期刊文献+
共找到159篇文章
< 1 2 8 >
每页显示 20 50 100
Hydrodynamic Characteristics of Undular Tidal Bores in the Qiantang River Based on Field Observations
1
作者 ZHANG Shu-yu PAN Cun-hong +3 位作者 ZHANG Shen-yang LI Ruo-hua CHENG Wenlong XIE Dong-feng 《China Ocean Engineering》 SCIE EI CSCD 2024年第3期505-518,共14页
Understanding the undular tidal bores in the Qiantang River is essential for effective river management and maintenance.While breaking tidal bores have been studied extensively, reports on undular tidal bores in the Q... Understanding the undular tidal bores in the Qiantang River is essential for effective river management and maintenance.While breaking tidal bores have been studied extensively, reports on undular tidal bores in the Qiantang Riverremain limited. Furthermore, observed data on undular tidal bores fulfilling the requirements of short measurementtime intervals, and spring, medium, and neap tide coverage, and providing detailed data for the global vertical stratificationof flow velocity are quite limited. Based on field observations at Qige in the Qiantang estuary, we analyzedthe characteristics of undular tidal bores. The results showed that the flooding amplitude (a) of the first wave isalways larger than its ebbing amplitude (b). Moreover, the vertical distribution of the maximum flood velocity exhibitesthree shapes, influenced by the tidal range, while that of the maximum ebb velocity exhibites a single shape. Duringthe initial phase of the flood tide in the spring and medium tides, the upper water body experiences multiple oscillatingchanges along the flow direction, corresponding to the alternating process of the crest and trough of the tide levelupon the arrival of the tidal bore. The tidal range is a crucial parameter in tidal bore hydrodynamics. By establishingthe relationship between hydrodynamic parameters and tidal range, other hydrodynamic parameters, such as the tidalbore height, maximum flood depth–averaged velocity, maximum flood stratified velocity at the measurement points,and duration of the flood tide current, can be effectively predicted, thereby providing an important reference for rivermanagement and maintenance. 展开更多
关键词 tidal bores Qiantang Estuary tidal bore height tidal bore velocity propagation speed
下载PDF
Flume Experiment Investigation on Propagation Characteristics of Tidal Bore in A Curved Channel
2
作者 FAN Jun TAO Ai-feng +2 位作者 SHI Mo-quan LI Ying PENG Ji 《China Ocean Engineering》 SCIE EI CSCD 2023年第1期131-144,共14页
Tidal bore is a special and intensive form of flow movement induced by tidal effect in estuary areas, which has complex characteristics of profile, propagation and flow velocity. Although it has been widely studied fo... Tidal bore is a special and intensive form of flow movement induced by tidal effect in estuary areas, which has complex characteristics of profile, propagation and flow velocity. Although it has been widely studied for the generation mechanism, propagation features and influencing factors, the curved channel will complicate the characteristics of tidal bore propagation, which need further investigation compared with straight channel. In this study, the flume experiments for both undular and breaking bores’ propagation in curved channel are performed to measure the freesurface elevation and flow velocity by ultrasonic sensors and ADV respectively. The propagation characteristics,including tidal bore height, cross-section surface gradient, tidal bore propagation celerity, and flow velocity are obtained for both sides of the curved channel. And three bore intensities are set for each type of tidal bores. The freesurface gradients are consistently enlarged in high-curvature section for undular and breaking bores, but have distinct behaviors in low-curvature section. The spatial distributions of tidal bore propagation celerity and flow velocity are compared between concave and convex banks. This work will provide experimental reference for engineering design of beach and seawall protection, erosion reduction and siltation promotion in estuary areas with the existence of tidal bores. 展开更多
关键词 tidal bore curved channel flume experiment propagation celerity bore intensity
下载PDF
Quality Control Measures of Bored Pile in Bridge Construction
