期刊文献+
共找到2,276篇文章
< 1 2 114 >
每页显示 20 50 100
Dynamic Response Impact of Vehicle Braking on Simply Supported Beam Bridges with Corrugated Steel Webs Based on Vehicle-Bridge Coupled Vibration Analysis
1
作者 Yan Wang Siwen Li Na Wei 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第6期3467-3493,共27页
A novel approach for analyzing coupled vibrations between vehicles and bridges is presented,taking into account spatiotemporal effects and mechanical phenomena resulting fromvehicle braking.Efficient modeling and solu... A novel approach for analyzing coupled vibrations between vehicles and bridges is presented,taking into account spatiotemporal effects and mechanical phenomena resulting fromvehicle braking.Efficient modeling and solution of bridge vibrations induced by vehicle deceleration are realized using this method.The method’s validity and reliability are substantiated through numerical examples.A simply supported beam bridge with a corrugated steel web is taken as an example and the effects of parameters such as the initial vehicle speed,braking acceleration,braking location,and road surface roughness on the mid-span displacement and impact factor of the bridge are analyzed.The results show that vehicle braking significantly amplifies mid-span displacement and impact factor responses in comparison to uniform vehicular motion across the bridge.Notably,the influence of wheelto-bridge friction forces is of particular significance and cannot be overlooked.When the vehicle initiates braking near the middle of the span,both the mid-span displacement and impact factor of the bridge exhibit substantial increases,further escalating with higher braking acceleration.Under favorable road surface conditions,the midspan displacement and the impact factor during vehicle braking may exceed the design values stipulated by codes.It is important to note that road surface roughness exerts a more pronounced effect on the impact factor of the bridge in comparison to the effects of vehicle braking. 展开更多
关键词 corrugated steel web girder bridges simply supported beam bridges vehicle-bridge coupled vibration BRAKING impact factor
下载PDF
Process Monitoring and Terminal Verification of Cable-Stayed Bridges with Corrugated Steel Webs under Contruction
2
作者 Kexin Zhang Xinyuan Shen +1 位作者 Longsheng Bao He Liu 《Structural Durability & Health Monitoring》 EI 2023年第2期131-158,共28页
In this paper,the construction process of a cable-stayed bridge with corrugated steel webs was monitored.Moreover,the end performance of the bridge was verified by load test.Owing to the consideration of the bridge st... In this paper,the construction process of a cable-stayed bridge with corrugated steel webs was monitored.Moreover,the end performance of the bridge was verified by load test.Owing to the consideration of the bridge structure safety,it is necessary to monitor the main girder deflection,stress,construction error and safety state during construction.Furthermore,to verify whether the bridge can meet the design requirements,the static and dynamic load tests are carried out after the completion of the bridge.The results of construction monitoring show that the stress state of the structure during construction is basically consistent with the theoretical calculation and design requirements,and both meet the design and specification requirements.The final measured stress state of the structure is within the allowable range of the cable-stayed bridge,and the stress state of the structure is normal and meets the specification requirements.The results of load tests show that the measured deflection values of the mid-span section of the main girder are less than the theoretical calculation values.The maximum deflection of the girder is−20.90 mm,which is less than−22.00 mm of the theoretical value,indicating that the girder has sufficient structural stiffness.The maximum impact coefficient under dynamic load test is 1.08,which is greater than 1.05 of theoretical value,indicating that the impact effect of heavy-duty truck on this type of bridge is larger.This study can provide important reference value for construction and maintenance of similar corrugated steel web cable-stayed bridges. 展开更多
