Isolated operation of hydropower stations on Wujinag River was seen disadvantages of low rate of water utilization and much loss of electricity caused by abandoned water during low load periods. To tackle the problem,...Isolated operation of hydropower stations on Wujinag River was seen disadvantages of low rate of water utilization and much loss of electricity caused by abandoned water during low load periods. To tackle the problem, centralized control over cascade hydropower stations is practiced with a considerable economic benef it gained.展开更多
This study presents a centralized control scheme that coordinates parallel operations of power conditioning system(PCS)for the grid interactions of electric vehicles(EVs)in EV charge-discharge and storage integration ...This study presents a centralized control scheme that coordinates parallel operations of power conditioning system(PCS)for the grid interactions of electric vehicles(EVs)in EV charge-discharge and storage integration station.Key issues for the control and operation of PCS under various operation modes are discussed,including vehicle to grid(V2G)mode,stand-alone mode and seamless transfer mode.The intelligent multi-mode charge-discharge method is utilized for the V2G mode,and the parallel control method based on communication network is adopted for the standalone mode.In addition,a novel seamless transfer strategy is proposed,which is able to implement PCS transition between V2G mode and stand-alone mode.The detailed process of the seamless transfer between the two modes is illustrated.Experimental results are presented to show the performance and feasibility of this strategy.展开更多
文摘Isolated operation of hydropower stations on Wujinag River was seen disadvantages of low rate of water utilization and much loss of electricity caused by abandoned water during low load periods. To tackle the problem, centralized control over cascade hydropower stations is practiced with a considerable economic benef it gained.
基金This work was supported in part by the National Natural science Foundation of China under Grant 51361130150 and Grant 51477067in part by the Fundamental Research Funds for the Central Universities under Grant 2014QN219.
文摘This study presents a centralized control scheme that coordinates parallel operations of power conditioning system(PCS)for the grid interactions of electric vehicles(EVs)in EV charge-discharge and storage integration station.Key issues for the control and operation of PCS under various operation modes are discussed,including vehicle to grid(V2G)mode,stand-alone mode and seamless transfer mode.The intelligent multi-mode charge-discharge method is utilized for the V2G mode,and the parallel control method based on communication network is adopted for the standalone mode.In addition,a novel seamless transfer strategy is proposed,which is able to implement PCS transition between V2G mode and stand-alone mode.The detailed process of the seamless transfer between the two modes is illustrated.Experimental results are presented to show the performance and feasibility of this strategy.