3
作者 Lin Nan Guangjun Li +3 位作者 Yan Liu Xu Meng Yingying Ye Zhongyang Sun 《Journal of World Architecture》 2023年第2期47-52,共6页
In order to improve the quality of bored piles in bridge construction and ensure the overall quality of the bridge,we analyzed a series of problems in the construction process of bored piles,then propose corresponding... In order to improve the quality of bored piles in bridge construction and ensure the overall quality of the bridge,we analyzed a series of problems in the construction process of bored piles,then propose corresponding quality control measures,in hopes of improving quality control of bored piles in bridge construction in our country. 展开更多
关键词 Bridge construction bored pile Quality control
下载PDF
开挖补偿法防控深部地下岩爆灾害——引汉济渭工程秦岭输水隧洞案例分析 被引量:1
4
作者 Jie Hu Manchao He +4 位作者 Hongru Li Zhigang Tao Dongqiao Liu Tai Cheng Di Peng 《Engineering》 SCIE EI CAS CSCD 2024年第3期154-163,共10页
Rockburst disasters occur frequently during deep underground excavation,yet traditional concepts and methods can hardly meet the requirements for support under high geo-stress conditions.Consequently,rockburst control... Rockburst disasters occur frequently during deep underground excavation,yet traditional concepts and methods can hardly meet the requirements for support under high geo-stress conditions.Consequently,rockburst control remains challenging in the engineering field.In this study,the mechanism of excavation-induced rockburst was briefly described,and it was proposed to apply the excavation compensation method(ECM)to rockburst control.Moreover,a field test was carried out on the Qinling Water Conveyance Tunnel.The following beneficial findings were obtained:Excavation leads to changes in the engineering stress state of surrounding rock and results in the generation of excess energy DE,which is the fundamental cause of rockburst.The ECM,which aims to offset the deep excavation effect and lower the risk of rockburst,is an active support strategy based on high pre-stress compensation.The new negative Poisson’s ratio(NPR)bolt developed has the mechanical characteristics of high strength,high toughness,and impact resistance,serving as the material basis for the ECM.The field test results reveal that the ECM and the NPR bolt succeed in controlling rockburst disasters effectively.The research results are expected to provide guidance for rockburst support in deep underground projects such as Sichuan-Xizang Railway. 展开更多
关键词 ROCKBURST Excavation compensation method Pre-stressed support Negative Poisson’s ratio bolt Tunnel boring machine
下载PDF
Experimental study and numerical analysis on bearing behaviors of super-long rock-socketed bored pile groups 被引量:2
5
作者 高睿 胡念 朱斌 《Journal of Southeast University(English Edition)》 EI CAS 2010年第4期597-602,共6页
A centrifuge modeling test and a three-dimensional finite element analysis(FEA)of super-long rock-socketed bored pile groups of the Tianxingzhou Bridge are proposed.Based on the similarity theory,different prototypi... A centrifuge modeling test and a three-dimensional finite element analysis(FEA)of super-long rock-socketed bored pile groups of the Tianxingzhou Bridge are proposed.Based on the similarity theory,different prototypical materials are simulated using different indicators in the centrifuge model.The silver sand,the shaft and the pile cap are simulated according to the natural density,the compressive stiffness and the bending stiffness,respectively.The finite element method(FEM)is implemented and analyzed in ANSYS,in which the stress field during the undisturbed soil stage,the boring stage,the concrete-casting stage and the curing stage are discussed in detail.Comparisons in terms of load-settlement,shaft axial force distribution and lateral friction between the numerical results and the test data are carried out to investigate the bearing behaviors of super-long rock-socketed bored pile groups under loading and unloading conditions.Results show that there is a good agreement between the centrifuge modeling tests and the FEM.In addition,the load distribution at the pile top is complicated,which is related to the stiffness of the cap,the corresponding assumptions and the analysis method.The shaft axial force first increases slightly with depth then decreases sharply,and the rate of decrease in rock is greater than that in sand and soil. 展开更多
