The installation of wind power generators on buildings located in areas with regular winds may be a suitable investment in a renewable power source. Brazil has a high eolic potential, where the annual mean wind speed ...The installation of wind power generators on buildings located in areas with regular winds may be a suitable investment in a renewable power source. Brazil has a high eolic potential, where the annual mean wind speed may reach over eight meters per second. This case study is aimed to assess the economic feasibility of the installation of small wind power plants in urban areas. This work evaluates a project for the installation of a vertical axis wind turbine in three buildings (15-, 22-, and 26-story) including the following stages: (1) installation of a real-time power meter in the 15-store unit; (2) demand analysis of the 26-store building's power consumption; (3) winds survey along the coast of the State of Ceara; (4) analysis of the wind turbines available in the market; (5) simulation aimed to choose the system. Vertical wind power generators offer better conditions of use in urban areas. The turnover time was established to be between four and six years in the three studied units. The installation of a wind power generator on buildings in regions with an adequate eolic regimen reaches a financial return of the investment before the end of the equipment's lifespan.展开更多
Worldwide the introduction of dispersed generators (DG) in the distribution network is assuming a significant importance. There is an increasing relevance of the energy process efficiency improvement; as for electri...Worldwide the introduction of dispersed generators (DG) in the distribution network is assuming a significant importance. There is an increasing relevance of the energy process efficiency improvement; as for electric power systems, the most interesting perspective concerns the capability of the system to increase the exploitation of the renewable resources. The integration of DGs in the electric distribution network requires a revision of this infrastructure, so far designed and developed assuming that power flows in one direction: from the high voltage transmission network to the medium voltage distribution, to reach final customers on the low voltage network. The attention to an efficient operation of distribution networks is increasing all over the world; this interest is becoming higher and higher also in Italy, where the high energy prices push in the direction of fostering efficiency as much as possible. This work describes a study developed in the AlpEnergy project framework: an International Cooperation Program aimed at introducing an efficient operational model for the distributed production and consumption. In particular it is proposed a new model for the integration and the management of the DG in the distribution network. The new model (defined VPS: Virtual Power System) is based on a communication channel between the active users (generators), the loads and, eventually, the Distribution System Operators (DSOs).展开更多
在新型电力系统中,亟待深度挖掘需求侧资源以提升系统灵活性和新能源消纳能力。在“新基建”背景下,5G基站作为一种新型需求侧资源正迅速发展。研究如何在保证基站备用需求的前提下,由铁塔公司组建含大规模5G基站的虚拟电厂(virtual pow...在新型电力系统中,亟待深度挖掘需求侧资源以提升系统灵活性和新能源消纳能力。在“新基建”背景下,5G基站作为一种新型需求侧资源正迅速发展。研究如何在保证基站备用需求的前提下,由铁塔公司组建含大规模5G基站的虚拟电厂(virtual power plant,VPP)并常态化参与需求响应。首先,提出了考虑储能动态备用容量的5G基站运行可行域构建方法,建立了5G基站VPP的聚合模型。然后,建立了5G基站VPP响应负荷准线的日前优化模型,提出了适合对大规模5G基站进行协调控制的日内解聚合方法。最后,建立了含高比例新能源的区域电网仿真算例。仿真结果表明,聚合大规模基站参与准线型需求响应,可以显著降低5G基站的运行成本,同时提高电网的新能源消纳能力。展开更多
虚拟电厂(virtual power plant,VPP)可聚合多利益主体的分布式资源(distributed energy resources,DER)参与电力市场,以深入挖掘分布式能源的调度潜力,如何考虑各运行主体的协同调度,提高整体收益成为当前亟需解决的重要问题。基于此,...虚拟电厂(virtual power plant,VPP)可聚合多利益主体的分布式资源(distributed energy resources,DER)参与电力市场,以深入挖掘分布式能源的调度潜力,如何考虑各运行主体的协同调度,提高整体收益成为当前亟需解决的重要问题。基于此,提出了计及风光及市场电价不确定风险和多主体协同的虚拟电厂参与主辅市场联合优化策略。首先,建立电动汽车群体(electric vehicle duster,EVC)的可调度域评估模型,在此基础上考虑VPP与EVC两主体的利益均衡,提出VPP与EVC主从博弈的主能量市场日前竞标模型;其次,考虑电池储能系统(battery energy storage system,BESS)快速充放电的特性,进一步提出VPP参与主能量市场和辅助调频市场的日前联合投标模型和VPP实时调整及调频响应模型;最后,在日前联合投标模型中引入条件风险价值(condition value at risk,CVaR),衡量日前投标收益与不确定风险的关系。基于某省电力市场规则进行算例仿真表明,所提VPP优化策略能通过提供调频服务和鼓励EV响应调度提高VPP的综合收益。展开更多
