Cost reduction in electric power generation is a major management concern, and it is therefore necessary to reduce maintenance expenses while upholding plant reliability. A maintenance optimization system 'FREEDOM...Cost reduction in electric power generation is a major management concern, and it is therefore necessary to reduce maintenance expenses while upholding plant reliability. A maintenance optimization system 'FREEDOM', which uses RBM technique, DCF (discounted cash flow) and NPV (net present value) calculation functions, has been newly developed. This system probabilistically evaluates the lifetime of boiler and turbine and quantitatively calculates the risk defined as the cumulative probability of failure multiplied by the consequence of failure. Economically optimized timing of inspection and alternative countermeasure such as repair and replacement are then recommended. This system has already been applied to seven plants in Japan, and its effectiveness has been confirmed.展开更多
The concept of performance-based design, which mainly focuses on mechanical performance, has become the international standard, as in the case for ISO. The standardization of tunnel design has not been achieved becaus...The concept of performance-based design, which mainly focuses on mechanical performance, has become the international standard, as in the case for ISO. The standardization of tunnel design has not been achieved because it requires integration of separate specialized fields, such as geotechnical engineering, structural engineering and concrete engineering. It is also required to clarify performance-based criteria for tunnel structures to suit specific use purposes (objectives), establish the concept of survey, planning, design, construction and maintenance based on such criteria, and develop proper management systems for operation and maintenance to suit specific tunnel use purposes. To this end, it is vital to develop a methodology for evaluating and verifying the performance of existing tunnels. This paper presents a new concept of performance requirements for tunnel structures and describes the method of quantitatively evaluating the total performance of existing tunnels in relation to the required performance, assuming the total performance to be based on the Analysis Hierarchy Process.展开更多
文摘Cost reduction in electric power generation is a major management concern, and it is therefore necessary to reduce maintenance expenses while upholding plant reliability. A maintenance optimization system 'FREEDOM', which uses RBM technique, DCF (discounted cash flow) and NPV (net present value) calculation functions, has been newly developed. This system probabilistically evaluates the lifetime of boiler and turbine and quantitatively calculates the risk defined as the cumulative probability of failure multiplied by the consequence of failure. Economically optimized timing of inspection and alternative countermeasure such as repair and replacement are then recommended. This system has already been applied to seven plants in Japan, and its effectiveness has been confirmed.
文摘The concept of performance-based design, which mainly focuses on mechanical performance, has become the international standard, as in the case for ISO. The standardization of tunnel design has not been achieved because it requires integration of separate specialized fields, such as geotechnical engineering, structural engineering and concrete engineering. It is also required to clarify performance-based criteria for tunnel structures to suit specific use purposes (objectives), establish the concept of survey, planning, design, construction and maintenance based on such criteria, and develop proper management systems for operation and maintenance to suit specific tunnel use purposes. To this end, it is vital to develop a methodology for evaluating and verifying the performance of existing tunnels. This paper presents a new concept of performance requirements for tunnel structures and describes the method of quantitatively evaluating the total performance of existing tunnels in relation to the required performance, assuming the total performance to be based on the Analysis Hierarchy Process.