关键词 super-long rock-socketed pile bored pile groups centrifuge modeling test finite element analysis
下载PDF
An Optimized System of Random Forest Model by Global Harmony Search with Generalized Opposition-Based Learning for Forecasting TBM Advance Rate
6
作者 Yingui Qiu Shuai Huang +3 位作者 Danial Jahed Armaghani Biswajeet Pradhan Annan Zhou Jian Zhou 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第3期2873-2897,共25页
As massive underground projects have become popular in dense urban cities,a problem has arisen:which model predicts the best for Tunnel Boring Machine(TBM)performance in these tunneling projects?However,performance le... As massive underground projects have become popular in dense urban cities,a problem has arisen:which model predicts the best for Tunnel Boring Machine(TBM)performance in these tunneling projects?However,performance level of TBMs in complex geological conditions is still a great challenge for practitioners and researchers.On the other hand,a reliable and accurate prediction of TBM performance is essential to planning an applicable tunnel construction schedule.The performance of TBM is very difficult to estimate due to various geotechnical and geological factors and machine specifications.The previously-proposed intelligent techniques in this field are mostly based on a single or base model with a low level of accuracy.Hence,this study aims to introduce a hybrid randomforest(RF)technique optimized by global harmony search with generalized oppositionbased learning(GOGHS)for forecasting TBM advance rate(AR).Optimizing the RF hyper-parameters in terms of,e.g.,tree number and maximum tree depth is the main objective of using the GOGHS-RF model.In the modelling of this study,a comprehensive databasewith themost influential parameters onTBMtogetherwithTBM AR were used as input and output variables,respectively.To examine the capability and power of the GOGHSRF model,three more hybrid models of particle swarm optimization-RF,genetic algorithm-RF and artificial bee colony-RF were also constructed to forecast TBM AR.Evaluation of the developed models was performed by calculating several performance indices,including determination coefficient(R2),root-mean-square-error(RMSE),and mean-absolute-percentage-error(MAPE).The results showed that theGOGHS-RF is a more accurate technique for estimatingTBMAR compared to the other applied models.The newly-developedGOGHS-RFmodel enjoyed R2=0.9937 and 0.9844,respectively,for train and test stages,which are higher than a pre-developed RF.Also,the importance of the input parameters was interpreted through the SHapley Additive exPlanations(SHAP)method,and it was found that thrust force per cutter is the most important variable on TBMAR.The GOGHS-RF model can be used in mechanized tunnel projects for predicting and checking performance. 展开更多
关键词 Tunnel boring machine random forest GOGHS optimization PSO optimization GA optimization ABC optimization SHAP
下载PDF
A performance-based hybrid deep learning model for predicting TBM advance rate using Attention-ResNet-LSTM
7
作者 Sihao Yu Zixin Zhang +2 位作者 Shuaifeng Wang Xin Huang Qinghua Lei 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第1期65-80,共16页
The technology of tunnel boring machine(TBM)has been widely applied for underground construction worldwide;however,how to ensure the TBM tunneling process safe and efficient remains a major concern.Advance rate is a k... The technology of tunnel boring machine(TBM)has been widely applied for underground construction worldwide;however,how to ensure the TBM tunneling process safe and efficient remains a major concern.Advance rate is a key parameter of TBM operation and reflects the TBM-ground interaction,for which a reliable prediction helps optimize the TBM performance.Here,we develop a hybrid neural network model,called Attention-ResNet-LSTM,for accurate prediction of the TBM advance rate.A database including geological properties and TBM operational parameters from the Yangtze River Natural Gas Pipeline Project is used to train and test this deep learning model.The evolutionary polynomial regression method is adopted