Testing was completed on an earlier roof bolter CAC that used slots to provide a perimeter airflow. NIOSH tested it due to its unique design that differed from canopies that provided uniform airflow. Based upon NIOSH ...Testing was completed on an earlier roof bolter CAC that used slots to provide a perimeter airflow. NIOSH tested it due to its unique design that differed from canopies that provided uniform airflow. Based upon NIOSH recommendations from the earlier testing, a 3rd generation roof bolter CAC has been developed by J.H. Fletcher & Co. The changes to this CAC involve design modifications to the plenum outlets, using a single row of outlets on the perimeter and a different material for the plenum. This laboratory testing was a continuation of the original perimeter slotted CAC design. Using gravimetric and instantaneous sampling of respirable dust concentrations underneath and outside of the CAC. the laboratory testing was completed using three different blower fans that delivered differing airflows. The maximum plenum airflow velocities ranged from 2.34 to 3.64 m/s (460-716 fpm). Results showed plenum respirable dust concentrations ranging from 34.6% to 49.3% lower than respirable dust concentrations outside the plenum protection zone, thus showing an improvement in protection for the roof bolter operators.展开更多
A 3rd generation roof bolter canopy air curtain(CAC)has been developed and constructed by J.H.Fletcher&Co.,Inc.As with the previous generation of the CAC,this design uses the principle of providing uniform airflow...A 3rd generation roof bolter canopy air curtain(CAC)has been developed and constructed by J.H.Fletcher&Co.,Inc.As with the previous generation of the CAC,this design uses the principle of providing uniform airflow across the canopy area as recommended by the National Institute for Occupational Safety and Health.The new modifications include a plenum that is constructed of a single flat aluminum plate,smaller-diameter airflow openings,and a single row of perimeter nozzles designed to prevent mine air contaminated by respirable dust from entering the CAC protection zone.Field testing was conducted on this new 3rd generation design showing reductions in coal mine respirable dust exposure for roof bolter operators.Dust control efficiencies for the CAC for the left bolter operator(intake side)ranged from approximately 26%–60%,while the efficiencies for the CAC for the right bolter operator(return side)ranged from 3%to 47%.展开更多
Roof and rib instability is an important issue in underground mining. To optimize ground support design,enhance ground stability, and reduce the possibility of roof or rib failure with minimal use of artificial ground...Roof and rib instability is an important issue in underground mining. To optimize ground support design,enhance ground stability, and reduce the possibility of roof or rib failure with minimal use of artificial ground support, it is essential to have an accurate understanding of ground conditions. This includes the location of voids, cracks, and discontinuities, as well as information about the different strata in the immediate roof. This paper briefly introduces ongoing research on void detection by using the roof bolter feed and rotation pressure. The goal of this project is to improve the sensitivity of detection programs to locate smaller joints and reduce the number of false alarms. This paper presents a brief review of the testing procedures, data analysis, logic, and algorithms used for void detection. In addition, this paper discusses the results of preliminary laboratory tests and statistical analysis of the data from these two drilling parameters used for void detection.展开更多
A 2nd generation roof bolter canopy air curtain(CAC)design was tested by National Institute for Occupational Safety and Health(NIOSH)at a Midwestern underground coal mine.During the study,the roof bolter never operate...A 2nd generation roof bolter canopy air curtain(CAC)design was tested by National Institute for Occupational Safety and Health(NIOSH)at a Midwestern underground coal mine.During the study,the roof bolter never operated downwind of the continuous miner.Using a combination of personal Data Rams(pDR)and gravimetric samplers,the dust control efficiency of the roof bolter CAC was ascertained.Performance evaluation was determined using three methods:(1)comparing roof bolter operator concentrations underneath the CAC to roof bolter concentrations outside the CAC,(2)comparing roof bolter operator concentrations underneath the CAC to the concentrations at the rear of the bolter,and finally,(3)using the gravimetric data directly underneath the CAC to correct roof bolter operator concentrations underneath the CAC and comparing them to the concentrations at the rear of the bolter.Method 1 dust control efficiencies ranged from 53.9%to 60.4%.Method 2 efficiencies ranged from 150.5%to 52.2%,and Method 3 efficiencies ranged from 40.7%to 91%.Reasons for negative and low dust control efficiencies are provided in this paper and include:incorrect sampling locations,large distance between CAC and operator,and contamination of intake air from line curtain.Low dust concentrations encountered during the testing made it difficult to discern whether differences in concentrations were due to the CAC or due to variances inherent in experimental dust measurement.However,the analyses,especially the Method 3 analysis,show that the CAC can be an effective dust control device.展开更多
