Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its co...Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitablemechanicalmodel was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole is in a stable state.展开更多
In the process of designing a municipal rainwater and sewage pumping station,it is necessary to accurately grasp the design points,reasonably determine the scale of the rainwater and sewage pumping station,scientifica...In the process of designing a municipal rainwater and sewage pumping station,it is necessary to accurately grasp the design points,reasonably determine the scale of the rainwater and sewage pumping station,scientifically select the location and layout,and select materials reasonably.After completing the process design of the municipal rainwater and sewage pumping station and putting it into operation,in order to ensure the normal and stable operation of the pumping station,it is necessary to focus on strengthening the operation and management of diving equipment,cleaning equipment,and electromechanical equipment.The author analyzes the key points and specific design path of the process design of municipal rainwater and sewage pumping stations,and puts forward effective strategies for operation management,hoping to contribute to the scientific design and stable operation of municipal rainwater and sewage pumping stations.展开更多
Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjus...Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjustable blade, mathematical models of pumping station optimal operation are established and solved with genetic algorithm. For different total pumping discharge and total pumping volume of water per day, in order to minimize pumping station operation cost, the number and operation duties of running pump units are respectively determined at different periods of time in a day. The results indicate that the saving of electrical cost is significantly effected by the schemes of adjusting blade angles and time-varying electrical price when pumping certain water volume of water per day, and compared with conventional operation schemes (namely, the schemes of pumping station operation at design blade angles based on certain pumping discharge), the electrical cost is saved by 4.73%-31.27%. Also, compared with the electrical cost of conventional operation schemes, the electrical cost is saved by 2.03%-5.79% by the schemes of adjusting blade angles when pumping certain discharge.展开更多
Automatic Control of pumps is an interesting proposal to operate water pumping stations among many kinds of water pumping stations according to their functions.In this paper,our pumping station is being used for water...Automatic Control of pumps is an interesting proposal to operate water pumping stations among many kinds of water pumping stations according to their functions.In this paper,our pumping station is being used for water supply system. This paper is to introduce the idea of pump controller and the important factors that must be considering when we want to design automatic control system of water pumping stations. Then the automatic control circuit with the function of all components will be introduced.展开更多
Sediment deposition in the pumping station has a huge negative impact on unit operation.The three-dimensional CFD method has been used to simulate inlet structure flow in pumping station based on the Eulerian solid- l...Sediment deposition in the pumping station has a huge negative impact on unit operation.The three-dimensional CFD method has been used to simulate inlet structure flow in pumping station based on the Eulerian solid- liquid two-phase flow model. The numerical results of the preliminary scheme show that sediment deposition occurs in the forebay of pumping station because of poor flow pattern therein. In order to improve hydraulic configuration in the forebay,one modified measure reconstructs water diversion weir shape,and another measure sets a water retaining sill in the approach channel. The simulation results of the modified scheme prove that back flow in the forebay has been eliminated and the sediment deposition region has also been reduced.展开更多
The design of the pumping stations and the gas injection systems for the inner Chamber and the cryostat on HT-7U superconducting tokamak is described in this paper.
By means of the analysis of the internal flow within inlet passage of large pumping sta-tion, an analysis of 3-D direct boundary element for the flow has been presented on the potentialflow assumption, and a calculati...By means of the analysis of the internal flow within inlet passage of large pumping sta-tion, an analysis of 3-D direct boundary element for the flow has been presented on the potentialflow assumption, and a calculation and an experimental proof for the inlet passage of 30 angle-type axial pumping station have been made. Based on the analysis of the calculations and theexperiments, the calculation method is feasible and believable.展开更多
基金funded by the BeijingNatural Science Foundation of China(8222003)National Natural Science Foundation of China(41807180).
文摘Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitablemechanicalmodel was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole is in a stable state.
文摘In the process of designing a municipal rainwater and sewage pumping station,it is necessary to accurately grasp the design points,reasonably determine the scale of the rainwater and sewage pumping station,scientifically select the location and layout,and select materials reasonably.After completing the process design of the municipal rainwater and sewage pumping station and putting it into operation,in order to ensure the normal and stable operation of the pumping station,it is necessary to focus on strengthening the operation and management of diving equipment,cleaning equipment,and electromechanical equipment.The author analyzes the key points and specific design path of the process design of municipal rainwater and sewage pumping stations,and puts forward effective strategies for operation management,hoping to contribute to the scientific design and stable operation of municipal rainwater and sewage pumping stations.
基金supported by Author Special Foundation of National Excellent Doctoral Dissertation of China (Grant No. 2007B41)Jiangsu Provincial Foundation of "333 Talents Engineering" of ChinaJiangsu Provincial Academic Header Foundation of Qinglan Engineering of China
文摘Baoying pumping station is a part of source pumping stations in East Route Project of South-to-North Water Transfer in China. Aiming at the characteristics of head varying, and making use of the function of pump adjustable blade, mathematical models of pumping station optimal operation are established and solved with genetic algorithm. For different total pumping discharge and total pumping volume of water per day, in order to minimize pumping station operation cost, the number and operation duties of running pump units are respectively determined at different periods of time in a day. The results indicate that the saving of electrical cost is significantly effected by the schemes of adjusting blade angles and time-varying electrical price when pumping certain water volume of water per day, and compared with conventional operation schemes (namely, the schemes of pumping station operation at design blade angles based on certain pumping discharge), the electrical cost is saved by 4.73%-31.27%. Also, compared with the electrical cost of conventional operation schemes, the electrical cost is saved by 2.03%-5.79% by the schemes of adjusting blade angles when pumping certain discharge.
文摘Automatic Control of pumps is an interesting proposal to operate water pumping stations among many kinds of water pumping stations according to their functions.In this paper,our pumping station is being used for water supply system. This paper is to introduce the idea of pump controller and the important factors that must be considering when we want to design automatic control system of water pumping stations. Then the automatic control circuit with the function of all components will be introduced.
基金Chinese National Foundation of Natural Science-Key Projects(51339005)
文摘Sediment deposition in the pumping station has a huge negative impact on unit operation.The three-dimensional CFD method has been used to simulate inlet structure flow in pumping station based on the Eulerian solid- liquid two-phase flow model. The numerical results of the preliminary scheme show that sediment deposition occurs in the forebay of pumping station because of poor flow pattern therein. In order to improve hydraulic configuration in the forebay,one modified measure reconstructs water diversion weir shape,and another measure sets a water retaining sill in the approach channel. The simulation results of the modified scheme prove that back flow in the forebay has been eliminated and the sediment deposition region has also been reduced.
文摘The design of the pumping stations and the gas injection systems for the inner Chamber and the cryostat on HT-7U superconducting tokamak is described in this paper.
文摘By means of the analysis of the internal flow within inlet passage of large pumping sta-tion, an analysis of 3-D direct boundary element for the flow has been presented on the potentialflow assumption, and a calculation and an experimental proof for the inlet passage of 30 angle-type axial pumping station have been made. Based on the analysis of the calculations and theexperiments, the calculation method is feasible and believable.