to aid the selection of input parameters.The results of numerical exper-iments show that our Attention-ResNet-LSTM model outperforms other commonly-used intelligent models with a lower root mean square error and a lower mean absolute percentage error.Further,parametric analyses are conducted to explore the effects of the sequence length of historical data and the model architecture on the prediction accuracy.A correlation analysis between the input and output parameters is also implemented to provide guidance for adjusting relevant TBM operational parameters.The performance of our hybrid intelligent model is demonstrated in a case study of TBM tunneling through a complex ground with variable strata.Finally,data collected from the Baimang River Tunnel Project in Shenzhen of China are used to further test the generalization of our model.The results indicate that,compared to the conventional ResNet-LSTM model,our model has a better predictive capability for scenarios with unknown datasets due to its self-adaptive characteristic. 展开更多
关键词 Tunnel boring machine(TBM) Advance rate Deep learning Attention-ResNet-LSTM Evolutionary polynomial regression
下载PDF
Effects of data smoothing and recurrent neural network(RNN)algorithms for real-time forecasting of tunnel boring machine(TBM)performance
8
作者 Feng Shan Xuzhen He +1 位作者 Danial Jahed Armaghani Daichao Sheng 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第5期1538-1551,共14页
Tunnel boring machines(TBMs)have been widely utilised in tunnel construction due to their high efficiency and reliability.Accurately predicting TBM performance can improve project time management,cost control,and risk... Tunnel boring machines(TBMs)have been widely utilised in tunnel construction due to their high efficiency and reliability.Accurately predicting TBM performance can improve project time management,cost control,and risk management.This study aims to use deep learning to develop real-time models for predicting the penetration rate(PR).The models are built using data from the Changsha metro project,and their performances are evaluated using unseen data from the Zhengzhou Metro project.In one-step forecast,the predicted penetration rate follows the trend of the measured penetration rate in both training and testing.The autoregressive integrated moving average(ARIMA)model is compared with the recurrent neural network(RNN)model.The results show that univariate models,which only consider historical penetration rate itself,perform better than multivariate models that take into account multiple geological and operational parameters(GEO and OP).Next,an RNN variant combining time series of penetration rate with the last-step geological and operational parameters is developed,and it performs better than other models.A sensitivity analysis shows that the penetration rate is the most important parameter,while other parameters have a smaller impact on time series forecasting.It is also found that smoothed data are easier to predict with high accuracy.Nevertheless,over-simplified data can lose real characteristics in time series.In conclusion,the RNN variant can accurately predict the next-step penetration rate,and data smoothing is crucial in time series forecasting.This study provides practical guidance for TBM performance forecasting in practical engineering. 展开更多
关键词 Tunnel boring machine(TBM) Penetration rate(PR) Time series forecasting Recurrent neural network(RNN)
下载PDF
Philips公司Brilliance CT Big Bore大孔径4DCT常见故障及处理方法
9
作者 黄宝添 《医疗装备》 2014年第5期55-56,共2页
以实例方式介绍Philips公司Brilliance CT Big Bore大孔径4DCT扫描时几类常见的故障现象及其处理方法。
关键词 BRILLIANCE CT BIG bore 4DCT 常见故障 故障处理
下载PDF
A case study on behaviors of composite soil nailed wall with bored piles in a deep excavation 被引量:7
10
作者 ZHU Feng-bin MIAO Lin-chang +1 位作者 GU Huan-da CHENG Yue-hong 《Journal of Central South University》 SCIE EI CAS 2013年第7期2017-2024,共8页
