期刊文献+
共找到252篇文章
< 1 2 13 >
每页显示 20 50 100
Effectiveness of groundwater extraction in Beijing since the ingauration of the first phase of the South-to-North Water Diversion Project, China
1
作者 Yuan-yuan Gao Qing-yu Sun +1 位作者 Ai-xin Wen Yan-pei Cheng 《Journal of Groundwater Science and Engineering》 2023年第3期294-307,共14页
This study assess the effectiveness of groundwater pressure extraction in Beijing since the opening of the first phase of the South-to-North Water Diversion Project,using survey and evaluation methods.Firstly,an analy... This study assess the effectiveness of groundwater pressure extraction in Beijing since the opening of the first phase of the South-to-North Water Diversion Project,using survey and evaluation methods.Firstly,an analysis of water consumption structure and the usage of diverted river water in Beijing in recent years was conducted.Secondly,the volume of groundwater pressure extraction in Beijing after the 33 project's inauguration was examined,revealing a decrease from 1.96 billion m^(3) in 2014 to 1.35 billion m^(3) in 2020.The proportion of water supply reduced from 52.3%in 2014 to 33.3%in 2020,leading to an optimized water supply structure.By the end of 2020,groundwater pressure extraction in Beijing is estimated at 446 million m3,with a substantial reduction in over-exploitation of groundwater.Groundwater resources have been effectively replenished,and the strategic reserve capacity has been enhanced.Furthermore,this study evaluates the change in groundwater levels as an indicator of the effectiveness of pressure extraction.The declining trend of groundwater levels in Beijing has been effectively mitigated,and there has been a consistent rebound in groundwater levels over the past five years. 展开更多
关键词 Beijing City south-to-north water diversion Groundwater Over-exploitation Groundwater Pressure Extraction
下载PDF
Water diversion and agricultural production:Evidence from China 被引量:1
2
作者 YANG Rui XU Hang 《Journal of Integrative Agriculture》 SCIE CAS CSCD 2023年第4期1244-1257,共14页
Water diversion can alleviate water shortages caused by the uneven distribution of water resources.China’s Southto-North Water Diversion Project(SNWD)is the largest water diversion project worldwide.Based on the pref... Water diversion can alleviate water shortages caused by the uneven distribution of water resources.China’s Southto-North Water Diversion Project(SNWD)is the largest water diversion project worldwide.Based on the prefecturelevel data of China’s Huang-Huai-Hai Plain from 2000 to 2020,this study employs an empirical strategy of Differencesin-Differences(DID)to analyze the impact of SNWD on agricultural production.The results show that SNWD has significantly increased agricultural production,measured by the agricultural value added.The estimated results of the benchmark model remain robust when the contemporaneous policy is addressed,an alternative outcome is used,subsamples are estimated,and alternative estimation techniques are employed.This study argues that the potential impact mechanism may be that SNWD significantly increases the acreage for cash crops but reduces that for grain crops.Heterogeneity analysis shows that in prefectures with high temperature or land potential,SNWD’s impact on agricultural value added is relatively low.In contrast,in areas with prolonged sunshine or high slopes,SNWD’s impact on agricultural value added is relatively large.Given the low added value of grain crops,the government should consider strengthening food security by subsidizing water supply to sustain grain production. 展开更多
关键词 south-to-north water diversion Project agricultural production Differences-in-Differences China
下载PDF
Spatio-temporal distribution of phytoplankton in the Danjiangkou Reservoir, a water source area for the South-to-North Water Diversion Project (Middle Route), China 被引量:12
