The anchor stress extent of a prestress anchor cable project has a direct relation with the project safety and performance. Prestressed tensioning method is a kind of nondestructive testing method, by which a reverse ...The anchor stress extent of a prestress anchor cable project has a direct relation with the project safety and performance. Prestressed tensioning method is a kind of nondestructive testing method, by which a reverse stretching load is applied on the external exposure section of anchor cable under construction or in service, and then the elongation variation of stress bars is measured to determine the anchor stress. We elaborated the theory and testing mechanism of prestressed tensioning method, and systematically studied key issues during the prestressed tensioning process of anchor cable by using physical model test, including the composition of tension stress-elongation curve, the variation of anchor stress, the compensation of locked anchor stress, and the judgment of anchor stress, and verified the theory feasibility of prestressed tensioning method. A case study on slope anchor cable of one highway project was conducted to further discuss on the test method, operation procedures and judgment of prestressed tensioning method on obtaining anchor stress, and then the test data of three situations were analyzed. The result provides a theoretical basis and technical base for the application of prestressed tensioning method to the evaluation of construction quality and operation conditions of anchor cable project.展开更多
To obtain the deep displacement of the coal seam in the working face,multi-point displacements were installed in the coal seam, but the installation of multi-point displacement is differen tunder different geological ...To obtain the deep displacement of the coal seam in the working face,multi-point displacements were installed in the coal seam, but the installation of multi-point displacement is differen tunder different geological conditions. This paper is based on the splitting and merging of 7_1 coal and 7_2 coal in Huaibei Mining(Group) Co., Ltd., and analyzes properties of the roof andcoal in the 7_2 coal of the lower coal seam of bifurcation area, and calculates the damage depth of the floor in the process of 7_1 coal mining. The multi-point displacement meter installation is often challenged by hole collapse, stuck pole and broken installation rod in 7_2 coal of the soft coal seam of bifurcation area, as a result, the base points can't be installed in the specified location. In view of this, this paper adopts a new anchor cable mounting rod which can install the whole base points to the specified location without stuck pole or broken mounting stem. All the basic displacement data can be obtained, and the law of mine pressure appearance in stope and tunnel can be accurately controlled, which can be used to maintain the stability of roadway and the safety of stope.展开更多
The objective of this research was to assess the characteristics of seismic induced damage and the deformation patterns of pre-stressed cement-grouted cables that are used for rock slope stabilization projects subject...The objective of this research was to assess the characteristics of seismic induced damage and the deformation patterns of pre-stressed cement-grouted cables that are used for rock slope stabilization projects subjected to quasi-static cyclic loading.The experimental configuration includes the installation of 15 pre-stressed cables in a slope model made of concrete blocks(theoretically rigid rock mass) on top of a pre-existing sliding surface.The study showed that:(i) The pre-stressed cables exhibited great seismic performance.Rapid displacement of the model blocks was observed after the complete loss of the initial pre-stress load under continued applied cyclic loads and exceedance of the state of equilibrium,which implies the higher the initial pre-stress load,the better the seismic performance of the rock anchor;(ii) The failure of the pre-stressed cables was due to fracture at the connection of the tendons and cable heads under cyclic loading.The sequence of failure had a distinct pattern.Failure was first observed at the upper row of cables,which experienced the most severe damage,including the ejection of cable heads.No evidence of de-bonding was observed during the cyclic loading;(iii) The stress distribution of the bond length for pre-stressed cables was highly non-uniform.High stress concentrations were observed at both the fixed end and the free end of the bond length both before and immediately after the state of equilibrium is exceeded.The results obtained can be used to evaluate the overall performance of pre-stressed rock anchors subject to seismic loading and their potential as rockfall prevention and stabilization measures.展开更多
基金Funded by the Science and Technolog Program of Ministry of Transport of P.R.China(No.2012318352100)
文摘The anchor stress extent of a prestress anchor cable project has a direct relation with the project safety and performance. Prestressed tensioning method is a kind of nondestructive testing method, by which a reverse stretching load is applied on the external exposure section of anchor cable under construction or in service, and then the elongation variation of stress bars is measured to determine the anchor stress. We elaborated the theory and testing mechanism of prestressed tensioning method, and systematically studied key issues during the prestressed tensioning process of anchor cable by using physical model test, including the composition of tension stress-elongation curve, the variation of anchor stress, the compensation of locked anchor stress, and the judgment of anchor stress, and verified the theory feasibility of prestressed tensioning method. A case study on slope anchor cable of one highway project was conducted to further discuss on the test method, operation procedures and judgment of prestressed tensioning method on obtaining anchor stress, and then the test data of three situations were analyzed. The result provides a theoretical basis and technical base for the application of prestressed tensioning method to the evaluation of construction quality and operation conditions of anchor cable project.
基金Sponsored by National Natural Science Fund of China(51474005)
文摘To obtain the deep displacement of the coal seam in the working face,multi-point displacements were installed in the coal seam, but the installation of multi-point displacement is differen tunder different geological conditions. This paper is based on the splitting and merging of 7_1 coal and 7_2 coal in Huaibei Mining(Group) Co., Ltd., and analyzes properties of the roof andcoal in the 7_2 coal of the lower coal seam of bifurcation area, and calculates the damage depth of the floor in the process of 7_1 coal mining. The multi-point displacement meter installation is often challenged by hole collapse, stuck pole and broken installation rod in 7_2 coal of the soft coal seam of bifurcation area, as a result, the base points can't be installed in the specified location. In view of this, this paper adopts a new anchor cable mounting rod which can install the whole base points to the specified location without stuck pole or broken mounting stem. All the basic displacement data can be obtained, and the law of mine pressure appearance in stope and tunnel can be accurately controlled, which can be used to maintain the stability of roadway and the safety of stope.
基金financially supported by the National Basic Research Program of China (973 Program) (Grant No.2013CB733202)the National Natural Science Foundation of China (Grant No.41102191)+1 种基金the State Key Laboratory of Geohazard Prevention and Geoenvironment Protection (Chengdu University of Technology) (Grant No.SKLGP2011Z019)the National Natural Science Foundation of China (Grant No.11670589)
文摘The objective of this research was to assess the characteristics of seismic induced damage and the deformation patterns of pre-stressed cement-grouted cables that are used for rock slope stabilization projects subjected to quasi-static cyclic loading.The experimental configuration includes the installation of 15 pre-stressed cables in a slope model made of concrete blocks(theoretically rigid rock mass) on top of a pre-existing sliding surface.The study showed that:(i) The pre-stressed cables exhibited great seismic performance.Rapid displacement of the model blocks was observed after the complete loss of the initial pre-stress load under continued applied cyclic loads and exceedance of the state of equilibrium,which implies the higher the initial pre-stress load,the better the seismic performance of the rock anchor;(ii) The failure of the pre-stressed cables was due to fracture at the connection of the tendons and cable heads under cyclic loading.The sequence of failure had a distinct pattern.Failure was first observed at the upper row of cables,which experienced the most severe damage,including the ejection of cable heads.No evidence of de-bonding was observed during the cyclic loading;(iii) The stress distribution of the bond length for pre-stressed cables was highly non-uniform.High stress concentrations were observed at both the fixed end and the free end of the bond length both before and immediately after the state of equilibrium is exceeded.The results obtained can be used to evaluate the overall performance of pre-stressed rock anchors subject to seismic loading and their potential as rockfall prevention and stabilization measures.