Despite recent advances in mine health and safety, roof collapse and instabilities are still the leading causes of injury and fatality in underground mining operations. Improving safety and optimum design of ground su...Despite recent advances in mine health and safety, roof collapse and instabilities are still the leading causes of injury and fatality in underground mining operations. Improving safety and optimum design of ground support requires good and reliable ground characterization. While many geophysical methods have been developed for ground characterizations, their accuracy is insufficient for customized ground support design of underground workings. The actual measurements on the samples of the roof and wall strata from the exploration boring are reliable but the related holes are far apart, thus unsuitable for design purposes. The best source of information could be the geological back mapping of the roof and walls, but this is disruptive to mining operations, and provided information is only from rock surface.Interpretation of the data obtained from roof bolt drilling can offer a good and reliable source of information that can be used for ground characterization and ground support design and evaluations. This paper offers a brief review of the mine roof characterization methods, followed by introduction and discussion of the roof characterization methods by instrumented roof bolters. A brief overview of the results of the preliminary study and initial testing on an instrumented drill and summary of the suggested improvements are also discussed.展开更多
The drilling operation in the roof bolting process,especially in hard rock,generates excessive respirable coal and quartz dusts,which could expose the roof bolting operator to continued health risks.Previous research ...The drilling operation in the roof bolting process,especially in hard rock,generates excessive respirable coal and quartz dusts,which could expose the roof bolting operator to continued health risks.Previous research has shown that the amount of respirable dust produced is dependent on the main drilling parameters,specifically the drilling rotational and penetration rate.In this paper,a roof bolter drilling control process was proposed to reduce the generation of respirable dust.Based on the analysis of laboratory drilling test results,a rational drilling control process(adjusting rotational and penetration rates)to achieve the optimal drilling parameter for different rock types was proposed.In this process,the ratio between specific energy and rock uniaxial compressive strength was used as the index to determine the optimal operation point.The recommended drilling operation range for the rock type used in the experiment was provided,and the reduction in respirable dust generation was demonstrated.By following this control process,the drilling efficiency can be monitored in real time,so the system can stay in a relatively high-energy efficiency with less respirable dust production from the drilling source.This algorithm is targeted to be incorporated into the current roof bolter drilling control system for drilling automation so that a safe and productive drilling operation can be conducted in a healthy working environment.展开更多
文摘Testing was completed on an earlier roof bolter CAC that used slots to provide a perimeter airflow. NIOSH tested it due to its unique design that differed from canopies that provided uniform airflow. Based upon NIOSH recommendations from the earlier testing, a 3rd generation roof bolter CAC has been developed by J.H. Fletcher & Co. The changes to this CAC involve design modifications to the plenum outlets, using a single row of outlets on the perimeter and a different material for the plenum. This laboratory testing was a continuation of the original perimeter slotted CAC design. Using gravimetric and instantaneous sampling of respirable dust concentrations underneath and outside of the CAC. the laboratory testing was completed using three different blower fans that delivered differing airflows. The maximum plenum airflow velocities ranged from 2.34 to 3.64 m/s (460-716 fpm). Results showed plenum respirable dust concentrations ranging from 34.6% to 49.3% lower than respirable dust concentrations outside the plenum protection zone, thus showing an improvement in protection for the roof bolter operators.
文摘A 3rd generation roof bolter canopy air curtain(CAC)has been developed and constructed by J.H.Fletcher&Co.,Inc.As with the previous generation of the CAC,this design uses the principle of providing uniform airflow across the canopy area as recommended by the National Institute for Occupational Safety and Health.The new modifications include a plenum that is constructed of a single flat aluminum plate,smaller-diameter airflow openings,and a single row of perimeter nozzles designed to prevent mine air contaminated by respirable dust from entering the CAC protection zone.Field testing was conducted on this new 3rd generation design showing reductions in coal mine respirable dust exposure for roof bolter operators.Dust control efficiencies for the CAC for the left bolter operator(intake side)ranged from approximately 26%–60%,while the efficiencies for the CAC for the right bolter operator(return side)ranged from 3%to 47%.
