Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialis...Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialists. Therefore, the fuzzy mathematics principle was applied and a synthetic evaluation model was established to provide an effective method for the development of quantitative bidding decision in this paper.展开更多
Bidding has long been used as a method for allocating and procuring goods and services. An acurrate and comprehensive evaluation of bidders is the key to make the bidding a successful one for tenderee. However, evalua...Bidding has long been used as a method for allocating and procuring goods and services. An acurrate and comprehensive evaluation of bidders is the key to make the bidding a successful one for tenderee. However, evaluation of bidders is a tough work and the result of evaluation is always affected by the evaluator's understanding of the standards set for evaluation, and the evaluator's expertise, experience and preferrence. We make an effort to find a method for selecting bidders as accurately as possible. A grey decision model is presented, and an example is illustrated to make the practioners know how to use the model.展开更多
In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and e...In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control.展开更多
This paper mainly talks about the main layer analytical method, and fuzzy comprehensive evaluation, fuzzy hierarchical analysis (AHP) method of a deeper connotation, and further discusses its application in bidding qu...This paper mainly talks about the main layer analytical method, and fuzzy comprehensive evaluation, fuzzy hierarchical analysis (AHP) method of a deeper connotation, and further discusses its application in bidding quotation for petroleum geophysical prospecting project. Fuzzy analytic hierarchy process (FAHP) integrates many merits of AHP and fuzzy comprehensive evaluation organically. It determines the weight of each affecting factor using analytic hierarchy process at first, and then uses the fuzzy comprehensive evaluation method to determine each scheme index. FAHP can effectively enhance the decision-making efficiency.展开更多
Unbalanced bidding is a cash flow management strategy that is recognized as an illegal/disqualifying practice by public owners;and unethical practice by most private owners. This practice provides the awarded bidder w...Unbalanced bidding is a cash flow management strategy that is recognized as an illegal/disqualifying practice by public owners;and unethical practice by most private owners. This practice provides the awarded bidder with unjustified advantages at the expense of the owner. Unfortunately, limited tools and techniques are currently available to identify and detect unbalanced bids during the evaluation process. This paper presents an innovative detection tool to identify unbalanced bids in unit price contracts during the bid evaluation process. The proposed technique develops BMDI graphs to visualize total markup variation patterns during the project lifetime to detect unbalanced bids. The proposed method also uses Monte Carlo simulation to take in consideration the impact of cost uncertainties and risks. An illustrative example was presented to show the capabilities and features of the proposed method in determining the status of submitted bids during the evaluation process.展开更多
Owing to overcoming the characteristics that there are many economic and technical indexes which are fuzzy and incompatibility to each other in evaluating investment project,a new method is proposed.The method is base...Owing to overcoming the characteristics that there are many economic and technical indexes which are fuzzy and incompatibility to each other in evaluating investment project,a new method is proposed.The method is based on the matter-element analysis and combined with the concepts of fuzzy mathematics,which is called the method of fuzzy matter-element analysis.It constructs the compound fuzzy matter element with the investment projects,evaluation factors and their fuzzy value.Through establishing the best subjection degree (fuzzy value),complex fuzzy matter element of relational coefficient and weight aggregation of fuzzy matter-element model,the writer achieves on optimum order of the investment projects according to the calculated relational degree and finds the best project.In this paper,the calculation of weight adopts the analytical hierarchy process method(AHP).Through the actual example,it shows that the model is simple and its calculation is reliable.It is very significant for the engineering evaluated bid and investment decision.展开更多
文摘Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialists. Therefore, the fuzzy mathematics principle was applied and a synthetic evaluation model was established to provide an effective method for the development of quantitative bidding decision in this paper.
基金This paper is sponsored by Doctor Station Foundation of Ministry of Education of China (20010487015).
文摘Bidding has long been used as a method for allocating and procuring goods and services. An acurrate and comprehensive evaluation of bidders is the key to make the bidding a successful one for tenderee. However, evaluation of bidders is a tough work and the result of evaluation is always affected by the evaluator's understanding of the standards set for evaluation, and the evaluator's expertise, experience and preferrence. We make an effort to find a method for selecting bidders as accurately as possible. A grey decision model is presented, and an example is illustrated to make the practioners know how to use the model.
文摘In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control.
文摘This paper mainly talks about the main layer analytical method, and fuzzy comprehensive evaluation, fuzzy hierarchical analysis (AHP) method of a deeper connotation, and further discusses its application in bidding quotation for petroleum geophysical prospecting project. Fuzzy analytic hierarchy process (FAHP) integrates many merits of AHP and fuzzy comprehensive evaluation organically. It determines the weight of each affecting factor using analytic hierarchy process at first, and then uses the fuzzy comprehensive evaluation method to determine each scheme index. FAHP can effectively enhance the decision-making efficiency.
文摘Unbalanced bidding is a cash flow management strategy that is recognized as an illegal/disqualifying practice by public owners;and unethical practice by most private owners. This practice provides the awarded bidder with unjustified advantages at the expense of the owner. Unfortunately, limited tools and techniques are currently available to identify and detect unbalanced bids during the evaluation process. This paper presents an innovative detection tool to identify unbalanced bids in unit price contracts during the bid evaluation process. The proposed technique develops BMDI graphs to visualize total markup variation patterns during the project lifetime to detect unbalanced bids. The proposed method also uses Monte Carlo simulation to take in consideration the impact of cost uncertainties and risks. An illustrative example was presented to show the capabilities and features of the proposed method in determining the status of submitted bids during the evaluation process.
基金Project supported by the National High-Tech Research and Development program of China (863 Program ) (No.2 0 0 2 AA2 Z42 5 1-2 10 0 41) Postdoctoral Scientific Foundation of Northeast Agricultural U niversity. (No. 2 40 0 0 9) and postdoctoral Scien
文摘Owing to overcoming the characteristics that there are many economic and technical indexes which are fuzzy and incompatibility to each other in evaluating investment project,a new method is proposed.The method is based on the matter-element analysis and combined with the concepts of fuzzy mathematics,which is called the method of fuzzy matter-element analysis.It constructs the compound fuzzy matter element with the investment projects,evaluation factors and their fuzzy value.Through establishing the best subjection degree (fuzzy value),complex fuzzy matter element of relational coefficient and weight aggregation of fuzzy matter-element model,the writer achieves on optimum order of the investment projects according to the calculated relational degree and finds the best project.In this paper,the calculation of weight adopts the analytical hierarchy process method(AHP).Through the actual example,it shows that the model is simple and its calculation is reliable.It is very significant for the engineering evaluated bid and investment decision.