3
作者 殷大聪 郑凌凌 宋立荣 《Chinese Journal of Oceanology and Limnology》 SCIE CAS CSCD 2011年第3期531-540,共10页
One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR ... One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR area before water diversion, as well as to estimate potential risks of water quality after water diversion, we conducted an investigation on phytoplankton in the DJKR from August 2008 to May 2009. The investigation included 10 sampling sites, each with four depths of 0.5, 5, 10, and 20 m. In this study, 117 taxa belonging to 76 genera were identified, consisting of diatoms (39 taxa), green algae (47 taxa), blue-green algae (19 taxa), and others (12 taxa). Annual average phytoplankton abundance was 2.01×10^6 ind./L, and the highest value was 14.72 ×10^6 ind/L (at site 3 in August 2008). Phytoplankton abundance in front of the Danjiangkou Dam (DJKD) was higher than that of the Danjiang Reservoir Basin. Phytoplankton distribution showed a vertical declining trend from 0.5 m to 20 m at most sites in August 2008 (especially at sites of 1, 2, 4 and 10), but no distinct pattern in other sampling months. In December 2008 and March 2009, Stephanodiseus sp. was the most abundant species, amounting to 55.23% and 72.34%, respectively. We propose that high abundance ofStephanodiscus sp. may have contributed greatly to the frequent occurrence of Stephanodiscus sp. blooms in middle-low reaches of the Hanjiang River during the early spring of 2009. In comparison with previous studies conducted from 1992 to 2006, annual average phytoplankton density, green algae and blue-green algae species, as well as major nutrient concentrations increased, while phytoplankton diversity indices declined. This indicates a gradual decline in water quality. More research should be conducted and countermeasures taken to prevent further deterioration of water quality in the DJKR. 展开更多
关键词 Danjiangkou Reservoir PHYTOPLANKTON south-to-north water diversion Project EUTROPHICATION
下载PDF
Optimization and coordination of South-to-North Water Diversion supply chain with strategic customer behavior 被引量:4
4
作者 Zhi-song CHEN Hui-min WANG 《Water Science and Engineering》 EI CAS 2012年第4期464-477,共14页
The South-to-North Water Diversion (SNWD) Project is a significant engineering project meant to solve water shortage problems in North China. Faced with market operations management of the water diversion system, th... The South-to-North Water Diversion (SNWD) Project is a significant engineering project meant to solve water shortage problems in North China. Faced with market operations management of the water diversion system, this study defined the supply chain system for the SNWD Project, considering the actual project conditions, built a decentralized decision model and a centralized decision model with strategic customer behavior (SCB) using a floating pricing mechanism (FPM), and constructed a coordination mechanism via a revenue-sharing contract. The results suggest the following: (1) owing to water shortage supplements and the excess water sale policy provided by the FPM, the optimal ordering quantity of water resources is less than that without the FPM, and the optimal profits of the whole supply chain, supplier, and external distributor are higher than they would be without the FPM; (2) wholesale pricing and supplementary wholesale pricing with SCB are higher than those without SCB, and the optimal profits of the whole supply chain, supplier, and external distributor are higher than they would be without SCB; and (3) considering SCB and introducing the FPM help increase the optimal profits of the whole supply chain, supplier, and external distributor, and improve the efficiency of water resources usage. 展开更多