关键词 Cable-stayed bridge corrugated steel web construction monitoring static load test dynamic load test
下载PDF
Temperature Stress Analysis of Prestressed Concrete Box Girder with Corrugated Steel Webs 被引量:5
3
作者 单成林 刘文芳 《Transactions of Tianjin University》 EI CAS 2012年第2期97-103,共7页
To figure out the distribution of temperature gradient along the girder height of steel-concrete composite box girder, combined with the mechanical characteristics of prestressed concrete composed box girder with corr... To figure out the distribution of temperature gradient along the girder height of steel-concrete composite box girder, combined with the mechanical characteristics of prestressed concrete composed box girder with corrugated steel webs, the calculation formulas of cross-sectional temperature stress along the span in a simply-supported beam bridge with composite section were derived under the conditions of static equilibrium and deformation compatibility of the beam element. The methods of calculating the maximum temperature stress value were discussed when the connectors are assumed rigid or flexible. Theoretical and numerical results indicate that the method proposed shows better precision for the calculation of temperature self-stress in both the top and the bottom surfaces of the box girder. Moreover, the regularity of temperature stress distribution at different locations along the girder span is that the largest axial force of the top or the bottom plate of the box girder is located in the midspan and spreads decreasingly until zero at both supported ends, and that the greatest longitudinal shear density in steel-concrete interface appears at both supported ends and then reduces gradually to zero in the midspan. 展开更多
关键词 bridge engineering composite structure temperature effect corrugated steel web connector influence
下载PDF
Lateral-torsional buckling of box beam with corrugated steel webs 被引量:9
4
作者 FENG Yu-lin JIANG Li-zhong +1 位作者 ZHOU Wang-bao HAN Jian-ping 《Journal of Central South University》 SCIE EI CAS CSCD 2019年第7期1946-1957,共12页
Corrugated steel web is folded along the longitudinal direction and has the mechanical properties such as axial compression stiffness corrugation effect, shear modulus corrugation effect, similar to that of an accordi... Corrugated steel web is folded along the longitudinal direction and has the mechanical properties such as axial compression stiffness corrugation effect, shear modulus corrugation effect, similar to that of an accordion. In order to study the lateral-torsional buckling of box beams with corrugated steel webs (BBCSW) under the action of bending moment load, the neutral equilibrium equation of BBCSW under the action of bending moment load is derived through the stationary value theory of total potential energy and further, along with taking Kollbrunner-Hajdin correction method and the mechanical properties of the corrugated web into consideration. The analytical calculation formula of lateral-torsional buckling critical bending moment of BBCSW is then obtained. The lateral-torsional buckling critical bending moment of 96 BBCSW test specimens with different geometry dimensions are then calculated using both the analytical calculation method and ANSYS finite element method. The results show that the analytical calculation results agree well with the numerical calculation results using ANSYS, thus proving the accuracy of the analytical calculation method and model simplification hypothesis proposed in this paper. Also, compared with the box beams with flat steel webs (BBFSW) with the same geometry dimensions as BBCSW, within the common range of web space-depth ratio and web span-depth ratio, BBCSW’s lateral-torsional buckling critical bending moment is larger than that of BBFSW. Moreover, the advantages of BBCSW’s stability are even more significant with the increase of web space-depth ratio and web depth-thickness ratio. 展开更多
关键词 box beams with corrugated steel webs lateral-torsional buckling analytical solution accordion effect Kollbrunner-Hajdin method
