Chemical batch processes have become significant in chemical manufacturing. In these processes, large numbers of chemical products are produced to satisfy human demands in daily life. Recently, economy globalization h...Chemical batch processes have become significant in chemical manufacturing. In these processes, large numbers of chemical products are produced to satisfy human demands in daily life. Recently, economy globalization has resulted, in growing worldwide competitions in tradi.tional chemical .process industry. In order to keep competitive in the global marketplace, each company must optimize its production management and set up a reactive system for market fluctuation. Scheduling is the core of production management in chemical processes. The goal of this paper is to review the recent developments in this challenging area. Classifications of batch scheduling problems and optimization methods are introduced. A comparison of six typical models is shown in a general benchmark example from the literature. Finally, challenges and applications in future research are discussed.展开更多
This work develops an optimization-based methodology for the design and scheduling of batch water recycle networks. This task requires the identification of network configuration, fresh-water usage, recycle assignment...This work develops an optimization-based methodology for the design and scheduling of batch water recycle networks. This task requires the identification of network configuration, fresh-water usage, recycle assignments from sources to sinks, wastewater discharge, and a scheduling scheme. A new source-tank-sink representation is developed to allow for storage and dispatch tanks. The problem is solved in stages by first eliminating scheduling constraints and determining minimum usage of fresh water and wastewater discharge. An iterative procedure is formulated to minimize the total annual cost of the system by trading off capital versus operating costs. The work overcomes limitations in previous literature work including restricted recycle within the same cycle, lumped balances that may not lead to feasible solutions, and unrealistic objective functions. A case study is solved to illustrate the usefulness of the devised procedure.展开更多
基金Supported by the National Natural Science Foundation of China (20536020, 20876056).
文摘Chemical batch processes have become significant in chemical manufacturing. In these processes, large numbers of chemical products are produced to satisfy human demands in daily life. Recently, economy globalization has resulted, in growing worldwide competitions in tradi.tional chemical .process industry. In order to keep competitive in the global marketplace, each company must optimize its production management and set up a reactive system for market fluctuation. Scheduling is the core of production management in chemical processes. The goal of this paper is to review the recent developments in this challenging area. Classifications of batch scheduling problems and optimization methods are introduced. A comparison of six typical models is shown in a general benchmark example from the literature. Finally, challenges and applications in future research are discussed.
基金the Texas Water Resources Institute (TWRI)the Texas Hazardous Waste Research Center
文摘This work develops an optimization-based methodology for the design and scheduling of batch water recycle networks. This task requires the identification of network configuration, fresh-water usage, recycle assignments from sources to sinks, wastewater discharge, and a scheduling scheme. A new source-tank-sink representation is developed to allow for storage and dispatch tanks. The problem is solved in stages by first eliminating scheduling constraints and determining minimum usage of fresh water and wastewater discharge. An iterative procedure is formulated to minimize the total annual cost of the system by trading off capital versus operating costs. The work overcomes limitations in previous literature work including restricted recycle within the same cycle, lumped balances that may not lead to feasible solutions, and unrealistic objective functions. A case study is solved to illustrate the usefulness of the devised procedure.