关键词 south-to-north water diversion supply chain strategic customer behavior floatingpricing mechanism
下载PDF
Critical chain construction with multi-resource constraints based on portfolio technology in South-to-North Water Diversion Project 被引量:3
5
作者 Jing-chun FENG Lei LI +4 位作者 Nan YANG Yu-zhen HONG Min PANG Xiong YAO Li-cheng WANG 《Water Science and Engineering》 EI CAS 2011年第2期225-236,共12页
Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the sy... Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the system analysis theory and project portfolio theory, this paper discusses the creation of project portfolios based on the similarity principle and gives the definition of priority in multi-resource allocation based on quantitative analysis. A model with multi-resource constraints, which can be applied to the critical chain construction of the A-bid section in the South-to-North Water Diversion Project, was proposed. Contrast analysis with the comprehensive treatment construction method and aggressive treatment construction method was carried out. This paper also makes suggestions for further research directions and subjects, which will be useful in improving the theories in relevant research fields. 展开更多
关键词 multi-resource constraints south-to-north water diversion Project project portfolio critical chain
下载PDF
Reliability model of organization management chain of South-to-North Water Diversion Project during construction period 被引量:3
6
作者 Feng Jingchun Zhou Yang +2 位作者 Hong Yuzhen Zhao Shixin Ren Xiaoqiang 《Water Science and Engineering》 EI CAS 2008年第4期107-113,共7页
In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connectio... In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connection and parallel connection) of the organization management chain can be abstracted. The indispensability of each form has been studied and is described in this paper. Through analysis of the reliability of the two basic forms, reliability models of the organization management chain in the series connection state and the mixed state of both series connection and parallel connection have been set up. 展开更多
关键词 south-to-north water diversion Project reliability model management chain parallel connection series connection
下载PDF
Wet-Dry Runoff Correlation in Western Route of South-to-North Water Diversion Project,China 被引量:2
7
作者 HUANG Xiao-rong ZHAO Jing-wei YANG Peng-peng 《Journal of Mountain Science》 SCIE CSCD 2015年第3期592-603,共12页
The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries (water-exporting area), to the upst... The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries (water-exporting area), to the upstream of the Yellow River (water- importing area). The long-term hydrologieal data from 14 stream gauging stations in the Western Route area and techniques including the pre-whitening approach, non-parametric test, Bayes, law, variance analysis extrapolation, and Wavelet Analysis are applied to identify the streamflow eharacteristics and trends, streamflow time series cross-correlations, wetness-dryness encountering probability, and periodicities that occurred over the last 50 years. The results show that the water-exporting area, water- importing area, and the streteh downstream of the water-exporting have synehronization in high-low flow relationship, whereas they display non- synchronization in long-term evolution. This corresponds to the complicated and variable climate of the plateau region. There is no obvious increasing or decreasing trend in runoff at any gauging station. The best hydrological eompensation probability for rivers where water is diverted is about 25% to lO%, and those rivers influenced significantly by diversion are the Jinsha and Yalong rivers. Proper planning and design of compensation reservoirs for the water-exporting area and stretch downstream of the water- exporting area can increase the hydrological compensation possibility from water-exporting area to the water-importing area, and reduce the impact on the stretch of river downstream of the water- exporting area. 展开更多
