According to the Technical Guide for Climatic Feasibility Demonstration of Airport Project Site Selection,via statistical analysis on historical climate data of reference weather station,climatic background characteri...According to the Technical Guide for Climatic Feasibility Demonstration of Airport Project Site Selection,via statistical analysis on historical climate data of reference weather station,climatic background characteristics and meteorological disaster situation of preselected site,and characteristics of seasonal distribution,interannual variation and long-term trend of main meteorological elements and disasters were summarized.The difference of meteorological elements between preselected site and reference weather station and its cause were analyzed,and fine analysis of fog,low visibility event,wind,cloud and other meteorological elements or weather with high influence in preselected site was conducted.Climatic feasibility,advantages and disadvantages of meteorological conditions and possible meteorological risks in preselected site were evaluated.The research could provide decision-making basis for site selection of Lingling Airport and airport engineering design.Moreover,key technology route and research results were extracted,and technical analysis process of demonstration report was integrated,which could provide reference for climate feasibility demonstration on site selection of similar airports in China.展开更多
机场油库工程建设情况复杂,涉及专业多,工艺建造要求高,寿命周期长。采用先进管理技术对提高工程质量、节约成本、加快进度、保证安全等方面具有重要意义。建筑信息模型(Building Information Modeling,BIM)技术与传统计算机辅助设计(Co...机场油库工程建设情况复杂,涉及专业多,工艺建造要求高,寿命周期长。采用先进管理技术对提高工程质量、节约成本、加快进度、保证安全等方面具有重要意义。建筑信息模型(Building Information Modeling,BIM)技术与传统计算机辅助设计(Computer Aided Design,CAD)技术相比,具有可视化、协同性、高效性等优点,能够对工程从开始到结束进行准确控制。将BIM技术应用在机场油库工程的全寿命周期中,通过建立三维模型、碰撞检查、结构优化、造价计算、施工模拟等功能辅助进行工程管理,可提前发现和解决工程规划、勘察、设计和采购中的问题,对整个工程的施工重点和运营管理进行优化控制和重点监控,最终达到提高建设质量和运营管理水平等目的。若能解决人才不足、缺乏标准化、整合困难等问题,可以更好地将BIM技术推广到机场油库工程中。BIM技术将在机场油库工程的全寿命周期管理中发挥重要作用。展开更多
文摘According to the Technical Guide for Climatic Feasibility Demonstration of Airport Project Site Selection,via statistical analysis on historical climate data of reference weather station,climatic background characteristics and meteorological disaster situation of preselected site,and characteristics of seasonal distribution,interannual variation and long-term trend of main meteorological elements and disasters were summarized.The difference of meteorological elements between preselected site and reference weather station and its cause were analyzed,and fine analysis of fog,low visibility event,wind,cloud and other meteorological elements or weather with high influence in preselected site was conducted.Climatic feasibility,advantages and disadvantages of meteorological conditions and possible meteorological risks in preselected site were evaluated.The research could provide decision-making basis for site selection of Lingling Airport and airport engineering design.Moreover,key technology route and research results were extracted,and technical analysis process of demonstration report was integrated,which could provide reference for climate feasibility demonstration on site selection of similar airports in China.
文摘机场油库工程建设情况复杂,涉及专业多,工艺建造要求高,寿命周期长。采用先进管理技术对提高工程质量、节约成本、加快进度、保证安全等方面具有重要意义。建筑信息模型(Building Information Modeling,BIM)技术与传统计算机辅助设计(Computer Aided Design,CAD)技术相比,具有可视化、协同性、高效性等优点,能够对工程从开始到结束进行准确控制。将BIM技术应用在机场油库工程的全寿命周期中,通过建立三维模型、碰撞检查、结构优化、造价计算、施工模拟等功能辅助进行工程管理,可提前发现和解决工程规划、勘察、设计和采购中的问题,对整个工程的施工重点和运营管理进行优化控制和重点监控,最终达到提高建设质量和运营管理水平等目的。若能解决人才不足、缺乏标准化、整合困难等问题,可以更好地将BIM技术推广到机场油库工程中。BIM技术将在机场油库工程的全寿命周期管理中发挥重要作用。