The safety and longevity of key blast furnace(BF)equipment determine the stable and low-carbon production of iron.This pa-per presents an analysis of the heat transfer characteristics of these components and the uneve...The safety and longevity of key blast furnace(BF)equipment determine the stable and low-carbon production of iron.This pa-per presents an analysis of the heat transfer characteristics of these components and the uneven distribution of cooling water in parallel pipes based on hydrodynamic principles,discusses the feasible methods for the improvement of BF cooling intensity,and reviews the pre-paration process,performance,and damage characteristics of three key equipment pieces:coolers,tuyeres,and hearth refractories.Fur-thermoere,to attain better control of these critical components under high-temperature working conditions,we propose the application of optimized technologies,such as BF operation and maintenance technology,self-repair technology,and full-lifecycle management techno-logy.Finally,we propose further researches on safety assessments and predictions for key BF equipment under new operating conditions.展开更多
One of the problems encountered in 60's to 80's of 20th century in China's steel industry was short life of blast furnace shaft as well as the excessive erosion of blast furnace hearth. A series of research work wa...One of the problems encountered in 60's to 80's of 20th century in China's steel industry was short life of blast furnace shaft as well as the excessive erosion of blast furnace hearth. A series of research work was carried out in order to extend blast furnace campaign life. The concept of research and development was integrated in the construction of BF (blast furnace) No. 5 at WISCO (Wuhan Iron and Steel Corporation), and in October, 1991, the BF No. 5 was blown in. The blast furnace has worked smoothly for more than 15 years without any medium repair even guniting. It is expected that the campaign life of BF No. 5 would be longer than 16 years with a production over 11 000 t per unit inner volume (m^2). A new blast furnace with an inner volume of 3 400 m^3 is under construction, and is designed with a campaign life of 20 years without any medium repair. The campaign life of blast furnaces in China has been extended in recent years.展开更多
A new type regulating valve with the cooling mode of constant temperature difference water supply, temperature difference self operated regulating valve, was introduced into blast furnace cooling system to overcome s...A new type regulating valve with the cooling mode of constant temperature difference water supply, temperature difference self operated regulating valve, was introduced into blast furnace cooling system to overcome shortcomings of the cooling mode of constant flow rate water supply. The results show that the temperature difference between inlet and outlet water of cooling wall can be decreased greatly and steadily, and the water supply for blast furnace cooling can be reduced considerably.展开更多
A monitoring method that has been designed for the first time for blast furnace wall with copper staves manufactured in China was introduced. Combining the method of "inverse problem" and the concept "non-inverse p...A monitoring method that has been designed for the first time for blast furnace wall with copper staves manufactured in China was introduced. Combining the method of "inverse problem" and the concept "non-inverse problem", the monitoring program for blast furnace wall with copper staves has been realized, which can be used to calculate online the accretion thickness and temperature of hot surface of copper staves after obtaining the values of thermocouples of copper staves. The accretion state obtained in the actual investigation has proved that the result of the program is correct. The monitoring program shows that the accretion would easily fluctuate when the accretion layer is extremely thick or thin, thereby the stable and smooth operation of the blast furnace is hindered. By maintaining appropriate accretion thickness, both long campaigns and high productivity of the blast furnace can be achieved; furthermore, it can also optimize the operation of blast furnace and maximize its production. Approximately 30--50 mm in thickness of accretion layer is maintained on the wall of Shougang blast furnace 2, which can meet the requirement for obtaining both long campaign and high productivity.展开更多
