide application of condition based maintenance(CBM) in aircraft maintenance practice, the joint optimization of maintenance and inventory management, which can take full advantage of CBM and reduce the aircraft operational cost, is receiving increasing attention. In order to optimize the inspection interval, maintenance decision and spare provisioning together for aircraft deteriorating parts, firstly, a joint inventory management strategy is presented, then, a joint optimization of maintenance inspection and spare provisioning for aircraft parts subject to the Wiener degradation process is proposed based on the strategy.Secondly, a combination of the genetic algorithm(GA) and the Monte Carol method is developed to minimize the total cost rate.Finally, a case study is conducted and the proposed joint optimization model is compared with the existing optimization model and the airline real case. The results demonstrate that the proposed model is more beneficial and effective. In addition, the sensitivity analysis of the proposed model shows that the lead time has higher influence on the optimal results than the urgent order cost and the corrective maintenance cost, which is consistent with the actual situation of aircraft maintenance practices and inventory management.展开更多
Spare parts are very essential in most industrial companies. They are characterized by their large number and their high impact on the companies’ operations whenever needed. Therefore companies tend to analyze their ...Spare parts are very essential in most industrial companies. They are characterized by their large number and their high impact on the companies’ operations whenever needed. Therefore companies tend to analyze their spare parts demand and try to estimate their future consumption. Nevertheless, they face difficulties in figuring out an optimal forecasting method that deals with the lumpy and intermittent demand of spare parts. In this paper, we performed a comparison between five forecasting methods based on three statistical tools;Mean squared error (MSE), mean absolute deviation (MAD) and mean error (ME), where the results showed close performance for all the methods associated with their optimal parameters and the frequency of the spare part demand. Therefore, we proposed to compare all the methods based on the tracking signal with the objective of minimizing the average number of out of controls. This approach was tested in a comparative study at a local paper mill company. Our findings showed that the application of the tracking signal approach helps companies to better select the optimal forecasting method and reduce forecast errors.展开更多
According to the current situation of repair and supply for valuable spare parts in the weapon equipment of the PLA,using the research results of the repairable spare parts inventory theory,an inventory model of the v...According to the current situation of repair and supply for valuable spare parts in the weapon equipment of the PLA,using the research results of the repairable spare parts inventory theory,an inventory model of the valuable spare parts in three-echelon repair and supply system is established by expanding the classical METRIC model and theory,and the genetic algorithm is utilized to solve the model.In the algorithm,the chromosome representation and initial population production,the crossover and mutation operators are designed.By using an example,a simulation analysis is carried out to verify the model's correctness.展开更多
In spare parts industries, firms are dealing with a situation which is more and more uncertain due to the supply chain structure and variable demands. This paper presents a Bayesian approach to forecast demand and sub...In spare parts industries, firms are dealing with a situation which is more and more uncertain due to the supply chain structure and variable demands. This paper presents a Bayesian approach to forecast demand and subsequently determine the appropriate parameter S of an ( S - 1 ; S) inventory system for controlling plant spare parts. We apply the Bayesian approach in an innovative way to specify the initial prior distributions of the failure rates, using the initial estimates and the failure history of similar items. According to the proposed method, a lower base stock than the one currently used is sufficient to achieve the desired service level.展开更多
In order to facilitate spare parts management,an integrated approach of BP neural network and supportability analysis(SA)was proposed to evaluate the criticality of spare parts as well as to prioritize spare parts.Inf...In order to facilitate spare parts management,an integrated approach of BP neural network and supportability analysis(SA)was proposed to evaluate the criticality of spare parts as well as to prioritize spare parts.Influential factors of prioritizing spare parts were detailedly analyzed.Framework of the integrated method was established.The modelling process based on BP neural network was presented.As the input of the neural network,the values of influential factors were determined by supportability analysis data.Based on the presented method,spare parts could be automatically prioritized after supportability analysis for a new system.A case study results showed that the new method was applicable and effective.展开更多
