In order to improve the quality of bored piles in bridge construction and ensure the overall quality of the bridge,we analyzed a series of problems in the construction process of bored piles,then propose corresponding...In order to improve the quality of bored piles in bridge construction and ensure the overall quality of the bridge,we analyzed a series of problems in the construction process of bored piles,then propose corresponding quality control measures,in hopes of improving quality control of bored piles in bridge construction in our country.展开更多
Bridge bearings are a small part of the whole bridge structure,but it can affect the corner of the bridge,and the stability and quality of the bridge deck,so the performance of the bridge bearing can directly determin...Bridge bearings are a small part of the whole bridge structure,but it can affect the corner of the bridge,and the stability and quality of the bridge deck,so the performance of the bridge bearing can directly determine the quality and lifespan of the entire bridge.The bridge bearing connects the upper and lower parts of the whole bridge.In order to improve the quality and structure of the whole bridge,the layout and selection of bridge bearings needs to be done well,the construction process needs to be closely monitored,and the whole process needs to be well-managed.The existing problems should be analyzed in detail and solved in time to ensure the quality of the bridge project.展开更多
A systematic method was proposed to estimate the occurrence probability of defective piles(OPDP) from a site according to quality assurance inspection. The OPDP was firstly suggested as the criterion to weight the per...A systematic method was proposed to estimate the occurrence probability of defective piles(OPDP) from a site according to quality assurance inspection. The OPDP was firstly suggested as the criterion to weight the performance of a pile foundation. Its prior distribution and updating distribution were deduced to follow Beta distributions. To calibrate the OPDP, a dynamic estimation model was established according to the relationships between prior mean and variance and updating mean and variance. Finally, a reliability-control method dealing with uncertainties arising from quality assurance inspection was formalized to judge whether all the bored piles from a site can be accepted. It is exemplified that the OPDP can be substantially improved when more definite prior information and sampling formation become available. For the example studied herein, the Bayesian estimator of updating variance for OPDP is reduced from 0.0037 to 0.0014 for the first inspection, from 0.0014 to 0.0009 for the second inspection, and with less uncertainty by incorporating experience information.展开更多
文摘In order to improve the quality of bored piles in bridge construction and ensure the overall quality of the bridge,we analyzed a series of problems in the construction process of bored piles,then propose corresponding quality control measures,in hopes of improving quality control of bored piles in bridge construction in our country.
文摘Bridge bearings are a small part of the whole bridge structure,but it can affect the corner of the bridge,and the stability and quality of the bridge deck,so the performance of the bridge bearing can directly determine the quality and lifespan of the entire bridge.The bridge bearing connects the upper and lower parts of the whole bridge.In order to improve the quality and structure of the whole bridge,the layout and selection of bridge bearings needs to be done well,the construction process needs to be closely monitored,and the whole process needs to be well-managed.The existing problems should be analyzed in detail and solved in time to ensure the quality of the bridge project.
基金Project(51278216) supported by the National Natural Science Foundation of ChinaProject(2013BS010) supported by Henan University of Technology Fund for High-level Talent,China
文摘A systematic method was proposed to estimate the occurrence probability of defective piles(OPDP) from a site according to quality assurance inspection. The OPDP was firstly suggested as the criterion to weight the performance of a pile foundation. Its prior distribution and updating distribution were deduced to follow Beta distributions. To calibrate the OPDP, a dynamic estimation model was established according to the relationships between prior mean and variance and updating mean and variance. Finally, a reliability-control method dealing with uncertainties arising from quality assurance inspection was formalized to judge whether all the bored piles from a site can be accepted. It is exemplified that the OPDP can be substantially improved when more definite prior information and sampling formation become available. For the example studied herein, the Bayesian estimator of updating variance for OPDP is reduced from 0.0037 to 0.0014 for the first inspection, from 0.0014 to 0.0009 for the second inspection, and with less uncertainty by incorporating experience information.