A complete case of a deep excavation was explored. According to the practical working conditions, a 3D non-linear finite element procedure is used to simulate a deep excavation supported by the composite soil nailed w... A complete case of a deep excavation was explored. According to the practical working conditions, a 3D non-linear finite element procedure is used to simulate a deep excavation supported by the composite soil nailed wall with bored piles in soft soil. The modified cam clay model is employed as the constitutive relationship of the soil in the numerical simulation. Results from the numerical analysis are fitted well with the field data, which indicate that the research approach used is reliable. Based on the field data and numerical results of the deep excavation supported by four different patterns of the composite soil nailed wall, the significant corner effect is founded in the 3D deep excavation. If bored piles or soil anchors are considered in the composite soil nailed wall, they are beneficial to decreasing deformations and internal forces of bored piles, cement mixing piles, soil anchors, soil nailings and soil around the deep excavation. Besides, the effects due to bored piles are more significant than those deduced from soil anchors. All mentioned above prove that the composite soil nailed wall with bored piles is feasible in the deep excavation. 展开更多
关键词 deep excavation 3D non-linear finite element bored pile composite soil nailed wall corner effect DEFORMATION internal force
下载PDF
Regressive approach for predicting bearing capacity of bored piles from cone penetration test data 被引量:3
11
作者 Iyad S. Alkroosh Mohammad Bahadori +1 位作者 Hamid Nikraz Alireza Bahadori 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2015年第5期584-592,共9页
In this study, th e least sq u are su p p o rt v ecto r m achine (LSSVM) alg o rith m w as applied to predicting th ebearing capacity o f b ored piles e m b ed d ed in sand an d m ixed soils. Pile g eo m etry an d c... In this study, th e least sq u are su p p o rt v ecto r m achine (LSSVM) alg o rith m w as applied to predicting th ebearing capacity o f b ored piles e m b ed d ed in sand an d m ixed soils. Pile g eo m etry an d cone p e n e tra tio nte s t (CPT) resu lts w ere used as in p u t variables for pred ictio n o f pile bearin g capacity. The d ata u se d w erecollected from th e existing litera tu re an d consisted o f 50 case records. The application o f LSSVM w ascarried o u t by dividing th e d ata into th re e se ts: a train in g se t for learning th e pro b lem an d obtain in g arelationship b e tw e e n in p u t variables an d pile bearin g capacity, and testin g an d validation sets forevaluation o f th e predictive an d g en eralization ability o f th e o b tain ed relationship. The predictions o f pilebearing capacity by LSSVM w ere evaluated by com paring w ith ex p erim en tal d ata an d w ith th o se bytrad itio n al CPT-based m eth o d s and th e gene ex pression pro g ram m in g (GEP) m odel. It w as found th a t th eLSSVM perform s w ell w ith coefficient o f d eterm in atio n , m ean, an d sta n d ard dev iatio n equivalent to 0.99,1.03, an d 0.08, respectively, for th e testin g set, an d 1, 1.04, an d 0.11, respectively, for th e v alidation set. Thelow values o f th e calculated m ean squared e rro r an d m ean ab so lu te e rro r indicated th a t th e LSSVM w asaccurate in p redicting th e pile bearing capacity. The results o f com parison also show ed th a t th e p roposedalg o rith m p red icted th e pile bearin g capacity m ore accurately th a n th e trad itio n al m eth o d s including th eGEP m odel. 展开更多
关键词 bored piles Cone penetration test(CPT) Bearing capacity Least square support vector machine(LSSVM) TRAINING VALIDATION
下载PDF
Influence of friction on buckling of a drill string in the circular channel of a bore hole 被引量:2
12
作者 Valery Gulyayev Natalya Shlyun 《Petroleum Science》 SCIE CAS CSCD 2016年第4期698-711,共14页
Enhancement of technology and techniques for drilling deep directed oil and gas bore hole is one of the most important problems of the current petroleum industry.Not infrequently, the drilling of these bore holes is a... Enhancement of technology and techniques for drilling deep directed oil and gas bore hole is one of the most important problems of the current petroleum industry.Not infrequently, the drilling of these bore holes is attended by occurrence of extraordinary situations associated with technical accidents. Among these is the Eulerian loss of stability of a drill string in the channel of a curvilinear bore hole. Methods of computer