Based on the classification of spare parts and the research results of the demand of spare parts,a three-dimensional classification model of spare parts of agricultural machinery is established,which includes the appl...Based on the classification of spare parts and the research results of the demand of spare parts,a three-dimensional classification model of spare parts of agricultural machinery is established,which includes the application axis sorted by technical characteristics,the cost axis classified by ABC method,and the demand axis classified by the demand of the spare parts of agricultural machinery.These dimension axes represent different factors,and the application of factors in purchase is analyzed.Guiding value of each dimension axis is summarized in the field of the spare parts purchase;and corresponding strategy instruction is put forward.Integrated application of these strategies by model makes the purchase have more realistic operational meaning.Application field of the three-dimensional model of spare parts is discussed;and the direction for further research is pointed out.展开更多
Due to the fact that in ship maintena n ce process,the method of determining the number of spare parts is not scientific and the actual operation is complicated,this paper analyzes four major facto rs affecting the nu...Due to the fact that in ship maintena n ce process,the method of determining the number of spare parts is not scientific and the actual operation is complicated,this paper analyzes four major facto rs affecting the number of ship spare parts,including number of main planned op eration s,total times of disassembling in maintenance,accumulated working time and mea n t ime between failures.It also establishes a spare parts demand forecast model b ased on the affecting factors and radial-basis function(RBF) neural network.F inally,the paper provide s forecast examples and makes a comparison between the examples and back propaga tion(BP) neura l network forecast result.The comparison results s how that the forecast based on RBF neural network is simple and the forecast res ult fits the actual situa tion and fitting effect is better than that based on BP.展开更多
The maintenance management of construction equipment occupies a prominent place in the overall strategy for managing the equipment fleet. It is also linked to the management of the stock of spare parts and particularl...The maintenance management of construction equipment occupies a prominent place in the overall strategy for managing the equipment fleet. It is also linked to the management of the stock of spare parts and particularly reconditioned spare parts. Because of the relatively low purchase cost of these, most companies are tempted by this option. The purpose of this article is precisely to study the impact of this category of parts in the stock and also in the optimization of maintenance costs, knowing that to do this;their use must obey certain constraints. It is therefore important to be able to characterize these reconditioned parts by estimating their optimal age, and studying their advantages and also their limits. The determination of the optimal age of reconditioned parts will be such that the total cost of replacement with used parts is at most equal to the total cost of replacement with new parts at the end of the operating period.展开更多
Based on an investigation on the current situation of SPM in some enterprises, this paper presents the common probletns and poor fields existing in SPM in enterprise; analyzes the reasons which resulted in the situati...Based on an investigation on the current situation of SPM in some enterprises, this paper presents the common probletns and poor fields existing in SPM in enterprise; analyzes the reasons which resulted in the situation, and then puts forward some feasible measures to improve it. Lastly, some fields that should be paid more attention in SPM are provided.展开更多
This paper introduces the design and implementation of an equipment spare-part-management information system, which was developed by Microsoft Visual Foxpro5.0 and runs under the Windows95 environment, its basic princ...This paper introduces the design and implementation of an equipment spare-part-management information system, which was developed by Microsoft Visual Foxpro5.0 and runs under the Windows95 environment, its basic principle, the information flow diagram and functional modules, and finally applications of the system.展开更多
“Spare parts surgery” is well-described in the plastic surgery literature. In the setting of trauma, otherwise discarded parts can be utilized for reconstruction resulting in a superior functional and aesthetic outc...“Spare parts surgery” is well-described in the plastic surgery literature. In the setting of trauma, otherwise discarded parts can be utilized for reconstruction resulting in a superior functional and aesthetic outcome for the patient. We describe the use of spare part surgery in order to preserve a functional knee articulation in a patient undergoing amputation for compartment.展开更多
基金supported by the National Defense Pre-research Project in 13th Five-Year(41404050502)the National Defense Science and Technology Fund of the Central Military Commission(2101140)
文摘In order to optimize the spares configuration project at different stages during the life cycle, the factor of time is considered to relax the assumption of the spares steady demand in multi-echelon technique for recoverable item control (METRIC) theory. According to the method of systems analysis, the dynamic palm theorem is introduced to establish the prediction model of the spares demand rate, and its main influence factors are analyzed, based on which, the spares support effectiveness evaluation index system is studied, and the system optimization-oriented spares dynamic configuration method for multi-echelon multi-indenture system is proposed. Through the analysis of the optimization algorithm, the layered marginal algorithm is designed to improve the model calculation efficiency. In a given example, the multi-stage spares configuration project during its life cycle is gotten, the research result conforms to the actual status, and it can provide a new way for the spares dynamic optimization.
