The supercritical CO_(2)(sCO_(2))power cycle could improve efficiencies for a wide range of thermal power plants.The sCO_(2)turbine generator plays an important role in the sCO_(2)power cycle by directly converting th...The supercritical CO_(2)(sCO_(2))power cycle could improve efficiencies for a wide range of thermal power plants.The sCO_(2)turbine generator plays an important role in the sCO_(2)power cycle by directly converting thermal energy into mechanical work and electric power.The operation of the generator encounters challenges,including high temperature,high pressure,high rotational speed,and other engineering problems,such as leakage.Experimental studies of sCO_(2)turbines are insufficient because of the significant difficulties in turbine manufacturing and system construction.Unlike most experimental investigations that primarily focus on 100 kW‐or MW‐scale power generation systems,we consider,for the first time,a small‐scale power generator using sCO_(2).A partial admission axial turbine was designed and manufactured with a rated rotational speed of 40,000 rpm,and a CO_(2)transcritical power cycle test loop was constructed to validate the performance of our manufactured generator.A resistant gas was proposed in the constructed turbine expander to solve the leakage issue.Both dynamic and steady performances were investigated.The results indicated that a peak electric power of 11.55 kW was achieved at 29,369 rpm.The maximum total efficiency of the turbo‐generator was 58.98%,which was affected by both the turbine rotational speed and pressure ratio,according to the proposed performance map.展开更多
For a radial inflow turbine(RIT),leakage flow in impeller backface cavity has critical impacts on aerodynamic performance of the RIT and axial force acting on the RIT impeller.In order to control this leakage flow,dif...For a radial inflow turbine(RIT),leakage flow in impeller backface cavity has critical impacts on aerodynamic performance of the RIT and axial force acting on the RIT impeller.In order to control this leakage flow,different types of labyrinth seals are numerically studied in this paper based on a supercritical carbon dioxide(S-CO_(2))RIT.The effects of seal clearance and cavity outlet pressure are first analyzed,and the impacts of seal design parameters,including height,number and shape of seal teeth,are evaluated.Results indicate that adding labyrinth seal can improve cavity pressure and hence adequately inhibits leakage flow.Decreasing the seal clearance and increasing the height of seal teeth are beneficial to improve sealing performance,and the same effect can be obtained by increasing the number of seal teeth.Meanwhile,employing seals can reduce leakage loss and improve RIT efficiency under a specific range of cavity outlet pressure.Finally,the influences of seal types on the flow field in seal cavity are numerically analyzed,and results demonstrate that isosceles trapezoidal type of seal cavity has better sealing performance than triangular,rectangular and right-angled trapezoidal seal cavities.展开更多
In this paper the development status and background of 350-MW China-made supercritical steam turbines are introduced.Through the study on the eight turbines that are put into operation,their technical performances are...In this paper the development status and background of 350-MW China-made supercritical steam turbines are introduced.Through the study on the eight turbines that are put into operation,their technical performances are compared and summarized.The major factors affecting the heat consumption rate are analyzed in details and the technical measures to reduce the heat consumption rate are put forward.These measures have been applied to several such units with significant improvements,which can provide important references for the maintenance and retrofit of 350-MW super critical steam turbines.展开更多
A nonlinear mathematical model for hydro turbine governing system with saturation nonlinearity in small perturbation has been proposed with all the essential components,i.e. turbine,PID type governor with saturation p...A nonlinear mathematical model for hydro turbine governing system with saturation nonlinearity in small perturbation has been proposed with all the essential components,i.e. turbine,PID type governor with saturation part and generator included in the model. Existence,stability and direction of Hopf bifurcation of an example HTGS are investigated in detail and presented in forms of bifurcation diagrams and time waveforms. The analysis show that a supercritical Hopf bifurcation may exist in hydraulic turbine systems in some certain conditions. Moreover,the dynamic behavior of system with different parameters such as Tw,Tab,Tyand K are studied extensively. An example with numerical simulations is presented to illustrate the theoretical results. The researches provide a reasonable explanation for the Hopf phenomenon happened in operation of hydroelectric generating unit.展开更多