simulation should play a dominant role in prediction of these states. In this paper, a new statement of the problem of critical buckling of the drill strings in 3D curvilinear bore holes is proposed. It is based on combined use of the theory of curvilinear elastic rods, Eulerian theory of stability, theory of channel surfaces, and methods of classical mechanics of systems with nonlinear constraints. It is noted that the stated problem is singularly perturbed and its solutions have the shapes of localized harmonic wavelets. The calculation results showed that the friction effects lead to essential redistribution of internal axial forces, as well as changing the eigenmode shapes and sites of their localization. These features make the buckling phenomena less predictable and raise the role of computer simulation of these effects. 展开更多
关键词 Directed bore hole Drill string Critical states Singular perturbation Friction forces Harmonic wavelet
下载PDF
INTERNAL TIDES, SOLITARY WAVES AND BORES IN SHALLOW SEAS 被引量:2
13
作者 王涛 高天赋 《Chinese Journal of Oceanology and Limnology》 SCIE CAS CSCD 2001年第2期103-111,共9页
Remote sensing and in situ observations of internal tides, solitary waves and bores in shallow water are briefly reviewed in this paper. The emphasis is laid on interpreting SAR images based on oceanographic measureme... Remote sensing and in situ observations of internal tides, solitary waves and bores in shallow water are briefly reviewed in this paper. The emphasis is laid on interpreting SAR images based on oceanographic measurements, and analyzing characteristics of internal waves in the China Seas. Directions for future research are discussed. 展开更多
关键词 internal tide internal solitary wave internal bore China Seas remote sensing in situ observation
下载PDF
Tidal Bore Dynamics Around the Similar Right-Angle Shoreline in the Qiantang Estuary,China 被引量:1
14
作者 WANG Qiu-shun PAN Cun-hong CHEN Fu-yuan 《China Ocean Engineering》 SCIE EI CSCD 2022年第5期827-838,共12页
Tidal bores are a unique hydrodynamic phenomenon during flood tide in the Qiantang Estuary.The tidal bore propagation around the similar right-angle shoreline is rarely documented in tidal estuaries.To investigate tid... Tidal bores are a unique hydrodynamic phenomenon during flood tide in the Qiantang Estuary.The tidal bore propagation around the similar right-angle shoreline is rarely documented in tidal estuaries.To investigate tidal bores around this shoreline,a hydrodynamic model combined with a theoretical method is employed to reveal the characteristics of the bore propagation.The theoretical solution of the tidal bore intensity is deduced to illustrate the relationship of the incident tidal bores and the back-flow bores during the propagation.The hydrodynamic model based on shallow water equation is employed to perform the simulation of tidal bores in the estuary.Model results with respect to the bore height and the propagation speed of tidal bores have a favourable agreement with field data.The tidal bore dynamics in the neighborhood of the similar right-angle shoreline are elucidated.The characteristics of tidal bores in terms of water surface,velocity,bore steepness and the intensity are illustrated and the back-flow bore is analyzed by numerical and theoretical methods around the similar right-angle shoreline.The height of the back-flow bore relative to the incident tidal bore ranges from 1.05 to 1.77.Model result reveals that the ambient water depth and the shape of the similar right-angle shoreline are contributed to the back-flow bore formation. 展开更多
关键词 back-flow bore numerical model shallow water equation Qiantang Estuary tidal bores
下载PDF
Numerical Study of Dam-Break Induced Tsunami-Like Bore with A Hump of Different Slopes 被引量:1
15
作者 CHENG Du ZHAO Xi-zeng +1 位作者 ZHANG Da-ke CHEN Yong 《China Ocean Engineering》 SCIE EI CSCD 2017年第6期683-692,共10页
