The uplift resistance calculation is an important basis for the construction decisions of the jack-up wind installation vessel and the design of the jacking system,and determines the operation risk and reliability in ...The uplift resistance calculation is an important basis for the construction decisions of the jack-up wind installation vessel and the design of the jacking system,and determines the operation risk and reliability in the installation process of the wind turbine. The influence factors of the pile shoe's penetration depth and uplift resistance are analyzed,and the calculation model and flow of the uplift resistance are given. Based on a construction example,the influence rules are analyzed for the change of the pile shoe's structural parameters on the penetration depth and uplift resistance.The analysis results show that the penetration depth is more sensitive to the width of the pile shoe,and the height has greater influence on the uplift resistance than the length and width of the spud. With the increase of the height,the uplift resistance may increase rapidly.Although the decreases of the length,width and height of the pile shoe may reduce the uplift resistance,the penetration depth may increase in the meantime. This will increase the pulling pile time and reduce the construction efficiency. So the parameters of the pile shoe should be optimized according to the adaptable geology condition so as to obtain the optimal uplift resistance and working efficiency.展开更多
The traditional way of installing large vessels has always been to employ the use of cranes. The Water Handling Debottlenecking Project team has, instead, made use of a different technology—employing a Self-Propelled...The traditional way of installing large vessels has always been to employ the use of cranes. The Water Handling Debottlenecking Project team has, instead, made use of a different technology—employing a Self-Propelled Modular Transporter (SPMT) to install nine vessels in situ. These SPMT units have many advantages over crane installations, such as safety and efficiency, not to mention lower costs due to their self-propelled capabilities.展开更多
Current installation costs of offshore wind turbines(OWTs) are high and profit margins in the offshore wind energy sector are low, it is thus necessary to develop installation methods that are more efficient and pract...Current installation costs of offshore wind turbines(OWTs) are high and profit margins in the offshore wind energy sector are low, it is thus necessary to develop installation methods that are more efficient and practical. This paper presents a numerical study(based on a global response analysis of marine operations) of a novel procedure for installing the tower and Rotor Nacelle Assemblies(RNAs) on bottom-fixed foundations of OWTs. The installation procedure is based on the inverted pendulum principle. A cargo barge is used to transport the OWT assembly in a horizontal position to the site, and a medium-size Heavy Lift Vessel(HLV) is then employed to lift and up-end the OWT assembly using a special upending frame. The main advantage of this novel procedure is that the need for a huge HLV(in terms of lifting height and capacity) is eliminated. This novel method requires that the cargo barge is in the leeward side of the HLV(which can be positioned with the best heading) during the entire installation. This is to benefit from shielding effects of the HLV on the motions of the cargo barge, so the foundations need to be installed with a specific heading based on wave direction statistics of the site and a typical installation season. Following a systematic approach based on numerical simulations of actual operations, potential critical installation activities, corresponding critical events, and limiting(response) parameters are identified. In addition, operational limits for some of the limiting parameters are established in terms of allowable limits of sea states. Following a preliminary assessment of these operational limits, the duration of the entire operation, the equipment used, and weather-and water depth-sensitivity, this novel procedure is demonstrated to be viable.展开更多
针对原油转驳船(Cargo Transfer Vessel, CTV)主推进器设备尺寸大、质量大和安装难度大等问题,设置主推进器基座,用于对艉部结构与主推进器的连接安装。详细研究主推进器基座的设计、制造与安装技术。对主推进器基座进行合理的结构设计...针对原油转驳船(Cargo Transfer Vessel, CTV)主推进器设备尺寸大、质量大和安装难度大等问题,设置主推进器基座,用于对艉部结构与主推进器的连接安装。详细研究主推进器基座的设计、制造与安装技术。对主推进器基座进行合理的结构设计,确定有效的焊接工艺和安装流程,可确保基座的结构稳定性和制造与安装的精度。展开更多
基金Department of Transportation Technology of Construction Project,China(No.2013328225080)Natural Science Foundation of Liaoning Province,China(No.2015020121)the Fundamental Research Funds for the Central Universities,China(Nos.3132015087,3132014303)
文摘The uplift resistance calculation is an important basis for the construction decisions of the jack-up wind installation vessel and the design of the jacking system,and determines the operation risk and reliability in the installation process of the wind turbine. The influence factors of the pile shoe's penetration depth and uplift resistance are analyzed,and the calculation model and flow of the uplift resistance are given. Based on a construction example,the influence rules are analyzed for the change of the pile shoe's structural parameters on the penetration depth and uplift resistance.The analysis results show that the penetration depth is more sensitive to the width of the pile shoe,and the height has greater influence on the uplift resistance than the length and width of the spud. With the increase of the height,the uplift resistance may increase rapidly.Although the decreases of the length,width and height of the pile shoe may reduce the uplift resistance,the penetration depth may increase in the meantime. This will increase the pulling pile time and reduce the construction efficiency. So the parameters of the pile shoe should be optimized according to the adaptable geology condition so as to obtain the optimal uplift resistance and working efficiency.
