1∶250 000 contour was used to generate 0. 0012°( 4. 32 s) of grid DEM of the basin,to simulate flow line of slope surface and gradient line,automatically draw valley line,and count catchment area at slope surf...1∶250 000 contour was used to generate 0. 0012°( 4. 32 s) of grid DEM of the basin,to simulate flow line of slope surface and gradient line,automatically draw valley line,and count catchment area at slope surface point. We organized data at the sections with 100 m of interval to simulate water system,establish coding system of river network,and build associated point with slope surface system. " Hillside hydrology" theory simulated subsurface flow between surface water and groundwater,and used catchment water at slope surface point,gradient,valley line and depletion curve to study soil moisture distribution in the basin.展开更多
文摘1∶250 000 contour was used to generate 0. 0012°( 4. 32 s) of grid DEM of the basin,to simulate flow line of slope surface and gradient line,automatically draw valley line,and count catchment area at slope surface point. We organized data at the sections with 100 m of interval to simulate water system,establish coding system of river network,and build associated point with slope surface system. " Hillside hydrology" theory simulated subsurface flow between surface water and groundwater,and used catchment water at slope surface point,gradient,valley line and depletion curve to study soil moisture distribution in the basin.