期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
THE MECHANICAL MODEL OF THE FOREPOLING BOLT STRUCTURE FOR STUDYING THE PRE-SUPPORT MECHANISM
1
作者 陶龙光 侯公羽 乔河 《Journal of China University of Mining and Technology》 1995年第2期42-52,共11页
Based on references [1~3]. the mechanical models have been developed to study the presupport mechanism of forepoling bolt structure in this paper. The following problems are discussed:(1) the pre-support mechanism of ... Based on references [1~3]. the mechanical models have been developed to study the presupport mechanism of forepoling bolt structure in this paper. The following problems are discussed:(1) the pre-support mechanism of forepoling bolt structure and stress distribution on its upper broken rock; (2) loading state of forepoling bolt; (3 ) solution of arching in the cross section of excavation. 展开更多
关键词 forepoling bolt PRE-SUPPORT mechanical model arching mechanism
下载PDF
“新汇改”后的人民币汇率与股市关系 被引量:1
2
作者 陈璐璐 邓留保 《嘉兴学院学报》 2017年第2期103-112,共10页
研究我国"新汇改"后人民币汇率与股市的关系及其传导机制,有助于防范金融风险的跨市场转移。文章利用ARCH(1,1)模型验证了人民币汇率与上证指数间的负相关关系,证明了二者之间存在长期的均衡关系,且人民币汇率是上证指数变动... 研究我国"新汇改"后人民币汇率与股市的关系及其传导机制,有助于防范金融风险的跨市场转移。文章利用ARCH(1,1)模型验证了人民币汇率与上证指数间的负相关关系,证明了二者之间存在长期的均衡关系,且人民币汇率是上证指数变动的单向格兰杰原因;利用脉冲检验和方差分析验证了人民币汇率对上证指数的影响大于上证指数对人民币汇率的影响,并从微观主体行为和宏观经济环境两个角度分析了人民币汇率与股市之间的传导机制。建议进一步完善外汇市场管理机制,聚焦股票价格形成机制,防范金融风险的跨市场转移。 展开更多
关键词 新汇改 人民币汇率 上证指数 arch模型 传导机制
下载PDF
Control of floor heaves with steel pile in gob-side entry retaining 被引量:2
3
作者 Xu Ying Chen Jin Bai Jianbiao 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第3期527-534,共8页
A new approach named as steel pile method is innovatively proposed in this study to control severe floor heaves in gob-side entry retaining. It is required that the steel piles be installed in the floor corners with a... A new approach named as steel pile method is innovatively proposed in this study to control severe floor heaves in gob-side entry retaining. It is required that the steel piles be installed in the floor corners with a certain interval before the influence of the dynamic pressure induced by current panel extraction. Using numerical simulation and theoretical analysis, this study investigated the interaction between the steel piles and the floor rocks during the service life of the steel piles, and revealed the mechanism of the steel piles in controlling floor heaves. The effect of the steel pile parameters on the control of floor heaves was presented and elaborated. It is found that the effectiveness of the steel piles in controlling floor heaves can be enhanced with greater installed dip angle, longer length and smaller interval of the steel piles.Compared with traditional methods, e.g., using floor anchor bolts and floor restoration, the advantages using steel pile were successfully defined in terms of controlling effect and economic benefits. It is hoped that the proposed method can contribute to the development of gob-side entry retaining technique. 展开更多
关键词 Gob-side entry retaining Floor heave Steel pile Stress arch Control mechanism
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部