The model test result of earth force in the side of anti-slide pile of anchor bars was introduced.There are three groups of the tests.The loads were on the back side of the slope in two groups.The other one was loaded...The model test result of earth force in the side of anti-slide pile of anchor bars was introduced.There are three groups of the tests.The loads were on the back side of the slope in two groups.The other one was loaded just behind the pile by the jack.In order to get the force of the soil,some earth-pressure boxes were used to get the earth pressure on the side of the piles.The part of the max pressure and the earth pressure was mainly focused under the slip line展开更多
Based on the requirement of seismic reinforcement of bridge foundation on slope in the Chengdu-Lanzhou railway project,a shaking table model test of anti-slide pile protecting bridge foundation in landslide section is...Based on the requirement of seismic reinforcement of bridge foundation on slope in the Chengdu-Lanzhou railway project,a shaking table model test of anti-slide pile protecting bridge foundation in landslide section is designed and completed. By applying Wenchuan seismic waves with different acceleration peaks,the stress and deformation characteristics of bridge pile foundation and anti-slide pile are analyzed,and the failure mode is discussed. Results show that the dynamic response of bridge pile and anti-slide pile are affected by the peak value of seismic acceleration of earthquake,with which the stress and deformation of the structure increase. The maximum dynamic earth pressure and the moment of anti-slide piles are located near the sliding surface,while that of bridge piles are located at the top of the pile. Based on the dynamic response of structure,local reinforcement needs to be carried out to meet the requirement of the seismic design. The PGA amplification factor of the surface is greater than the inside,and it decreases with the increase of the input seismic acceleration peak. When the slope failure occurs,the tension cracks are mainly produced in the shallow sliding zone and the coarse particles at the foot of the slope are accumulated.展开更多
Large-scale shaking table tests were conducted to study the dynamic response of a slope reinforced by double-row anti-sliding piles and prestressed anchor cables. The test results show that the reinforcement suppresse...Large-scale shaking table tests were conducted to study the dynamic response of a slope reinforced by double-row anti-sliding piles and prestressed anchor cables. The test results show that the reinforcement suppressed the acceleration amplification effectively. The axial force time histories are decomposed into a baseline part and a vibration part in this study. The baseline part of axial force well revealed the seismic slope stability, the peak vibration values of axial force of the anchor cables changed significantly in different area of the slope under seismic excitations. The peak lateral earth pressure acting on the back of the anti-sliding pile located at the slope toe was much larger than that acting on the back of the anti-sliding pile located at the slope waist. The test results indicate an obvious load sharing ratio difference between these two anti-slide piles, the load sharing ratio between the two anti-sliding piles located at the slope toe and the slope waist varied mainly in a range of 2-5. The anti-slide pile at the slope waist suppressed the horizontal displacement of the slope surface.展开更多
Pre-stressed rope reinforced anti-sliding pile is a composite anti-sliding structure. It is made up of pre-stressed rope and general anti-sliding pile. It can bring traditional anti-sliding pile's retaining performan...Pre-stressed rope reinforced anti-sliding pile is a composite anti-sliding structure. It is made up of pre-stressed rope and general anti-sliding pile. It can bring traditional anti-sliding pile's retaining performance into full play, and to treat with landslide fast and economically. The difference between them is that the pre-stressed rope will transfix the whole anti- sliding pile through a prearranged pipe in this structure. The working mechanics, the design method and economic benefit are studied. The results show that the pre-stressed rope reinforced anti-sliding pile can treat with the small and middle landslides or high slopes well and possess the notable advantage of technology and economic.展开更多
Pile foundation is widely used in the offshore engineering. The pile can be seriously destroyed by the soil liquefaction during strong earthquakes. The potentials of liquefaction and damages of pile foundation due to ...Pile foundation is widely used in the offshore engineering. The pile can be seriously destroyed by the soil liquefaction during strong earthquakes. The potentials of liquefaction and damages of pile foundation due to the liquefaction can be reduced by the implementation of the drainage in the liquefiable foundation. A patented pile technology, named rigidity-drain pile, was introduced. The partial section of the pile body was filled by materials with higher penetrability which forms some effective drainage channels in the pile. The principles and construction methods were presented. 3D models for both rigidity-drain pile and ordinary pile were built in FLAC3D code. The dynamic loadings were applied on the bottom of the model. According to the numerical results, in the case of the rigidity-drain pile, the water in the relevant distance range around the pile flows toward the pile drainage, the contour of the pore pressure shows a funnel form. Contrast to the ordinary pile, the rigidity-drain pile can dissipate the accumulated excess pore water, maintain effective stress and obviously reduce the possibility of surrounding soil liquefaction.展开更多