文摘The traditional way of installing large vessels has always been to employ the use of cranes. The Water Handling Debottlenecking Project team has, instead, made use of a different technology—employing a Self-Propelled Modular Transporter (SPMT) to install nine vessels in situ. These SPMT units have many advantages over crane installations, such as safety and efficiency, not to mention lower costs due to their self-propelled capabilities.
基金financially supported by the Research Council of Norway granted through the Department of Marine Technologythe Centre for Ships and Ocean Structures(CeSOS) and the the Centre for Autonomous Marine Operations and Systems(AMOS) from the Norwegian University of Science and Technology(NTNU)the financial support from Escuela Politécnica Nacional(EPN)through the project PIMI-15-03"Investigación y evaluación de sistemas innovadores de propulsión distribuida con ingestión de capa límite para mejorar la eficiencia propulsiva y térmica de vehículos aéreos no tripulados aplicados en los sectores:agrícola,medicina y vigilancia"
文摘Current installation costs of offshore wind turbines(OWTs) are high and profit margins in the offshore wind energy sector are low, it is thus necessary to develop installation methods that are more efficient and practical. This paper presents a numerical study(based on a global response analysis of marine operations) of a novel procedure for installing the tower and Rotor Nacelle Assemblies(RNAs) on bottom-fixed foundations of OWTs. The installation procedure is based on the inverted pendulum principle. A cargo barge is used to transport the OWT assembly in a horizontal position to the site, and a medium-size Heavy Lift Vessel(HLV) is then employed to lift and up-end the OWT assembly using a special upending frame. The main advantage of this novel procedure is that the need for a huge HLV(in terms of lifting height and capacity) is eliminated. This novel method requires that the cargo barge is in the leeward side of the HLV(which can be positioned with the best heading) during the entire installation. This is to benefit from shielding effects of the HLV on the motions of the cargo barge, so the foundations need to be installed with a specific heading based on wave direction statistics of the site and a typical installation season. Following a systematic approach based on numerical simulations of actual operations, potential critical installation activities, corresponding critical events, and limiting(response) parameters are identified. In addition, operational limits for some of the limiting parameters are established in terms of allowable limits of sea states. Following a preliminary assessment of these operational limits, the duration of the entire operation, the equipment used, and weather-and water depth-sensitivity, this novel procedure is demonstrated to be viable.
文摘针对原油转驳船(Cargo Transfer Vessel, CTV)主推进器设备尺寸大、质量大和安装难度大等问题,设置主推进器基座,用于对艉部结构与主推进器的连接安装。详细研究主推进器基座的设计、制造与安装技术。对主推进器基座进行合理的结构设计,确定有效的焊接工艺和安装流程,可确保基座的结构稳定性和制造与安装的精度。