关键词 south-to-north water diversion Project Yangtze River Streamflow Encounter probability Correlation coefficient Cycle Hydrologicalcompensation
下载PDF
Land Cover Changes and Drivers in the Water Source Area of the Middle Route of the South-to-North Water Diversion Project in China from 2000 to 2015 被引量:3
8
作者 GAO Wenwen ZENG Yuan +2 位作者 ZHAO Dan WU Bingfang REN Zhiyuan 《Chinese Geographical Science》 SCIE CSCD 2020年第1期115-126,共12页
The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial u... The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial use.The water source area of the MR-SNWDP is the region that is most sensitive to and most affected by the construction of this water diversion project.In this study,we used Landsat Thematic Mapper(TM)and HJ-1 A/B images from 2000 to 2015 by an object-based approach with a hierarchical classification method for mapping land cover in the water source area.The changes in land cover were illuminated by transfer matrixes,single dynamic degree,slope zones and fractional vegetation cover(FVC).The results indicated that the area of cropland decreased by 31%and was replaced mainly by shrub over the past 15 years,whereas forest and settlements showed continuous increases of 29.2% and 77.7%,respectively.The changes in cropland were obvious in all slope zones and decreased most remarkably(–43.8%)in the slope zone above 25°.Compared to the FVC of forest and shrub,significant improvement was exhibited in the FVC of grassland,with a growth rate of 16.6%.We concluded that local policies,including economic development,water conservation and immigration resulting from the construction of the MR-SNWDP,were the main drivers of land cover changes;notably,they stimulated the substantial and rapid expansion of settlements,doubled the wetlands and drove the transformation from cropland to settlements in immigration areas. 展开更多
关键词 remote sensing land cover change object-based classification Middle Route of the south-to-north water diversion Project(MR-SNWDP) China
下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
9
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model south-to-north water diversion Project
下载PDF
IMPACTS OF THE SOUTH-TO-NORTH WATER DIVERSION PROJECTS (MIDDLE ROUTE)ON THE WATER ENVIRONMENT OF THE MIDDLE AND LOWER REACHES OF THE HANJIANG RIVER
10
作者 FAN Bei-Lin, WAN Jian-Rong, ZHANG Jie and LIN Qiu-Sheng (Yangtze River Scientific Research Institute,River Research Deparment, Wuhan 430010,China) 《水生生物学报》 CAS CSCD 北大核心 2006年第6期643-646,共4页
In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well... In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well as their impacts on the environment of the middle and lower reaches of the Hanjiang River. The results showed that the 95×10 8m 3 water diversion scheme will cause less erosion and water level decrease than the 15×10 8m 3 water diversion scheme. Using a water diversion scheme of 95×10 8m 3, the decrease of water quantity can impact the river hydrodynamic regime substantially and the environments of the middle and lower reaches of the Hanjiang River will be greatly affected. It is therefore necessary to develop new water resources or build projects to meet the need of the environment and the needs for navigation. 展开更多
关键词 south-to-north water diversion Project River regime water environment Mathematical model
下载PDF
3D Finite Element Analysis of TBM Water Diversion Tunnel Segment Coupled with Seepage Field 被引量:4
11
作者 钟登华 胡能明 +2 位作者 程正飞 吕鹏 佟大威 《Transactions of Tianjin University》 EI CAS 2016年第1期35-42,共8页