At the beginning of 1990s, Shougang blast furnaces (BFs) No. 2, No. 4, No. 3 and No. 1 were rebuilt se quently for new technological modernization in succession. The campaign life of BFs No. 1, No. 3 and No. 4 reach...At the beginning of 1990s, Shougang blast furnaces (BFs) No. 2, No. 4, No. 3 and No. 1 were rebuilt se quently for new technological modernization in succession. The campaign life of BFs No. 1, No. 3 and No. 4 reaches 16.4, 17.6 and 15.6 years, respectively, and the hot metal output of one campaign reaches 33.8, 35.48 and 26.37 Mt, respectively; the hot metal output of BF effective volume of one campaign reaches 13328, 13991 and 12560 t/m^3, respectively, which reaches the international advanced level of BF high efficiency and long campaign life. In BF desig-ning, several advanced BF long campaign technologies were adopted. BF proper inner profile was optimized, reasona- ble inner profile was adopted, and closed circulating soften water cooling technology was applied in 4 BFs. Double row cooling pipe high efficiency cooling stave was developed which could prolong the service life of bosh, belly and stack. Hot pressed carbon brick and ceramic cup hearth lining structure were applied and optimized. BF operation was improved continuously to ensure stable and smooth operation of BF. Hearth working condition control was strengthened, burden distribution control technology was applied to achieve reasonable distribution of gas flow, and heat load monitoring was strengthened to maintain BF reasonable working inner profile. Proper maintenance at the end of BF campaign was enhanced. Hearth and bottom service life was prolonged by adding titaniferous material and enhancing hearth cooling. Gunning of lining was carried out periodically for the area above tuyere zone.展开更多
Top gas recycling oxygen blast furnace(TGR-OBF)process is a promising ironmaking process.The biggest challenge of the TGR-OBF in operation is the dramatic decrease of top gas volume(per ton hot metal),which once l...Top gas recycling oxygen blast furnace(TGR-OBF)process is a promising ironmaking process.The biggest challenge of the TGR-OBF in operation is the dramatic decrease of top gas volume(per ton hot metal),which once led to hanging-up and shutdowns in practice of the Toulachermet.In order to avoid this weakness,the strategy of medium oxygen blast furnace was presented.The maneuverable zone of the TGR-OBF was determined by the top gas volume,which should not be far from the data of the traditional blast furnace.The deviation of ±12.5% was used,and then the maneuverable blast oxygen content is from 0.30 to 0.47 according to the calculation.The flame temperature and the top gas volume have no much difference compared to those of the traditional blast furnace.The minimum carbon consumption of 357 kg per ton hot metal in the maneuverable zone occurs at the oxygen content of 0.30(fuel saving of 14%).In the unsteady evolution,the N2 accumulation could approach nearly zero after the recycling reached 6 times.Thus far,some TGR-OBF industrial trials have been carried out in different countries,but the method of medium oxygen enriched TGR-OBF has not been implemented,because the accumulation of N2 was worried about.The presented strategy of medium oxygen enriched TGR-OBF is applicable and the strategy with good operational performance is strongly suggested as a forerunner of the full oxygen blast furnace.展开更多
基金supported by the National Natural Science Foundation of China(No.52174296)the Key Laboratory of Metallurgical Industry Safety&Risk Prevention and Control,Ministry of Emergency Management,China.
文摘The safety and longevity of key blast furnace(BF)equipment determine the stable and low-carbon production of iron.This pa-per presents an analysis of the heat transfer characteristics of these components and the uneven distribution of cooling water in parallel pipes based on hydrodynamic principles,discusses the feasible methods for the improvement of BF cooling intensity,and reviews the pre-paration process,performance,and damage characteristics of three key equipment pieces:coolers,tuyeres,and hearth refractories.Fur-thermoere,to attain better control of these critical components under high-temperature working conditions,we propose the application of optimized technologies,such as BF operation and maintenance technology,self-repair technology,and full-lifecycle management techno-logy.Finally,we propose further researches on safety assessments and predictions for key BF equipment under new operating conditions.
文摘One of the problems encountered in 60's to 80's of 20th century in China's steel industry was short life of blast furnace shaft as well as the excessive erosion of blast furnace hearth. A series of research work was carried out in order to extend blast furnace campaign life. The concept of research and development was integrated in the construction of BF (blast furnace) No. 5 at WISCO (Wuhan Iron and Steel Corporation), and in October, 1991, the BF No. 5 was blown in. The blast furnace has worked smoothly for more than 15 years without any medium repair even guniting. It is expected that the campaign life of BF No. 5 would be longer than 16 years with a production over 11 000 t per unit inner volume (m^2). A new blast furnace with an inner volume of 3 400 m^3 is under construction, and is designed with a campaign life of 20 years without any medium repair. The campaign life of blast furnaces in China has been extended in recent years.