Numerical simulation of dam-break wave, as an imitation of tsunami hydraulic bore, with a hump of different slopes is performed in this paper using an in-house code, named a Constrained Interpolation Profile (CIP)-b... Numerical simulation of dam-break wave, as an imitation of tsunami hydraulic bore, with a hump of different slopes is performed in this paper using an in-house code, named a Constrained Interpolation Profile (CIP)-based model. The model is built on a Cartesian grid system with the Navier Stokes equations using a CIP method for the flow solver, and employs an immersed boundary method (IBM) for the treatment of solid body boundary. A more accurate interface capturing scheme, the Tangent of hyperbola for interface capturing/Slope weighting (THINC/SW) scheme, is adopted as the interface capturing method. Then, the CIP-based model is applied to simulate the dam break flow problem in a bumpy channel. Considerable attention is paid to the spilling type reflected bore, the following spilling type wave breaking, free surface profiles and water level variations over time. Computations are compared with available experimental data and other numerical results quantitatively and qualitatively. Further investigation is conducted to analyze the influence of variable slopes on the flow features of the tsunami-like bore. 展开更多
关键词 dam break tsunami-like bore CIP method VOF method immersed boundary method
下载PDF
In-Situ Test and Numerical Analysis of Bore Pressure on Sheet-Pile Groin 被引量:1
16
作者 徐长节 蔡袁强 +2 位作者 宣伟丽 陈海军 宋洋 《China Ocean Engineering》 SCIE EI 2006年第3期431-442,共12页
An in-situ test of bore pressure on a sheet-pile groin is carried out to investigate the characteristics of the bore pressure of fide in the Qian-tang River. The histories of bore pressure and the rule of the distribu... An in-situ test of bore pressure on a sheet-pile groin is carried out to investigate the characteristics of the bore pressure of fide in the Qian-tang River. The histories of bore pressure and the rule of the distribution of bore pressure on the sheet-pile groin are obtained through the test, which shows that the bore pressure on the sheet-pile groin are varies with time and space. The peak value of bore pressure on sheet-pile groin at different heights occurs almost at the same time. vertical distribution of bore pressure on the sheet-pile groin is linear above the still water level. The maximum bore pressure on the sheet-pile groin occurs at the still water level. Then a numerical method is also used to further study the characteristics of bore pressure. The standard k - ε turbulence model and VOF (volume of fluid) method for surface tracking are used to simulate the bore against the sheet-pile groin. The numerical results show flow fields, the position of free surface and time history and spatial distribution of bore pressure on the sheet-pile groin. The numerical and test resuits show good agreement. 展开更多
关键词 bore pressure dynamic test volume of fluid numerical simulation
下载PDF
Analysis of the effect of bore centerline on projectile exit conditions in small arms 被引量:1
17
作者 David Leonhardt Mark Garnich Miljenko Lucic 《Defence Technology(防务技术)》 SCIE EI CAS CSCD 2022年第12期2160-2169,共10页
Most finite element models of small arms focus on an idealized barrel,typically one with a perfectly straight bore centerline.Using five different experimentally measured bore centerlines,this investigation analyzes t... Most finite element models of small arms focus on an idealized barrel,typically one with a perfectly straight bore centerline.Using five different experimentally measured bore centerlines,this investigation analyzes the effect centerline nonlinearity has on projectile exit conditions.This includes the effect of rotating a centerline through several orientations.Modeled using Abaqus/Explicit,this dynamic analysis simulates a single firing cycle for each centerline.Projectile jump is calculated for each model as a measure of the effects of warped centerlines.The warped centerlines have a small effect on barrel dynamics. 展开更多
关键词 Finite element analysis Small arms Barrel dynamics bore centerline
下载PDF
The Effect of Retrofit Technologies on Formaldehyde Emissions from a Large Bore Natural Gas Engine 被引量:1
18
作者 Daniel B. Olsen Bryan D. Willson 《Energy and Power Engineering》 2011年第4期574-579,共6页