In most studies of tunnel boring machine(TBM)tunnelling, the groundwater pressure was not considered, or was simplified and exerted on the boundary of lining structure. Meanwhile, the leakage, which mainly occurs in t... In most studies of tunnel boring machine(TBM)tunnelling, the groundwater pressure was not considered, or was simplified and exerted on the boundary of lining structure. Meanwhile, the leakage, which mainly occurs in the segment joints, was often ignored in the relevant studies of TBM tunnelling. Additionally, the geological models in these studies were simplified to different extents, and mostly were simplified as homogenous bodies. Considering the deficiencies above, a 3D refined model of the surrounding rock of a tunnel is firstly established using NURBS-TIN-BRe P hybrid data structure in this paper. Then the seepage field of the surrounding rock considering the leakage in the segment joints is simulated. Finally, the stability of TBM water diversion tunnel is studied coupled with the seepage simulation, to analyze the stress-strain conditions, the axial force and the bending moment of tunnel segment considering the leakage in the segment joints. The results illustrate that the maximum radial displacement, the minimum principal stress, the maximum principal stress and the axial force of segment lining considering the seepage effect are all larger than those disregarding the seepage effect. 展开更多
关键词 segment lining seepage-stress coupling 3D geological model TBM water diversion tunnel
下载PDF
Critical discharge at Datong for controlling operation of South-to-North Water Transfer Project in dry seasons 被引量:3
12
作者 Wang Yigang Huang Huiming Li Xi 《Water Science and Engineering》 EI CAS 2008年第2期47-58,共12页
Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will dec... Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will decrease due to the construction and operation of large water diversion projects, including the South-to-North Water Transfer Project, which will further exacerbate saltwater intrusion in the estuary. In this paper, a nested 1D river network model and a 2D saltwater numerical model are used to associate saltwater intrusion in the Yangtze Estuary with different values of discharge at Datong. It is concluded that 13 000 m3/s is the critical discharge at Datong for preventing saltwater intrusion and controlling the volume of water transferred by the South-to-North Water Transfer Project. Furthermore, based on the analysis of river discharge from Datong to Xuliujing and in consideration of the influence of all of the water diversion projects, operation schemes are proposed for the Eastern Route of the South-to-North Water Transfer Project for different hydrological years. 展开更多
关键词 saltwater intrusion critical discharge at Datong water diversion the south-to-north water Transfer Project
下载PDF
Geological conditions and key rock mechanics issues in the Western Route of South-to-North Water Transfer Project 被引量:2
13
作者 XuechaoWang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第3期234-243,共10页
In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel... In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine (TBM). The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices. Damage, deformation and evolution of surrounding rocks induced by TBM excavation are discussed. Meanwhile, the long-term deformation mechanisms and stability of surrounding rocks are also studied. On this basis, a three-dimensional constitutive model for interbedded sandstone slate and a fiat shell-joint element-foundation system for calculating internal forces of segment lining are established. The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented. Finally, the design methods of segment lining constructed in deep and steep flysch are proposed. 展开更多