下载PDF
Mechanical Behavior of a Partially Encased Composite Girder with Corrugated Steel Web: Interaction of Shear and Bending 被引量:10
5
作者 Jun He Sihao Wang +2 位作者 Yuqing Liu Zhan Lyu Chuanxi Li 《Engineering》 SCIE EI 2017年第6期806-816,共11页
The synergistic use of partially encased concrete and composite girders with corrugated steel webs (CGCSWs) has been proposed to avoid the buckling of corrugated steel webs and compression steel flanges under large ... The synergistic use of partially encased concrete and composite girders with corrugated steel webs (CGCSWs) has been proposed to avoid the buckling of corrugated steel webs and compression steel flanges under large combined shear force and bending moment in the hogging area. First, model tests were carried out on two specimens with different shear spans to investigate the mechanical behavior, including the load-carrying capacity, failure modes, flexural and shear stress distribution, and development of concrete cracking. Experimental results show that the interaction of shear force and bending moment causes the failure of specimens. The bending-to-shear ratio does not affect the shear stiffness of a composite girder in the elastic stage when concrete cracking does not exist, but significantly influ- ences the shear stiffness after concrete cracking. In addition, composite sections in the elastic stage sat- isfy the assumption of the plane section under combined shear force and bending moment. However, after concrete cracking in the tension field, the normal stresses of a corrugated web in the tension area become small due to the "accordion effect," with almost zero stress at the flat panels but recognizable stress at the inclined panels. Second, three-dimensional finite-element (FE) models considering material and geometric nonlinearity were built and validated by experiments, and parametric analyses were conducted on composite girders with different lengths and heights to determine their load-carrying capacity when subjected to combined loads. Finally, an interaction formula with respect to shear and flexural strength is offered on the basis of experimental and numerical results in order to evaluate the load- carrying capacity of such composite structures, thereby providing a reference for the design of partially encased composite girders with corrugated steel webs (PECGCSWs) under combined flexural and shear loads. 展开更多
关键词 Encased concrete Composite girder corrugated steel web Interaction of shear and bending
下载PDF
Study in the design and manufacture process of the elastic cable anchor box in steel box girder of Taizhou Bridge 被引量:1
6
作者 Gu Bifeng Chen Ce Ding Lei 《Engineering Sciences》 EI 2011年第2期64-68,共5页
Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety c... Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques. 展开更多
关键词 Taizhou bridge steel box girder the elastic cables DESIGN manufacture techniques
下载PDF
The study of temperature effects on steel box girder for Taizhou Bridge 被引量:1
7
作者 Miao Changqing Feng Zhaoxiang +1 位作者 Wang Yichun Shi Changhua 《Engineering Sciences》 EI 2012年第3期81-87,共7页
Using the temperature gradient which was proposed by continuously measuring flat steel box girder of Runyang Bridge, temperature effects of flat steel box girder were studied for Taizhou Bridge. With three temperature... Using the temperature gradient which was proposed by continuously measuring flat steel box girder of Runyang Bridge, temperature effects of flat steel box girder were studied for Taizhou Bridge. With three temperature gradient models (JTG D60--2004 specification, BS5400 specification and the temperature gradient which was proposed in this paper), the stress of control sections was calculated by finite element program ANSYS. The calculated result indicated that the temperature gradient that was put forward in JTG D60-2004 specification and BS5400 specification for calculating the stress of fiat steel box girder was not suitable to apply to fiat steel box girder. The temperature gradient on flat steel box girder which was proposed in this paper was reasonable. 展开更多