针对现代火电厂能耗较高的问题,介绍1种基于全局敏感性分析的火电厂能耗诊断方法。该方法主要由2个部分构成,一部分为基于GWO (Grey Wolf Optimizer,灰狼优化算法)的火电厂能耗诊断模型,另一部分为基于全局敏感性分析的火电厂能耗计算方...针对现代火电厂能耗较高的问题,介绍1种基于全局敏感性分析的火电厂能耗诊断方法。该方法主要由2个部分构成,一部分为基于GWO (Grey Wolf Optimizer,灰狼优化算法)的火电厂能耗诊断模型,另一部分为基于全局敏感性分析的火电厂能耗计算方法,在2个模块共同作用下,准确计算出火电厂能耗水平,以此为火电厂节能优化提供支持,具有一定的应用价值。展开更多
文摘The installation of wind power generators on buildings located in areas with regular winds may be a suitable investment in a renewable power source. Brazil has a high eolic potential, where the annual mean wind speed may reach over eight meters per second. This case study is aimed to assess the economic feasibility of the installation of small wind power plants in urban areas. This work evaluates a project for the installation of a vertical axis wind turbine in three buildings (15-, 22-, and 26-story) including the following stages: (1) installation of a real-time power meter in the 15-store unit; (2) demand analysis of the 26-store building's power consumption; (3) winds survey along the coast of the State of Ceara; (4) analysis of the wind turbines available in the market; (5) simulation aimed to choose the system. Vertical wind power generators offer better conditions of use in urban areas. The turnover time was established to be between four and six years in the three studied units. The installation of a wind power generator on buildings in regions with an adequate eolic regimen reaches a financial return of the investment before the end of the equipment's lifespan.
文摘Worldwide the introduction of dispersed generators (DG) in the distribution network is assuming a significant importance. There is an increasing relevance of the energy process efficiency improvement; as for electric power systems, the most interesting perspective concerns the capability of the system to increase the exploitation of the renewable resources. The integration of DGs in the electric distribution network requires a revision of this infrastructure, so far designed and developed assuming that power flows in one direction: from the high voltage transmission network to the medium voltage distribution, to reach final customers on the low voltage network. The attention to an efficient operation of distribution networks is increasing all over the world; this interest is becoming higher and higher also in Italy, where the high energy prices push in the direction of fostering efficiency as much as possible. This work describes a study developed in the AlpEnergy project framework: an International Cooperation Program aimed at introducing an efficient operational model for the distributed production and consumption. In particular it is proposed a new model for the integration and the management of the DG in the distribution network. The new model (defined VPS: Virtual Power System) is based on a communication channel between the active users (generators), the loads and, eventually, the Distribution System Operators (DSOs).
文摘在新型电力系统中,亟待深度挖掘需求侧资源以提升系统灵活性和新能源消纳能力。在“新基建”背景下,5G基站作为一种新型需求侧资源正迅速发展。研究如何在保证基站备用需求的前提下,由铁塔公司组建含大规模5G基站的虚拟电厂(virtual power plant,VPP)并常态化参与需求响应。首先,提出了考虑储能动态备用容量的5G基站运行可行域构建方法,建立了5G基站VPP的聚合模型。然后,建立了5G基站VPP响应负荷准线的日前优化模型,提出了适合对大规模5G基站进行协调控制的日内解聚合方法。最后,建立了含高比例新能源的区域电网仿真算例。仿真结果表明,聚合大规模基站参与准线型需求响应,可以显著降低5G基站的运行成本,同时提高电网的新能源消纳能力。
文摘虚拟电厂(virtual power plant,VPP)可聚合多利益主体的分布式资源(distributed energy resources,DER)参与电力市场,以深入挖掘分布式能源的调度潜力,如何考虑各运行主体的协同调度,提高整体收益成为当前亟需解决的重要问题。基于此,提出了计及风光及市场电价不确定风险和多主体协同的虚拟电厂参与主辅市场联合优化策略。首先,建立电动汽车群体(electric vehicle duster,EVC)的可调度域评估模型,在此基础上考虑VPP与EVC两主体的利益均衡,提出VPP与EVC主从博弈的主能量市场日前竞标模型;其次,考虑电池储能系统(battery energy storage system,BESS)快速充放电的特性,进一步提出VPP参与主能量市场和辅助调频市场的日前联合投标模型和VPP实时调整及调频响应模型;最后,在日前联合投标模型中引入条件风险价值(condition value at risk,CVaR),衡量日前投标收益与不确定风险的关系。基于某省电力市场规则进行算例仿真表明,所提VPP优化策略能通过提供调频服务和鼓励EV响应调度提高VPP的综合收益。
文摘针对现代火电厂能耗较高的问题,介绍1种基于全局敏感性分析的火电厂能耗诊断方法。该方法主要由2个部分构成,一部分为基于GWO (Grey Wolf Optimizer,灰狼优化算法)的火电厂能耗诊断模型,另一部分为基于全局敏感性分析的火电厂能耗计算方法,在2个模块共同作用下,准确计算出火电厂能耗水平,以此为火电厂节能优化提供支持,具有一定的应用价值。