关键词 the Western Route of south-to-north water Transfer Project rock mechanics issues classification of surrounding rocks stability of surrounding rocks excavation-induced damage lining design
下载PDF
Water-saving potential evaluation of water-receiving regions in Shandong province on the East Route of the South-to-North Water Transfer Project of China
14
作者 YIN Xiao-lin GAO Yuan-yuan +1 位作者 WU Hai-ping ZHAO Xue-ming 《Journal of Groundwater Science and Engineering》 2020年第3期287-297,共11页
Taking 13 water-receiving areas on the East Route of the South-to-North Water Diversion Project(ERSNWDP)in Shandong Province as the study area,and comparing it with Jiangsu Province on the ERSNWDP and the Middle Route... Taking 13 water-receiving areas on the East Route of the South-to-North Water Diversion Project(ERSNWDP)in Shandong Province as the study area,and comparing it with Jiangsu Province on the ERSNWDP and the Middle Route of the South-to-North(MRSNWDP),the current water-saving potential of the water-receiving areas within the municipalities of Shandong was analyzed.Different water-saving scenarios were constructed and analyzed with key water-saving indexes in various industries.These indexes include the effective utilization coefficient of farmland irrigation water,total water consumption of industrial sectors with an added value of over 10000 RMB,average leakage rate of the urban public water supply pipe network and the penetration rate of water-saving appliances.Based on the scenarios,comprehensive water-saving potential of the 13 water-receiving area cities was calculated.The results show that the water-saving potential of the study area is at a relative high level.However,some cities still have a certain amount of water-saving potential for agriculture and industry to be elevated.Under the recommended water-saving scenario,the water-saving potential is 1.134 billion m3,accounting for 5.33%of the current total water consumption,of which 460 million m3 is in agriculture,600 million m3 in industry,is and 74.20 million m3 in urban domestic sector.Comprehensive water-saving measures for the study area were proposed from the aspects of agricultural,industrial and domestic water uses.Agricultural and industrial water saving are more significant.The major cities for agricultural water saving include Jining City,Heze City,Weifang City and Jinan City;the focus cities of industrial water saving mainly include Weihai City,Jining City and Qingdao City and etc.;the key water-saving areas for urban use mainly include Zaozhuang City,Jining City and Heze City. 展开更多
关键词 East Route of south-to-north water diversion Project Shandong water receiving area water-saving level water-saving potential
下载PDF
过活断层倒虹吸地面压力管结构型式比较研究
15
作者 李端正 李玉峰 +1 位作者 白锐 陈俊涛 《人民长江》 北大核心 2024年第2期171-178,210,共9页
以往对过活断层倒虹吸地面压力管道研究,往往只单独研究钢衬钢筋混凝土管和明钢管两种结构型式,具体哪种管型更为合适尚无比较。采用有限元方法,通过建立地面钢衬钢筋混凝土管和明钢管两种管道有限元模型,对比分析了两种管道型式过活断... 以往对过活断层倒虹吸地面压力管道研究,往往只单独研究钢衬钢筋混凝土管和明钢管两种结构型式,具体哪种管型更为合适尚无比较。采用有限元方法,通过建立地面钢衬钢筋混凝土管和明钢管两种管道有限元模型,对比分析了两种管道型式过活断层倒虹吸在断层蠕滑变形、黏滑变形以及地震作用下的位移和应力。研究结果表明:①钢衬钢筋混凝土管和明钢管管线中布置多个波纹管伸缩节后,均能较好适应断层蠕滑变形;②两种管道结构位于主断层范围的波纹管伸缩节在断层黏滑变形作用下变形均在100 mm以上,设计难度大;③地震作用下,在主断层范围内的钢衬钢筋混凝土管虽然位移大,但地震引起的应力较小,而明钢管在固定支座处的受力情况明显恶化;④综合多种工况的计算结果,钢衬钢筋混凝土管的受力情况比明钢管更优秀,但明钢管具备运行期检修复位的条件,两种管道方案各有优劣,应根据工程具体需求合理选择管道结构型式。 展开更多
关键词 活断层 断层错动 倒虹吸 钢衬钢筋混凝土管 明钢管 波纹管伸缩节 滇中引水工程
下载PDF
富水环境下引水隧洞二次衬砌防水技术创新
16
作者 姜立洋 《中国建筑防水》 2024年第5期37-41,共5页
富水隧洞施工过程中的防水施工技术很大程度上决定了隧洞建设项目的效果,如果施工中出现二衬混凝土脱落、裂缝,或者止水带平直度很差,都会导致隧洞渗漏水,为工程运行带来不利影响。本文结合吉林中部城市引松供水工程隧洞施工实例,分析... 富水隧洞施工过程中的防水施工技术很大程度上决定了隧洞建设项目的效果,如果施工中出现二衬混凝土脱落、裂缝,或者止水带平直度很差,都会导致隧洞渗漏水,为工程运行带来不利影响。本文结合吉林中部城市引松供水工程隧洞施工实例,分析了二次衬砌拱部纵向退管带模注浆工艺、自粘反粘式防水板、新型止水带夹具等新工艺、新技术在解决隧洞二衬裂缝、渗水、漏水、脱空、止水带平直度差等常见工程问题上的作用。 展开更多
关键词 富水环境 引水隧洞 二次衬砌 纵向退管带模注浆工艺 自粘反粘式防水板 止水带夹具
下载PDF
