期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Projective synchronisation with non-delayed and delayed coupling in complex networks consisting of identical nodes and different nodes
1
作者 杜瑞瑾 董高高 +2 位作者 田立新 郑松 孙梅 《Chinese Physics B》 SCIE EI CAS CSCD 2010年第7期113-122,共10页
This paper first investigates the projective synchronisation problem with non-delayed and delayed coupling between drive-response dynamical networks consisting of identical nodes and different nodes. Based on Lyapunov... This paper first investigates the projective synchronisation problem with non-delayed and delayed coupling between drive-response dynamical networks consisting of identical nodes and different nodes. Based on Lyapunov stability theory, several nonlinear controllers are applied to achieve the projective synchronisation between the drive-response dynamical networks; simultaneously the topological structure of the drive dynamical complex networks can be exactly identified. Moreover, numerical examples are presented to verify the feasibility and effectiveness of the theorems. 展开更多
关键词 adaptive projective synchronisation drive-response dynamical networks non-delayedand delayed coupling identical and different nodes
下载PDF
Proposed Flexibility to USA Nuclear Waste Management Strategy
2
作者 Salomon Levy 《Journal of Energy and Power Engineering》 2012年第5期667-673,共7页
USA nuclear waste management program has stalled due to its continued insistence upon using Yucca Mountain for its disposal of DOE (Department of Energy) and commercial power plants NSF (nuclear spent fuel). Incre... USA nuclear waste management program has stalled due to its continued insistence upon using Yucca Mountain for its disposal of DOE (Department of Energy) and commercial power plants NSF (nuclear spent fuel). Increased flexibility and significant changes in DOE program are proposed. They include a private waste company to manage it; the construction and operation of ICS (interim centralized storage) facilities for NSF; the search for an AGR (alternate geological repository); the use of a different methodology involving key local and state participants; a new "as safe as practical" strategy with defined benefits to the involved locations and states. Assured removal of NSF from ICS and providing limited Price Anderson indemnity for the program will enhance its acceptance. Minimum politics, regular information meetings, compromises, good cost projections and meeting schedules will be necessary to increase the chances of the proposed nuclear waste management program. 展开更多
关键词 Nuclear waste management interim centralized storage geological repository flexible and different strategy.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部