文摘Roof and rib instability is an important issue in underground mining. To optimize ground support design,enhance ground stability, and reduce the possibility of roof or rib failure with minimal use of artificial ground support, it is essential to have an accurate understanding of ground conditions. This includes the location of voids, cracks, and discontinuities, as well as information about the different strata in the immediate roof. This paper briefly introduces ongoing research on void detection by using the roof bolter feed and rotation pressure. The goal of this project is to improve the sensitivity of detection programs to locate smaller joints and reduce the number of false alarms. This paper presents a brief review of the testing procedures, data analysis, logic, and algorithms used for void detection. In addition, this paper discusses the results of preliminary laboratory tests and statistical analysis of the data from these two drilling parameters used for void detection.
文摘A 2nd generation roof bolter canopy air curtain(CAC)design was tested by National Institute for Occupational Safety and Health(NIOSH)at a Midwestern underground coal mine.During the study,the roof bolter never operated downwind of the continuous miner.Using a combination of personal Data Rams(pDR)and gravimetric samplers,the dust control efficiency of the roof bolter CAC was ascertained.Performance evaluation was determined using three methods:(1)comparing roof bolter operator concentrations underneath the CAC to roof bolter concentrations outside the CAC,(2)comparing roof bolter operator concentrations underneath the CAC to the concentrations at the rear of the bolter,and finally,(3)using the gravimetric data directly underneath the CAC to correct roof bolter operator concentrations underneath the CAC and comparing them to the concentrations at the rear of the bolter.Method 1 dust control efficiencies ranged from 53.9%to 60.4%.Method 2 efficiencies ranged from 150.5%to 52.2%,and Method 3 efficiencies ranged from 40.7%to 91%.Reasons for negative and low dust control efficiencies are provided in this paper and include:incorrect sampling locations,large distance between CAC and operator,and contamination of intake air from line curtain.Low dust concentrations encountered during the testing made it difficult to discern whether differences in concentrations were due to the CAC or due to variances inherent in experimental dust measurement.However,the analyses,especially the Method 3 analysis,show that the CAC can be an effective dust control device.
基金supported by the funding of the National Institute for Occupational Safety and Health under a contract with the Pennsylvania State University as part of the capacity building in ground supportthe funding from TüBITAK of Turkey has been used to support the sabbatical leave of Dr.Kahraman who made some contributions to this study
文摘Despite recent advances in mine health and safety, roof collapse and instabilities are still the leading causes of injury and fatality in underground mining operations. Improving safety and optimum design of ground support requires good and reliable ground characterization. While many geophysical methods have been developed for ground characterizations, their accuracy is insufficient for customized ground support design of underground workings. The actual measurements on the samples of the roof and wall strata from the exploration boring are reliable but the related holes are far apart, thus unsuitable for design purposes. The best source of information could be the geological back mapping of the roof and walls, but this is disruptive to mining operations, and provided information is only from rock surface.Interpretation of the data obtained from roof bolt drilling can offer a good and reliable source of information that can be used for ground characterization and ground support design and evaluations. This paper offers a brief review of the mine roof characterization methods, followed by introduction and discussion of the roof characterization methods by instrumented roof bolters. A brief overview of the results of the preliminary study and initial testing on an instrumented drill and summary of the suggested improvements are also discussed.
文摘The drilling operation in the roof bolting process,especially in hard rock,generates excessive respirable coal and quartz dusts,which could expose the roof bolting operator to continued health risks.Previous research has shown that the amount of respirable dust produced is dependent on the main drilling parameters,specifically the drilling rotational and penetration rate.In this paper,a roof bolter drilling control process was proposed to reduce the generation of respirable dust.Based on the analysis of laboratory drilling test results,a rational drilling control process(adjusting rotational and penetration rates)to achieve the optimal drilling parameter for different rock types was proposed.In this process,the ratio between specific energy and rock uniaxial compressive strength was used as the index to determine the optimal operation point.The recommended drilling operation range for the rock type used in the experiment was provided,and the reduction in respirable dust generation was demonstrated.By following this control process,the drilling efficiency can be monitored in real time,so the system can stay in a relatively high-energy efficiency with less respirable dust production from the drilling source.This algorithm is targeted to be incorporated into the current roof bolter drilling control system for drilling automation so that a safe and productive drilling operation can be conducted in a healthy working environment.