南水北调东线一期北延应急供水工程衬砌施工
17
作者 张笛 王庆帅 《山东水利》 2024年第3期18-20,共3页
在南水北调东线一期工程北延应急供水工程施工中,为增加应急调水输水能力,同时保证渠道输水安全,在基本不增加原设计水位条件下提高了六分干的过流能力。本文简述了工程六分干渠道衬砌段施工流程及施工质量控制措施,总结了施工经验,提... 在南水北调东线一期工程北延应急供水工程施工中,为增加应急调水输水能力,同时保证渠道输水安全,在基本不增加原设计水位条件下提高了六分干的过流能力。本文简述了工程六分干渠道衬砌段施工流程及施工质量控制措施,总结了施工经验,提出建议对策,为类似项目施工提供借鉴。 展开更多
关键词 南水北调东线一期 应急供水 渠道输水 衬砌施工
下载PDF
浅析平底圆形引水隧洞衬砌混凝土裂缝控制方法
18
作者 陈成锋 罗小成 《水利建设与管理》 2024年第8期40-47,共8页
二次衬砌混凝土是引水隧洞除灌浆外最后一道主体工程施工程序,其浇筑质量的好坏对通水后的正常运行关系重大。良好的衬砌质量,可以显著提高工程运行寿命,降低维护成本,有效确保供水效果。对衬砌混凝土质量影响最大的是裂缝,尤其是贯穿... 二次衬砌混凝土是引水隧洞除灌浆外最后一道主体工程施工程序,其浇筑质量的好坏对通水后的正常运行关系重大。良好的衬砌质量,可以显著提高工程运行寿命,降低维护成本,有效确保供水效果。对衬砌混凝土质量影响最大的是裂缝,尤其是贯穿渗漏裂缝,其对整个隧洞正常运行的影响通常是致命性的,裂缝发展通常会加速混凝土老化,破坏混凝土内外结构,影响使用寿命,要重点加以研究。裂缝产生的原因是多方面的,需要从设计、施工以及养护等各个环节进行把控。本文结合工程实际,对隧洞衬砌混凝土裂缝控制方法进行介绍,供类似工程借鉴。 展开更多
关键词 引水隧洞 衬砌混凝土 裂缝控制方法
下载PDF
严重不良地质隧洞局部调线综合探测技术的应用
19
作者 徐刚 《市政技术》 2024年第9期135-145,共11页
综合探测技术能有效探明隧洞周边断层破碎带、软弱夹层、含水构造等不良地质体信息,可为隧洞局部改线提供重要依据。因此,在解决狮子山输水隧洞DLII38+372—DLII38+420段出现围岩渗透破坏、塌方、突泥涌水等难以处置的工程问题中,采用TR... 综合探测技术能有效探明隧洞周边断层破碎带、软弱夹层、含水构造等不良地质体信息,可为隧洞局部改线提供重要依据。因此,在解决狮子山输水隧洞DLII38+372—DLII38+420段出现围岩渗透破坏、塌方、突泥涌水等难以处置的工程问题中,采用TRT6000、TGS、瞬变电磁法等探测技术对隧洞线路局部调整提供了支撑。隧洞掌子面前方超前综合地质探测结果表明,地震波法和电法探测结果与超前钻探结果吻合性较好,隧洞掌子面前方节理裂隙发育,岩体破碎,开挖时易出现股状流水或涌泥,说明隧洞局部调线是必要的;隧洞左、右边墙综合探测预报表明,隧洞左侧低阻异常区往内侧延伸大于10 m,变形、塌方、涌水突泥风险高,右侧30 m深度内钻孔基本无水,地下水活动弱,地质条件相对稍好,线路可往右侧调整。该探测结果可为输水隧洞线路调整提供详细的地质参考,同时也可为类似工程问题提供案例参考。 展开更多
关键词 输水隧洞 不良地质 改线方案 综合超前地质预报 超前钻探
下载PDF
Transverse Eco-compensation Standards for Water Conservation:A Case Study of the Middle Route Project of South-to-North Water Diversion in China 被引量:12
20
作者 YANG Lun LIU Moucheng +1 位作者 MIN Qingwen LUN Fei 《Journal of Resources and Ecology》 CSCD 2018年第4期395-406,共12页
In China,the distribution of water resources is incompatible with the development of productivity.The construction of South-to-North Water Diversion Project has achieved inter-basin water diversion,and the project can... In China,the distribution of water resources is incompatible with the development of productivity.The construction of South-to-North Water Diversion Project has achieved inter-basin water diversion,and the project can alleviate the uneven distribution of water resources phenomenon effectively.However,in recent years,the aggregate effects of water pollution and water resource shortages have been serious.Establishing transverse eco-compensation mechanisms becomes the key method to achieve sustainable use of water resources.Based on statistical and questionnaire data,this paper uses the Opportunity Costs Method and Willingness to Pay approach to establish a transverse eco-compensation standard calculation model for the Middle Route Project of the Southto-North Water Diversion.The results show that the upper and lower limits of the transverse eco-compensation standard for the Middle Route Project is $2.52 billion and $2.20 billion every year,respectively.However,the paying and receiving standards varied widely among different compensation payers and compensation receivers.Meanwhile,the significant factors influencing the paying willingness of the receiver area citizens were age,education level,average revenue per month,knowledge about the South-to-North Water Diversion Project and recognition of the importance of eco-environmental integrity.This study began with a theoretical analysis,then analysed related problems related to calculating transverse eco-compensation standards for the Middle Route Project of the South-to-North Water Diversion by an empirical study.This empirical study helps to establish effective transverse eco-compensation mechanisma and promotea the development of effective policies and legislation. 展开更多
关键词 transverse eco-compensation standards opportunity cost method willingness to pay Middle RouteProject of south-to-north water diversion
原文传递
上一页 1 2 13 下一页 到第
使用帮助 返回顶部