In this paper,a radial inflow turbine is designed for the 150 kW S-CO_(2) Brayton cycle system,and flow characteristics and off-design performances are analyzed.The design results are accurate and high performances ca...In this paper,a radial inflow turbine is designed for the 150 kW S-CO_(2) Brayton cycle system,and flow characteristics and off-design performances are analyzed.The design results are accurate and high performances can be achieved for the S-CO_(2) power system,and the total-static efficiency of 86%and net output power about 285.2 kW can meet the design requirements of S-CO_(2) cycle system.The results of the flow characteristics show the streamlines of radial inflow turbine distribute uniformly,and the vortexes generated at the shroud of the blade suction surface have little influence on the turbine performances.The off-design performances show the total-static efficiency remains above 80%in the pressure ratio range of 1.6~2.9,and the output power and mass flow rate increase with the pressure ratio increasing.It is indicated that the designed turbine has excellent off-design performances and can meet the operation requirements.The study results can provide guidance for S-CO_(2) radial inflow turbine design and operation.展开更多
In this paper,a novel polygeneration system involving plasma gasifier,pyrolysis reactor,gas turbine(GT),supercritical CO_(2)(S-CO_(2))cycle,and organic Rankine cycle(ORC)has been developed.In the proposed scheme,the s...In this paper,a novel polygeneration system involving plasma gasifier,pyrolysis reactor,gas turbine(GT),supercritical CO_(2)(S-CO_(2))cycle,and organic Rankine cycle(ORC)has been developed.In the proposed scheme,the syngas is obtained by the gasification and the pyrolysis is first burned and drives the gas turbine for power generation,and then the resulting hot exhaust gas is applied to heat the working fluid for the supercritical CO_(2)cycle and the working fluid for the bottom organic Rankine cycle.In addition to the electrical output,the pyrolysis subsystem also produces pyrolysis oil and char.Accordingly,energy recovery is achieved while treating waste in a non-hazardous manner.The performance of the new scheme was examined by numerous methods,containing energy analysis,exergy analysis,and economic analysis.It is found that the net total energy output of the polygeneration system could attain 19.89 MW with a net total energy efficiency of 52.77%,and the total exergy efficiency of 50.14%.Besides,the dynamic payback period for the restoration of the proposed project is only 3.31 years,and the relative net present value of 77552640 USD can be achieved during its 20-year lifetime.展开更多
基金National Science Fund for Excellent Young Scholars,Grant/Award Number:52022066。
文摘The supercritical CO_(2)(sCO_(2))power cycle could improve efficiencies for a wide range of thermal power plants.The sCO_(2)turbine generator plays an important role in the sCO_(2)power cycle by directly converting thermal energy into mechanical work and electric power.The operation of the generator encounters challenges,including high temperature,high pressure,high rotational speed,and other engineering problems,such as leakage.Experimental studies of sCO_(2)turbines are insufficient because of the significant difficulties in turbine manufacturing and system construction.Unlike most experimental investigations that primarily focus on 100 kW‐or MW‐scale power generation systems,we consider,for the first time,a small‐scale power generator using sCO_(2).A partial admission axial turbine was designed and manufactured with a rated rotational speed of 40,000 rpm,and a CO_(2)transcritical power cycle test loop was constructed to validate the performance of our manufactured generator.A resistant gas was proposed in the constructed turbine expander to solve the leakage issue.Both dynamic and steady performances were investigated.The results indicated that a peak electric power of 11.55 kW was achieved at 29,369 rpm.The maximum total efficiency of the turbo‐generator was 58.98%,which was affected by both the turbine rotational speed and pressure ratio,according to the proposed performance map.
基金founded by the National Key R&D Program of China(Contract No.2016YFB060010)National Natural Science Foundation of China(Grant Nos.51606026 and 51876021)the Fundamental Research Funds for the Central Universities.