基金supported by the Science Challenge Project(TZ2018007)the National Natural Science Foundation of China(71671009+2 种基金 61871013 61573041 61573043)
文摘In equipment integrated logistics support(ILS), the supply capability of spare parts is a significant factor. There are lots of depots in the traditional support system, which makes too many redundant spare parts and causes high cost of support. Meanwhile,the inconsistency among depots makes it difficult to manage spare parts. With the development of information technology and transportation, the supply network has become more efficient. In order to further improve the efficiency of supply-support work and the availability of the equipment system, building a system of one centralized depot with multiple depots becomes an appropriate way.In this case, location selection of the depots including centralized depots and multiple depots becomes a top priority in the support system. This paper will focus on the location selection problem of centralized depots considering ILS factors. Unlike the common location selection problem, depots in ILS require a higher service level. Therefore, it becomes desperately necessary to take the high requirement of the mission into account while determining location of depots. Based on this, we raise an optimal depot location model. First, the expected transportation cost is calculated.Next, factors in ILS such as response time, availability and fill rate are analyzed for evaluating positions of open depots. Then, an optimization model of depot location is developed with the minimum expected cost of transportation as objective and ILS factors as constraints. Finally, a numerical case is studied to prove the validity of the model by using the genetic algorithm. Results show that depot location obtained by this model can guarantee the effectiveness and capability of ILS well.
文摘Spare parts are very common in industry and military fields, and the investigations of spare parts demand forecasting methods have draws much attention in recent years. However,to the best of our knowledge,only few papers reviewed the forecasting papers systematically. This paper is an attempt to provide a novel and comprehensive view to summarize these methods. A new framework was proposed to classify the demand forecasting methods into four categories,including empirical methods,methods based on historical data,analytical methods and simulation methods. Some typical literatures related to each category were reviewed.Moreover, a general spare parts forecasting procedure was summarized and some evaluation criteria were presented. Finally,characteristics of different forecasting methods and some avenues for further research were illustrated. This work provides the managers with a systematical idea about the spare parts demand forecasting and it can be used in practical applications.
基金supported by the Fundamental Research Funds for the Central Universities(NS2015072)
文摘With the wide application of condition based maintenance(CBM) in aircraft maintenance practice, the joint optimization of maintenance and inventory management, which can take full advantage of CBM and reduce the aircraft operational cost, is receiving increasing attention. In order to optimize the inspection interval, maintenance decision and spare provisioning together for aircraft deteriorating parts, firstly, a joint inventory management strategy is presented, then, a joint optimization of maintenance inspection and spare provisioning for aircraft parts subject to the Wiener degradation process is proposed based on the strategy.Secondly, a combination of the genetic algorithm(GA) and the Monte Carol method is developed to minimize the total cost rate.Finally, a case study is conducted and the proposed joint optimization model is compared with the existing optimization model and the airline real case. The results demonstrate that the proposed model is more beneficial and effective. In addition, the sensitivity analysis of the proposed model shows that the lead time has higher influence on the optimal results than the urgent order cost and the corrective maintenance cost, which is consistent with the actual situation of aircraft maintenance practices and inventory management.
文摘Spare parts are very essential in most industrial companies. They are characterized by their large number and their high impact on the companies’ operations whenever needed. Therefore companies tend to analyze their spare parts demand and try to estimate their future consumption. Nevertheless, they face difficulties in figuring out an optimal forecasting method that deals with the lumpy and intermittent demand of spare parts. In this paper, we performed a comparison between five forecasting methods based on three statistical tools;Mean squared error (MSE), mean absolute deviation (MAD) and mean error (ME), where the results showed close performance for all the methods associated with their optimal parameters and the frequency of the spare part demand. Therefore, we proposed to compare all the methods based on the tracking signal with the objective of minimizing the average number of out of controls. This approach was tested in a comparative study at a local paper mill company. Our findings showed that the application of the tracking signal approach helps companies to better select the optimal forecasting method and reduce forecast errors.