文摘A new type regulating valve with the cooling mode of constant temperature difference water supply, temperature difference self operated regulating valve, was introduced into blast furnace cooling system to overcome shortcomings of the cooling mode of constant flow rate water supply. The results show that the temperature difference between inlet and outlet water of cooling wall can be decreased greatly and steadily, and the water supply for blast furnace cooling can be reduced considerably.
基金Item Sponsored by National Natural Science Foundation of China(60472095)
文摘A monitoring method that has been designed for the first time for blast furnace wall with copper staves manufactured in China was introduced. Combining the method of "inverse problem" and the concept "non-inverse problem", the monitoring program for blast furnace wall with copper staves has been realized, which can be used to calculate online the accretion thickness and temperature of hot surface of copper staves after obtaining the values of thermocouples of copper staves. The accretion state obtained in the actual investigation has proved that the result of the program is correct. The monitoring program shows that the accretion would easily fluctuate when the accretion layer is extremely thick or thin, thereby the stable and smooth operation of the blast furnace is hindered. By maintaining appropriate accretion thickness, both long campaigns and high productivity of the blast furnace can be achieved; furthermore, it can also optimize the operation of blast furnace and maximize its production. Approximately 30--50 mm in thickness of accretion layer is maintained on the wall of Shougang blast furnace 2, which can meet the requirement for obtaining both long campaign and high productivity.
文摘At the beginning of 1990s, Shougang blast furnaces (BFs) No. 2, No. 4, No. 3 and No. 1 were rebuilt se quently for new technological modernization in succession. The campaign life of BFs No. 1, No. 3 and No. 4 reaches 16.4, 17.6 and 15.6 years, respectively, and the hot metal output of one campaign reaches 33.8, 35.48 and 26.37 Mt, respectively; the hot metal output of BF effective volume of one campaign reaches 13328, 13991 and 12560 t/m^3, respectively, which reaches the international advanced level of BF high efficiency and long campaign life. In BF desig-ning, several advanced BF long campaign technologies were adopted. BF proper inner profile was optimized, reasona- ble inner profile was adopted, and closed circulating soften water cooling technology was applied in 4 BFs. Double row cooling pipe high efficiency cooling stave was developed which could prolong the service life of bosh, belly and stack. Hot pressed carbon brick and ceramic cup hearth lining structure were applied and optimized. BF operation was improved continuously to ensure stable and smooth operation of BF. Hearth working condition control was strengthened, burden distribution control technology was applied to achieve reasonable distribution of gas flow, and heat load monitoring was strengthened to maintain BF reasonable working inner profile. Proper maintenance at the end of BF campaign was enhanced. Hearth and bottom service life was prolonged by adding titaniferous material and enhancing hearth cooling. Gunning of lining was carried out periodically for the area above tuyere zone.
基金supported by the National Key Technologies R&D Program of China(Grant No.2011BAE04B02)Key Technologies R&D Program of Beijing(Grant No.Z161100000716002)
文摘Top gas recycling oxygen blast furnace(TGR-OBF)process is a promising ironmaking process.The biggest challenge of the TGR-OBF in operation is the dramatic decrease of top gas volume(per ton hot metal),which once led to hanging-up and shutdowns in practice of the Toulachermet.In order to avoid this weakness,the strategy of medium oxygen blast furnace was presented.The maneuverable zone of the TGR-OBF was determined by the top gas volume,which should not be far from the data of the traditional blast furnace.The deviation of ±12.5% was used,and then the maneuverable blast oxygen content is from 0.30 to 0.47 according to the calculation.The flame temperature and the top gas volume have no much difference compared to those of the traditional blast furnace.The minimum carbon consumption of 357 kg per ton hot metal in the maneuverable zone occurs at the oxygen content of 0.30(fuel saving of 14%).In the unsteady evolution,the N2 accumulation could approach nearly zero after the recycling reached 6 times.Thus far,some TGR-OBF industrial trials have been carried out in different countries,but the method of medium oxygen enriched TGR-OBF has not been implemented,because the accumulation of N2 was worried about.The presented strategy of medium oxygen enriched TGR-OBF is applicable and the strategy with good operational performance is strongly suggested as a forerunner of the full oxygen blast furnace.