关键词 suspension bridge flat steel box girder temperature gradient STRESS
下载PDF
Stress and noises of steel box girders in Sutong Bridge
8
作者 Xue Tao Chen Zhijian Dong Xuewu 《Engineering Sciences》 EI 2008年第4期53-59,共7页
Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in th... Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in the fluctuant and complex state and many meteorological factors,such as sunshine radiation,temperature and wind,have important influence on the change of stress of the steel box girders. According to the real-time weather data,the stress data after the process of wavelet denoising from representative measuring points in different weather conditions is picked to establish the stress response brought by meteorological factors with Layered Separation method,thereby basically eliminating the influence of meteorological factors on the stress of main girders,so that accurate and reliable stress data can be got for steel box girders adjustment and cable-tensioned construction control. 展开更多
关键词 Sutong bridge cable-stayed bridge steel box girder wavelet denoising meteorological factor Layered Separation method
下载PDF
Research on overall assembling and welding process of steel box girder tuyere blocks of Taizhou Bridge
9
作者 Yan Shiguang Li Hongtao Wang Chao 《Engineering Sciences》 EI 2012年第3期21-25,共5页
This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding... This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding stress release in tuyere block assembling and welding without increasing the number of turns of the blocks and overhead welding, thus avoiding possible structural deformation due to excessive accumulation of internal welding stress, greatly reducing the repeated deformation and correction work during assembling and welding, and ensuring the weld seam quality and overall dimensions of tuvere blocks of Taizhou Bridze. 展开更多
关键词 Taizhou bridge steel box girder TUYERE PROCESS
下载PDF
Design of steel box girder for Taizhou Yangtze River Highway Bridge
10
作者 Ding Lei Shan Hongwei Zhou Qing Zheng Benhui 《Engineering Sciences》 EI 2011年第2期57-63,共7页
Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technica... Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technically mature besides beautiful appearance. Straight web plates of the steel box girder in longitudinal direction are proposed in order to ensure the integrity of the steel box girder, and to keep the stress of the steel box girder continuous in the middle pylon, as well as to reduce the gradient of the middle pylon columns. The cross section of the box girder has one box with three cells. Solid-web diaphragm plate with good integrity and high torsional stiffness is adopted. The lifting lugs are utilized in the anchors of suspender cable. In this paper, selection of the cross section of the steel box girder, the general structure design, local structure design and main structure calculation results of Taizhou Yangtze River Bridge are introduced emphatically. 展开更多
关键词 Taizhou Yangtze River Highway bridge three-pylon suspension bridge steel box girder DESIGN
下载PDF
Weakening effect of vertical prestress ducts on web sections in prestressed concrete box girder bridges
11
作者 Shen Mingyan Zhong Xingu Yin Xuwen Shu Xiaojuan 《Engineering Sciences》 EI 2010年第2期73-79,共7页
Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box ... Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box girder was carried out. The test result shows that in the condition without grouting into the ducts,the cracking load is evidently lower than that with full grouting,and stirrup stress and principal tension stress at the surface of concrete will increase obviously. Meanwhile,the finite element analysis has been done to the test beams. The research is consistent with the analysis of finite element. The research tells that strengthening the detection and management for the vertical prestress grouting quality have an important meaning to prevent cracking of the prestressed concrete box girder bridge and provide one theoretical and testing basis for analyzing the cracking reason of such bridges. 展开更多