基金Sponsored by the Foundation of National Defense Research(2008-76320)
文摘According to the current situation of repair and supply for valuable spare parts in the weapon equipment of the PLA,using the research results of the repairable spare parts inventory theory,an inventory model of the valuable spare parts in three-echelon repair and supply system is established by expanding the classical METRIC model and theory,and the genetic algorithm is utilized to solve the model.In the algorithm,the chromosome representation and initial population production,the crossover and mutation operators are designed.By using an example,a simulation analysis is carried out to verify the model's correctness.
文摘In spare parts industries, firms are dealing with a situation which is more and more uncertain due to the supply chain structure and variable demands. This paper presents a Bayesian approach to forecast demand and subsequently determine the appropriate parameter S of an ( S - 1 ; S) inventory system for controlling plant spare parts. We apply the Bayesian approach in an innovative way to specify the initial prior distributions of the failure rates, using the initial estimates and the failure history of similar items. According to the proposed method, a lower base stock than the one currently used is sufficient to achieve the desired service level.
文摘In order to facilitate spare parts management,an integrated approach of BP neural network and supportability analysis(SA)was proposed to evaluate the criticality of spare parts as well as to prioritize spare parts.Influential factors of prioritizing spare parts were detailedly analyzed.Framework of the integrated method was established.The modelling process based on BP neural network was presented.As the input of the neural network,the values of influential factors were determined by supportability analysis data.Based on the presented method,spare parts could be automatically prioritized after supportability analysis for a new system.A case study results showed that the new method was applicable and effective.
文摘Based on the classification of spare parts and the research results of the demand of spare parts,a three-dimensional classification model of spare parts of agricultural machinery is established,which includes the application axis sorted by technical characteristics,the cost axis classified by ABC method,and the demand axis classified by the demand of the spare parts of agricultural machinery.These dimension axes represent different factors,and the application of factors in purchase is analyzed.Guiding value of each dimension axis is summarized in the field of the spare parts purchase;and corresponding strategy instruction is put forward.Integrated application of these strategies by model makes the purchase have more realistic operational meaning.Application field of the three-dimensional model of spare parts is discussed;and the direction for further research is pointed out.
文摘Due to the fact that in ship maintena n ce process,the method of determining the number of spare parts is not scientific and the actual operation is complicated,this paper analyzes four major facto rs affecting the number of ship spare parts,including number of main planned op eration s,total times of disassembling in maintenance,accumulated working time and mea n t ime between failures.It also establishes a spare parts demand forecast model b ased on the affecting factors and radial-basis function(RBF) neural network.F inally,the paper provide s forecast examples and makes a comparison between the examples and back propaga tion(BP) neura l network forecast result.The comparison results s how that the forecast based on RBF neural network is simple and the forecast res ult fits the actual situa tion and fitting effect is better than that based on BP.
文摘The maintenance management of construction equipment occupies a prominent place in the overall strategy for managing the equipment fleet. It is also linked to the management of the stock of spare parts and particularly reconditioned spare parts. Because of the relatively low purchase cost of these, most companies are tempted by this option. The purpose of this article is precisely to study the impact of this category of parts in the stock and also in the optimization of maintenance costs, knowing that to do this;their use must obey certain constraints. It is therefore important to be able to characterize these reconditioned parts by estimating their optimal age, and studying their advantages and also their limits. The determination of the optimal age of reconditioned parts will be such that the total cost of replacement with used parts is at most equal to the total cost of replacement with new parts at the end of the operating period.
文摘Based on an investigation on the current situation of SPM in some enterprises, this paper presents the common probletns and poor fields existing in SPM in enterprise; analyzes the reasons which resulted in the situation, and then puts forward some feasible measures to improve it. Lastly, some fields that should be paid more attention in SPM are provided.
文摘This paper introduces the design and implementation of an equipment spare-part-management information system, which was developed by Microsoft Visual Foxpro5.0 and runs under the Windows95 environment, its basic principle, the information flow diagram and functional modules, and finally applications of the system.
文摘“Spare parts surgery” is well-described in the plastic surgery literature. In the setting of trauma, otherwise discarded parts can be utilized for reconstruction resulting in a superior functional and aesthetic outcome for the patient. We describe the use of spare part surgery in order to preserve a functional knee articulation in a patient undergoing amputation for compartment.