Formaldehyde is an air toxic that is typically emitted from natural gas-fired internal combustion engines as a product of incomplete combustion. The United States Environmental Protection Agency (EPA) regulates air to... Formaldehyde is an air toxic that is typically emitted from natural gas-fired internal combustion engines as a product of incomplete combustion. The United States Environmental Protection Agency (EPA) regulates air toxic emissions, including formaldehyde, from stationary reciprocating internal combustion engines. National air toxic standards are required under the 1990 Clean Air Act Amendments. This work investigates the effect that hardware modifications, or retrofit technologies, have on formaldehyde emissions from a large bore natural gas engine. The test engine is a Cooper-Bessemer GMV-4TF two stroke cycle engine with a 14” (35.6 cm) bore and a 14” (35.6 cm) stroke. The impact of modifications to the fuel injection and ignition systems are investigated. Data analysis and discussion is performed with reference to possible formaldehyde formation mechanisms and in-cylinder phenomena. The results show that high pressure fuel injection (HPFI) and precombustion chamber (PCC) ignition significantly reduce formaldehyde 展开更多
关键词 FORMALDEHYDE NATURAL Gas Fuel INJECTION Precombustion CHAMBER Large bore
下载PDF
Contribution of Electrical Resistivity Tomography and Boring Technique in the Realization of Ten (10) Large Boreholes in a Crystalline Basement Rocks in the Centre-West of Benin 被引量:1
19
作者 Nesny Yanonvoh Akokponhoué Nicaise Yalo +2 位作者 Bertrand Houngnigbo Akokponhoué Rita Houngue George Agbahoungba 《Journal of Geoscience and Environment Protection》 2019年第9期114-130,共17页
In order to ensure access to drinking water for Benin populations by 2021, the Emergency Measure program for the reinforcement of the drinking water supply system of Savalou city was initiated in 2018. This program fo... In order to ensure access to drinking water for Benin populations by 2021, the Emergency Measure program for the reinforcement of the drinking water supply system of Savalou city was initiated in 2018. This program focuses on densification and extension of hydraulic infrastructures. Therefore, it is prominent to use rigorous approach for implementation and execution of drilling activities. The present work has the advantage of combining the use of electrical resistivity tomography and borehole technique to locate ten high flow drilling in Savalou city. The electrical resistivity tomography (ERT) panels were made based on the dipole-dipole arrays with 48 electrodes with 5 m inter-electrode spacing. The drilling was carried out over ten selected points and in two stages: confirmation test using piezometer and borehole diameter enlargement. Moreover, only piezometers with flow rate greater than 10 m3/h were enlarged. The tomography processing has identified 10 fractured zones that are defined by 250 - 1000 ohm.m resistivity values and a width between 15 - 55 m. The confirmation test carried out over ten piezometers exhibits high flow rates ranging from 9 to 35 m3/h with depths of 30 to 68 m. Nine over the ten boreholes with a flow rate equal or greater than 10 m3/h, have improved their flow rates by 50% to 100% after the boring technique. Thus, the cumulative flow rate has reached 252. 7 m3/h for Savalou city and his surrounding areas. 展开更多
关键词 BORING Technique Electrical RESISTIVITY Tomography FRACTURES Savalou
下载PDF
A novel surface-repairing technique for gun bore
20
作者 苏冰 于旭东 +1 位作者 吴斌 王成焘 《Journal of Central South University》 SCIE EI CAS 2005年第S2期250-253,共4页
A novel surface-repairing technique for gun bore was investigated, which was combined with the merits such as anti-erosion wear, damage-repairing, and etc. It was accomplished by adhering a special rare earth nanocomp... A novel surface-repairing technique for gun bore was investigated, which was combined with the merits such as anti-erosion wear, damage-repairing, and etc. It was accomplished by adhering a special rare earth nanocomposite evenly to the micro-surface of gun bore. The effectiveness of this technique was approved by the target-firing using a domestic automatic rifle with chromium-coated bore. Its characteristics were discussed based on the surface analyses of the rifle bore by secondary ion mass spectrometry(SIMS),scanning electron microscopy (SEM) and energy dispersive X-ray spectroscopy (EDS) analysis. 展开更多
关键词 RARE EARTH NANOCOMPOSITE surface-repairing GUN bore
下载PDF
上一页 1 2 8 下一页 到第
使用帮助 返回顶部