文摘For a radial inflow turbine(RIT),leakage flow in impeller backface cavity has critical impacts on aerodynamic performance of the RIT and axial force acting on the RIT impeller.In order to control this leakage flow,different types of labyrinth seals are numerically studied in this paper based on a supercritical carbon dioxide(S-CO_(2))RIT.The effects of seal clearance and cavity outlet pressure are first analyzed,and the impacts of seal design parameters,including height,number and shape of seal teeth,are evaluated.Results indicate that adding labyrinth seal can improve cavity pressure and hence adequately inhibits leakage flow.Decreasing the seal clearance and increasing the height of seal teeth are beneficial to improve sealing performance,and the same effect can be obtained by increasing the number of seal teeth.Meanwhile,employing seals can reduce leakage loss and improve RIT efficiency under a specific range of cavity outlet pressure.Finally,the influences of seal types on the flow field in seal cavity are numerically analyzed,and results demonstrate that isosceles trapezoidal type of seal cavity has better sealing performance than triangular,rectangular and right-angled trapezoidal seal cavities.
文摘In this paper the development status and background of 350-MW China-made supercritical steam turbines are introduced.Through the study on the eight turbines that are put into operation,their technical performances are compared and summarized.The major factors affecting the heat consumption rate are analyzed in details and the technical measures to reduce the heat consumption rate are put forward.These measures have been applied to several such units with significant improvements,which can provide important references for the maintenance and retrofit of 350-MW super critical steam turbines.
文摘A nonlinear mathematical model for hydro turbine governing system with saturation nonlinearity in small perturbation has been proposed with all the essential components,i.e. turbine,PID type governor with saturation part and generator included in the model. Existence,stability and direction of Hopf bifurcation of an example HTGS are investigated in detail and presented in forms of bifurcation diagrams and time waveforms. The analysis show that a supercritical Hopf bifurcation may exist in hydraulic turbine systems in some certain conditions. Moreover,the dynamic behavior of system with different parameters such as Tw,Tab,Tyand K are studied extensively. An example with numerical simulations is presented to illustrate the theoretical results. The researches provide a reasonable explanation for the Hopf phenomenon happened in operation of hydroelectric generating unit.
基金This study is partially supported by National Key R&D Program of China(Grant No.2017YFB0601804)Joint Funds Key Program of the National Natural Science Foundation of China(Grant No.U20A20303).
文摘In this paper,a radial inflow turbine is designed for the 150 kW S-CO_(2) Brayton cycle system,and flow characteristics and off-design performances are analyzed.The design results are accurate and high performances can be achieved for the S-CO_(2) power system,and the total-static efficiency of 86%and net output power about 285.2 kW can meet the design requirements of S-CO_(2) cycle system.The results of the flow characteristics show the streamlines of radial inflow turbine distribute uniformly,and the vortexes generated at the shroud of the blade suction surface have little influence on the turbine performances.The off-design performances show the total-static efficiency remains above 80%in the pressure ratio range of 1.6~2.9,and the output power and mass flow rate increase with the pressure ratio increasing.It is indicated that the designed turbine has excellent off-design performances and can meet the operation requirements.The study results can provide guidance for S-CO_(2) radial inflow turbine design and operation.
基金supported by the National Natural Science Fund of China(No.52106008)Science Fund for Creative Research Groups of the National Natural Science Foundation of China(No.51821004)Science and Technology Planning Project of Guangdong Province(No.2020B1212060048).
文摘In this paper,a novel polygeneration system involving plasma gasifier,pyrolysis reactor,gas turbine(GT),supercritical CO_(2)(S-CO_(2))cycle,and organic Rankine cycle(ORC)has been developed.In the proposed scheme,the syngas is obtained by the gasification and the pyrolysis is first burned and drives the gas turbine for power generation,and then the resulting hot exhaust gas is applied to heat the working fluid for the supercritical CO_(2)cycle and the working fluid for the bottom organic Rankine cycle.In addition to the electrical output,the pyrolysis subsystem also produces pyrolysis oil and char.Accordingly,energy recovery is achieved while treating waste in a non-hazardous manner.The performance of the new scheme was examined by numerous methods,containing energy analysis,exergy analysis,and economic analysis.It is found that the net total energy output of the polygeneration system could attain 19.89 MW with a net total energy efficiency of 52.77%,and the total exergy efficiency of 50.14%.Besides,the dynamic payback period for the restoration of the proposed project is only 3.31 years,and the relative net present value of 77552640 USD can be achieved during its 20-year lifetime.