Anti-slide pile is one of the important methods to administer landslide geological disaster because of its advantages.It plays important role in administering landslide.It is a premise of reasonable economy and techno...Anti-slide pile is one of the important methods to administer landslide geological disaster because of its advantages.It plays important role in administering landslide.It is a premise of reasonable economy and technological advance to know the distribution rule and feature of the force between anti-sliding pile and surrounding rock.To determine the sliding force and remnant resistant sliding force,according to need of study,this paper sets up the geological model and mechanics model in term of a typical landslide,and analyzes the effect rule of sliding body distortion,strength and gravity to the pushing force and remnant resistant sliding force by use of the numerical model.The distribution rule of pushing force and remnant resistant sliding force of the type of landslide is given.展开更多
The problem of interval correlation results in interval extension is discussed by the relationship of interval-valued functions and real-valued functions. The methods of reducing interval extension are given. Based on...The problem of interval correlation results in interval extension is discussed by the relationship of interval-valued functions and real-valued functions. The methods of reducing interval extension are given. Based on the ideas of the paper, the formulas of sub-interval perturbed finite element method based on the elements are given. The sub-interval amount is discussed and the approximate computation formula is given. At the same time, the computational precision is discussed and some measures of improving computational efficiency are given. Finally, based on sub-interval perturbed finite element method and anti-slide stability analysis method, the formula for computing the bounds of stability factor is given. It provides a basis for estimating and evaluating reasonably anti-slide stability of structures.展开更多
The anti-slide support structure is widely used in the anti-seismic reinforcement of bridge foundations,but related experimental research was processing slowly. Based on the prototype of the Jiuzhaigou bridge at the C...The anti-slide support structure is widely used in the anti-seismic reinforcement of bridge foundations,but related experimental research was processing slowly. Based on the prototype of the Jiuzhaigou bridge at the Chengdu-Lanzhou Railway,a 3-D simulation model was established on the basis of the shaking table model test,and the rationality of the dynamic analysis model was verified by indicators such as the bending moment of the bridge piles,peak soil pressure,and PGA amplification factors. The results show that the inertia force of the bridge pier has an important influence on the deformation of the pile foundation. The bending moment and shearing force are larger in lateral bridge piles,and the maximum value is near the pile top. The PGA amplification factor is stronger in the back of the rear anti-slide piles and so is it in front of the bridge pier,and the soil is prone to slip and damage. The bedrock is rigid and the dynamic response is maintained at a low level. The anti-slide piles in the rear row play a major role in the anti-seismic reinforcement design,and the anti-slide piles in the front row can be used as an auxiliary support structure.展开更多
文摘The model test result of earth force in the side of anti-slide pile of anchor bars was introduced.There are three groups of the tests.The loads were on the back side of the slope in two groups.The other one was loaded just behind the pile by the jack.In order to get the force of the soil,some earth-pressure boxes were used to get the earth pressure on the side of the piles.The part of the max pressure and the earth pressure was mainly focused under the slip line
基金sponsored by the National Natural Science Foundation of China(51578467)
文摘Based on the requirement of seismic reinforcement of bridge foundation on slope in the Chengdu-Lanzhou railway project,a shaking table model test of anti-slide pile protecting bridge foundation in landslide section is designed and completed. By applying Wenchuan seismic waves with different acceleration peaks,the stress and deformation characteristics of bridge pile foundation and anti-slide pile are analyzed,and the failure mode is discussed. Results show that the dynamic response of bridge pile and anti-slide pile are affected by the peak value of seismic acceleration of earthquake,with which the stress and deformation of the structure increase. The maximum dynamic earth pressure and the moment of anti-slide piles are located near the sliding surface,while that of bridge piles are located at the top of the pile. Based on the dynamic response of structure,local reinforcement needs to be carried out to meet the requirement of the seismic design. The PGA amplification factor of the surface is greater than the inside,and it decreases with the increase of the input seismic acceleration peak. When the slope failure occurs,the tension cracks are mainly produced in the shallow sliding zone and the coarse particles at the foot of the slope are accumulated.
