In order to ease congestion and ground delays in major hub airports, an aircraft taxiing scheduling optimization model is proposed with schedule time as the object function. In the new model, the idea of a classical j...In order to ease congestion and ground delays in major hub airports, an aircraft taxiing scheduling optimization model is proposed with schedule time as the object function. In the new model, the idea of a classical job shop-schedule problem is adopted and three types of special aircraft-taxi conflicts are considered in the constraints. To solve such nondeterministic polynomial time-complex problems, the immune clonal selection algorithm(ICSA) is introduced. The simulation results in a congested hour of Beijing Capital International Airport show that, compared with the first-come-first-served(FCFS) strategy, the optimization-planning strategy reduces the total scheduling time by 13.6 min and the taxiing time per aircraft by 45.3 s, which improves the capacity of the runway and the efficiency of airport operations.展开更多
The gate assignment at an airport is one of the major activities in airport operations.With the increase of passenger traffic volumes and the number of flights, the complexity of this task and the factors to be consid...The gate assignment at an airport is one of the major activities in airport operations.With the increase of passenger traffic volumes and the number of flights, the complexity of this task and the factors to be considered have increased significantly, and an efficient gate utilizationhas received considerable attention. For overcoming the shortcomings of previous gate assignmentapproaches, this paper presents a partial parallel gate assignment approach, by which more factorsconcerning aircraft and gates can be collsidered at the same time. This paper also presents themethod of using a knowledge-based system combined with a mathematical programming method forgetting an optimized feasible assignment solution. By this way, it is more easily to get the solutionthat satisfies both the static and dynamic situations,and thus it may adapt well to meet the needsof actual use to rea-time operations. An experimental prototype has been implemented, and a casestudy is presented at the end of the paper.展开更多
基金Supported by the Basic Scientific Research Projects of the Central University of China(ZXH2010D010)the National Natural Science Foundation of China(60979021/F01)~~
文摘In order to ease congestion and ground delays in major hub airports, an aircraft taxiing scheduling optimization model is proposed with schedule time as the object function. In the new model, the idea of a classical job shop-schedule problem is adopted and three types of special aircraft-taxi conflicts are considered in the constraints. To solve such nondeterministic polynomial time-complex problems, the immune clonal selection algorithm(ICSA) is introduced. The simulation results in a congested hour of Beijing Capital International Airport show that, compared with the first-come-first-served(FCFS) strategy, the optimization-planning strategy reduces the total scheduling time by 13.6 min and the taxiing time per aircraft by 45.3 s, which improves the capacity of the runway and the efficiency of airport operations.
文摘The gate assignment at an airport is one of the major activities in airport operations.With the increase of passenger traffic volumes and the number of flights, the complexity of this task and the factors to be considered have increased significantly, and an efficient gate utilizationhas received considerable attention. For overcoming the shortcomings of previous gate assignmentapproaches, this paper presents a partial parallel gate assignment approach, by which more factorsconcerning aircraft and gates can be collsidered at the same time. This paper also presents themethod of using a knowledge-based system combined with a mathematical programming method forgetting an optimized feasible assignment solution. By this way, it is more easily to get the solutionthat satisfies both the static and dynamic situations,and thus it may adapt well to meet the needsof actual use to rea-time operations. An experimental prototype has been implemented, and a casestudy is presented at the end of the paper.