A novel water control technology that com- bines the features of a reticular blind drainage system and a vertical hierarchical drainage system is developed and applied in the Yanziyan Sanitary Landfill, which is locat...A novel water control technology that com- bines the features of a reticular blind drainage system and a vertical hierarchical drainage system is developed and applied in the Yanziyan Sanitary Landfill, which is located at an area (Loudi City, Hunan Province, China) with high rainfall and high groundwater level. The reticular blind drain system, which was installed on the bottom and side walls of the landfill site, can conveniently guide the flow of groundwater out of the site while preventing a disorga- nized flow of groundwater. The vertical hierarchical drainage system was installed to separate rainfall water and leachate in the landfill site, thus efficiently reducing the pressure of leachate treatment. The whole drainage system plays a key role in foundation stabilization by seepage control and separation and in the instant drainage of rainfall water. The leachate reduction efficiency of the drainage technology was calculated in terms of leachate production before (336519 m3) and after (29664 m3) technology application. Over 90% of leachate derived from rainfall water and groundwater inflow was avoided upon installation of the vertical hierarchical drainage and reticular blind drainage systems. The technology can thus be popularized and applied for water control in landfills located in areas with high rainfall and high groundwater level. The proposed technology can be used to alleviate the pressure of leachate treatment and to reduce the risk of instability.展开更多
The authors analyzed the engineering geological characteristics of the slope of the study area (K75+840-K76+340). Two typical cross-sections have been chosen to analyze the failure modes after the excavation of the hi...The authors analyzed the engineering geological characteristics of the slope of the study area (K75+840-K76+340). Two typical cross-sections have been chosen to analyze the failure modes after the excavation of the highway. Different types of the failure modes have been calculated and analyzed. The results show that some dealing methods have been advised to ensure the stability of the slopes.展开更多
基金This research project was funded by the National High Technology Research and Development Program of China (Grant No. 2007AA06Z350), the National Natural Science Foundation of China (Grant No. 41101225), and the Key Laboratory for Solid Waste Management and Environment Safety, Ministry of Education of China (No. SWMES 2011-11). The authors would like to express sincere thanks to Mr. Luis Miguel for help in language correction.
文摘A novel water control technology that com- bines the features of a reticular blind drainage system and a vertical hierarchical drainage system is developed and applied in the Yanziyan Sanitary Landfill, which is located at an area (Loudi City, Hunan Province, China) with high rainfall and high groundwater level. The reticular blind drain system, which was installed on the bottom and side walls of the landfill site, can conveniently guide the flow of groundwater out of the site while preventing a disorga- nized flow of groundwater. The vertical hierarchical drainage system was installed to separate rainfall water and leachate in the landfill site, thus efficiently reducing the pressure of leachate treatment. The whole drainage system plays a key role in foundation stabilization by seepage control and separation and in the instant drainage of rainfall water. The leachate reduction efficiency of the drainage technology was calculated in terms of leachate production before (336519 m3) and after (29664 m3) technology application. Over 90% of leachate derived from rainfall water and groundwater inflow was avoided upon installation of the vertical hierarchical drainage and reticular blind drainage systems. The technology can thus be popularized and applied for water control in landfills located in areas with high rainfall and high groundwater level. The proposed technology can be used to alleviate the pressure of leachate treatment and to reduce the risk of instability.
文摘The authors analyzed the engineering geological characteristics of the slope of the study area (K75+840-K76+340). Two typical cross-sections have been chosen to analyze the failure modes after the excavation of the highway. Different types of the failure modes have been calculated and analyzed. The results show that some dealing methods have been advised to ensure the stability of the slopes.