基金financially supported by the National Key R&D Program of China(No.2018YFC1508601)the Fundamental Research Funds for the Central University(20822041B4038)
文摘Large-scale shaking table tests were conducted to study the dynamic response of a slope reinforced by double-row anti-sliding piles and prestressed anchor cables. The test results show that the reinforcement suppressed the acceleration amplification effectively. The axial force time histories are decomposed into a baseline part and a vibration part in this study. The baseline part of axial force well revealed the seismic slope stability, the peak vibration values of axial force of the anchor cables changed significantly in different area of the slope under seismic excitations. The peak lateral earth pressure acting on the back of the anti-sliding pile located at the slope toe was much larger than that acting on the back of the anti-sliding pile located at the slope waist. The test results indicate an obvious load sharing ratio difference between these two anti-slide piles, the load sharing ratio between the two anti-sliding piles located at the slope toe and the slope waist varied mainly in a range of 2-5. The anti-slide pile at the slope waist suppressed the horizontal displacement of the slope surface.
文摘Pre-stressed rope reinforced anti-sliding pile is a composite anti-sliding structure. It is made up of pre-stressed rope and general anti-sliding pile. It can bring traditional anti-sliding pile's retaining performance into full play, and to treat with landslide fast and economically. The difference between them is that the pre-stressed rope will transfix the whole anti- sliding pile through a prearranged pipe in this structure. The working mechanics, the design method and economic benefit are studied. The results show that the pre-stressed rope reinforced anti-sliding pile can treat with the small and middle landslides or high slopes well and possess the notable advantage of technology and economic.
基金Project (50639010) supported by the National Natural Science Foundation of China
文摘Pile foundation is widely used in the offshore engineering. The pile can be seriously destroyed by the soil liquefaction during strong earthquakes. The potentials of liquefaction and damages of pile foundation due to the liquefaction can be reduced by the implementation of the drainage in the liquefiable foundation. A patented pile technology, named rigidity-drain pile, was introduced. The partial section of the pile body was filled by materials with higher penetrability which forms some effective drainage channels in the pile. The principles and construction methods were presented. 3D models for both rigidity-drain pile and ordinary pile were built in FLAC3D code. The dynamic loadings were applied on the bottom of the model. According to the numerical results, in the case of the rigidity-drain pile, the water in the relevant distance range around the pile flows toward the pile drainage, the contour of the pore pressure shows a funnel form. Contrast to the ordinary pile, the rigidity-drain pile can dissipate the accumulated excess pore water, maintain effective stress and obviously reduce the possibility of surrounding soil liquefaction.
文摘Anti-slide pile is one of the important methods to administer landslide geological disaster because of its advantages.It plays important role in administering landslide.It is a premise of reasonable economy and technological advance to know the distribution rule and feature of the force between anti-sliding pile and surrounding rock.To determine the sliding force and remnant resistant sliding force,according to need of study,this paper sets up the geological model and mechanics model in term of a typical landslide,and analyzes the effect rule of sliding body distortion,strength and gravity to the pushing force and remnant resistant sliding force by use of the numerical model.The distribution rule of pushing force and remnant resistant sliding force of the type of landslide is given.
文摘The problem of interval correlation results in interval extension is discussed by the relationship of interval-valued functions and real-valued functions. The methods of reducing interval extension are given. Based on the ideas of the paper, the formulas of sub-interval perturbed finite element method based on the elements are given. The sub-interval amount is discussed and the approximate computation formula is given. At the same time, the computational precision is discussed and some measures of improving computational efficiency are given. Finally, based on sub-interval perturbed finite element method and anti-slide stability analysis method, the formula for computing the bounds of stability factor is given. It provides a basis for estimating and evaluating reasonably anti-slide stability of structures.
基金the Railways Research andDevelopment Project of the Ministry of Railways of the Peoples Republic of China(Grant No.Z2012-061)
文摘The anti-slide support structure is widely used in the anti-seismic reinforcement of bridge foundations,but related experimental research was processing slowly. Based on the prototype of the Jiuzhaigou bridge at the Chengdu-Lanzhou Railway,a 3-D simulation model was established on the basis of the shaking table model test,and the rationality of the dynamic analysis model was verified by indicators such as the bending moment of the bridge piles,peak soil pressure,and PGA amplification factors. The results show that the inertia force of the bridge pier has an important influence on the deformation of the pile foundation. The bending moment and shearing force are larger in lateral bridge piles,and the maximum value is near the pile top. The PGA amplification factor is stronger in the back of the rear anti-slide piles and so is it in front of the bridge pier,and the soil is prone to slip and damage. The bedrock is rigid and the dynamic response is maintained at a low level. The anti-slide piles in the rear row play a major role in the anti-seismic reinforcement design,and the anti-slide piles in the front row can be used as an auxiliary support structure.