A monitoring method that has been designed for the first time for blast furnace wall with copper staves manufactured in China was introduced. Combining the method of "inverse problem" and the concept "non-inverse p...A monitoring method that has been designed for the first time for blast furnace wall with copper staves manufactured in China was introduced. Combining the method of "inverse problem" and the concept "non-inverse problem", the monitoring program for blast furnace wall with copper staves has been realized, which can be used to calculate online the accretion thickness and temperature of hot surface of copper staves after obtaining the values of thermocouples of copper staves. The accretion state obtained in the actual investigation has proved that the result of the program is correct. The monitoring program shows that the accretion would easily fluctuate when the accretion layer is extremely thick or thin, thereby the stable and smooth operation of the blast furnace is hindered. By maintaining appropriate accretion thickness, both long campaigns and high productivity of the blast furnace can be achieved; furthermore, it can also optimize the operation of blast furnace and maximize its production. Approximately 30--50 mm in thickness of accretion layer is maintained on the wall of Shougang blast furnace 2, which can meet the requirement for obtaining both long campaign and high productivity.展开更多
At the beginning of 1990s, Shougang blast furnaces (BFs) No. 2, No. 4, No. 3 and No. 1 were rebuilt se quently for new technological modernization in succession. The campaign life of BFs No. 1, No. 3 and No. 4 reach...At the beginning of 1990s, Shougang blast furnaces (BFs) No. 2, No. 4, No. 3 and No. 1 were rebuilt se quently for new technological modernization in succession. The campaign life of BFs No. 1, No. 3 and No. 4 reaches 16.4, 17.6 and 15.6 years, respectively, and the hot metal output of one campaign reaches 33.8, 35.48 and 26.37 Mt, respectively; the hot metal output of BF effective volume of one campaign reaches 13328, 13991 and 12560 t/m^3, respectively, which reaches the international advanced level of BF high efficiency and long campaign life. In BF desig-ning, several advanced BF long campaign technologies were adopted. BF proper inner profile was optimized, reasona- ble inner profile was adopted, and closed circulating soften water cooling technology was applied in 4 BFs. Double row cooling pipe high efficiency cooling stave was developed which could prolong the service life of bosh, belly and stack. Hot pressed carbon brick and ceramic cup hearth lining structure were applied and optimized. BF operation was improved continuously to ensure stable and smooth operation of BF. Hearth working condition control was strengthened, burden distribution control technology was applied to achieve reasonable distribution of gas flow, and heat load monitoring was strengthened to maintain BF reasonable working inner profile. Proper maintenance at the end of BF campaign was enhanced. Hearth and bottom service life was prolonged by adding titaniferous material and enhancing hearth cooling. Gunning of lining was carried out periodically for the area above tuyere zone.展开更多
基金Item Sponsored by National Natural Science Foundation of China(60472095)
文摘A monitoring method that has been designed for the first time for blast furnace wall with copper staves manufactured in China was introduced. Combining the method of "inverse problem" and the concept "non-inverse problem", the monitoring program for blast furnace wall with copper staves has been realized, which can be used to calculate online the accretion thickness and temperature of hot surface of copper staves after obtaining the values of thermocouples of copper staves. The accretion state obtained in the actual investigation has proved that the result of the program is correct. The monitoring program shows that the accretion would easily fluctuate when the accretion layer is extremely thick or thin, thereby the stable and smooth operation of the blast furnace is hindered. By maintaining appropriate accretion thickness, both long campaigns and high productivity of the blast furnace can be achieved; furthermore, it can also optimize the operation of blast furnace and maximize its production. Approximately 30--50 mm in thickness of accretion layer is maintained on the wall of Shougang blast furnace 2, which can meet the requirement for obtaining both long campaign and high productivity.
文摘At the beginning of 1990s, Shougang blast furnaces (BFs) No. 2, No. 4, No. 3 and No. 1 were rebuilt se quently for new technological modernization in succession. The campaign life of BFs No. 1, No. 3 and No. 4 reaches 16.4, 17.6 and 15.6 years, respectively, and the hot metal output of one campaign reaches 33.8, 35.48 and 26.37 Mt, respectively; the hot metal output of BF effective volume of one campaign reaches 13328, 13991 and 12560 t/m^3, respectively, which reaches the international advanced level of BF high efficiency and long campaign life. In BF desig-ning, several advanced BF long campaign technologies were adopted. BF proper inner profile was optimized, reasona- ble inner profile was adopted, and closed circulating soften water cooling technology was applied in 4 BFs. Double row cooling pipe high efficiency cooling stave was developed which could prolong the service life of bosh, belly and stack. Hot pressed carbon brick and ceramic cup hearth lining structure were applied and optimized. BF operation was improved continuously to ensure stable and smooth operation of BF. Hearth working condition control was strengthened, burden distribution control technology was applied to achieve reasonable distribution of gas flow, and heat load monitoring was strengthened to maintain BF reasonable working inner profile. Proper maintenance at the end of BF campaign was enhanced. Hearth and bottom service life was prolonged by adding titaniferous material and enhancing hearth cooling. Gunning of lining was carried out periodically for the area above tuyere zone.