期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Optimization Scheme of Large Passenger Flow in Huoying Station,Line 13 of Beijing Subway System 被引量:2
1
作者 Jin Zhou Haochen Wang +3 位作者 Di Sun Siqiang Xu Meng Lv Feifei Yu 《Computers, Materials & Continua》 SCIE EI 2020年第6期1387-1398,共12页
This paper focuses on the distribution of passenger flow in Huoying Station,Line 13 of Beijing subway system.The transformation measures taken by Line 13 since operation are firstly summarized.Then the authors elabora... This paper focuses on the distribution of passenger flow in Huoying Station,Line 13 of Beijing subway system.The transformation measures taken by Line 13 since operation are firstly summarized.Then the authors elaborate the facilities and equipment of this station,especially the node layout and passenger flow field.An optimization scheme is proposed to rapidly distribute the passenger flow in Huoying Station by adjusting the operation time of the escalator in the direction of Xizhimen.The authors adopt Queuing theory and Anylogic simulation software to simulate the original and the optimized schemes of Huoying Station to distribute the passenger flow.The results of the simulation indicate that the optimized scheme could effectively alleviate the traffic congestion in the hall of Huoying Station,and the pedestrian density in other places of the hall is lowered;passengers could move freely in the hall and no new congestion points would form.The rationality of the scheme is thus proved. 展开更多
关键词 Huoying station of beijing subway system passenger flow ESCALATOR queuing theory system simulation ANYLOGIC
下载PDF
Effects of the Beijing Subway Accident on Engineering Monitoring and Auditing
2
作者 LI Xiaofeng 《China Standardization》 2007年第5期2-5,共4页
On March 28, 2007, six people were buried by a cave-in at Suzhoujie Station on Line 10 of the Beijing Subway. The fatalities were caused when the unit in charge of construction foiled to implement a timely e-vacuation... On March 28, 2007, six people were buried by a cave-in at Suzhoujie Station on Line 10 of the Beijing Subway. The fatalities were caused when the unit in charge of construction foiled to implement a timely e-vacuation after a construction accident took place. (See Beijing Youth, April 1, 2007) . 展开更多
关键词 Effects of the beijing subway Accident on Engineering Monitoring and Auditing
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部