关键词 concrete box girder bridge vertical prestress duct weakening of web section experimental study finite element analysis
下载PDF
Estimating extreme temperature differences in steel box girder using long-term measurement data 被引量:5
12
作者 丁幼亮 王高新 《Journal of Central South University》 SCIE EI CAS 2013年第9期2537-2545,共9页
The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the ... The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the Runyang Cable-stayed Bridge,the daily variations as well as seasonal ones of measured temperature differences in the box girder cross-section area were summarized.The probability distribution models of temperature differences were further established and the extreme temperature differences were estimated with a return period of 100 years.Finally,the temperature difference models in cross-section area were proposed for bridge thermal design.The results show that horizontal temperature differences in top plate and vertical temperature differences between top plate and bottom plate are considerable.All the positive and negative temperature differences can be described by the weighted sum of two Weibull distributions.The maximum positive and negative horizontal temperature differences in top plate are 10.30 ℃ and -13.80 ℃,respectively.And the maximum positive and negative vertical temperature differences between top plate and bottom plate are 17.30 ℃ and-3.70 ℃,respectively.For bridge thermal design,there are two vertical temperature difference models between top plate and bottom plate,and six horizontal temperature difference models in top plate. 展开更多
关键词 structural health monitoring cable-stayed bridge steel box girder temperature difference extreme value analysis
下载PDF
Study on the Mechanical Properties of Irregular Curved Steel Box Girder for City Viaduct
13
作者 XijunYin 《International Journal of Technology Management》 2014年第1期46-48,共3页
This paper deeply analyses the influence of different local tectonic on stress performance of spatial curved steel box Girder Bridge, using the finite element analysis software to establish space finite element model ... This paper deeply analyses the influence of different local tectonic on stress performance of spatial curved steel box Girder Bridge, using the finite element analysis software to establish space finite element model of this bridge, calculation and analysis were made on the bridge of the strength, stiffness. It has certain reference value for guiding engineering design, have a good foundation for the mechanical properties and stability of linear and nonlinear further study of curved steel box girder. 展开更多
关键词 elastic buckling analysis U rib bridge deck curved steel box girder
下载PDF
南京仙新路长江大桥主桥结构设计
14
作者 肖海珠 高宗余 +2 位作者 陆勤丰 唐贺强 于俊杰 《桥梁建设》 EI CSCD 北大核心 2024年第2期1-7,共7页
南京仙新路长江大桥主桥为跨径1760 m的单跨钢箱梁悬索桥,主缆垂跨比1/9,边跨跨径580 m,边中跨比0.33。该桥上、下游各设1根主缆,单根主缆由169股127∅5.4 mm镀锌铝高强钢丝索股组成,采用PPWS法施工,钢丝标准抗拉强度2100 MPa。吊索与索... 南京仙新路长江大桥主桥为跨径1760 m的单跨钢箱梁悬索桥,主缆垂跨比1/9,边跨跨径580 m,边中跨比0.33。该桥上、下游各设1根主缆,单根主缆由169股127∅5.4 mm镀锌铝高强钢丝索股组成,采用PPWS法施工,钢丝标准抗拉强度2100 MPa。吊索与索夹采用销接式结构,跨中设置柔性中央扣索,短吊索设置关节轴承。主索鞍采用宽鞍槽单纵肋铸焊结合构造,散索鞍采用底座式全铸结构。加劲梁采用扁平流线型封闭整体钢箱梁,总宽31.5 m,梁高4 m,顶板与U肋之间采用双面埋弧全熔透焊接。桥塔采用门形混凝土结构,总高277.3 m,其上横梁为预应力混凝土结构,外包N字造型钢结构;桥塔基础采用直径2.8 m钻孔灌注桩。南锚碇采用外径65 m圆形地下连续墙基础;北锚碇采用沉井基础,平面尺寸70 m×50 m,高50 m。对结构进行静力分析及抗风性能理论和试验研究,结果表明:结构强度、刚度均满足规范要求;在加劲梁上设置0.67 m高中央稳定板、两侧风嘴处设置1 m宽水平稳定板后,大桥的颤振、涡振等抗风性能均满足要求,且具备一定的阻尼储备。 展开更多
关键词 悬索桥 高强钢丝 索鞍 钢箱梁 地下连续墙 锚碇 抗风性能 结构设计
下载PDF
公铁合建钢混板-桁斜拉桥悬挑式钢锚箱受力特性及结构优化
15
作者 施洲 周勇聪 +3 位作者 江峰 刘振标 夏正春 印涛 《中国铁道科学》 EI CAS CSCD 北大核心 2024年第3期50-60,共11页
为研究大跨度公铁合建钢混板-桁斜拉桥主梁悬挑式索梁钢锚箱结构的受力特性及结构优化,以主跨808 m的洪奇沥特大桥钢锚箱为背景,采用仿真分析方法,研究钢锚箱3个设计方案主要板件应力、焊缝应力以及推荐方案锚箱节点的传力特性和锚箱参... 为研究大跨度公铁合建钢混板-桁斜拉桥主梁悬挑式索梁钢锚箱结构的受力特性及结构优化,以主跨808 m的洪奇沥特大桥钢锚箱为背景,采用仿真分析方法,研究钢锚箱3个设计方案主要板件应力、焊缝应力以及推荐方案锚箱节点的传力特性和锚箱参数对钢锚箱受力的影响。结果表明:锚箱尺寸较大、顶底板加肋方案的主要板件应力最大为300 MPa,小于其他2种方案,且6条焊缝的最大应力和应力不均匀系数较优,因此确定该方案为最终设计方案;索力首先由锚垫板直接向钢锚箱顶、底板和内外腹板较为均匀传递,最终边弦杆底板、内腹板和外腹板分别承担了22.2%,46.4%和31.4%的索力;节点处副桁斜杆、近桥塔侧和远桥塔侧边弦杆、混凝土桥面、节点横梁分别传递约66.71%,9.72%,9.32%,9.68%和4.56%的斜拉索竖向分力;板件应力随顶底板厚度增加而减小,顶底板深入边弦杆长度增加可以降低底板-内腹板焊缝峰值应力,顶底板间距减小可降低内外腹板和顶底板与锚垫板接触区域应力;顶底板厚44 mm、锚箱顶底板深入边弦杆长度1800 mm、顶底板间距660 mm时较为合理。 展开更多
关键词 公铁合建斜拉桥 索梁钢锚箱 受力特性 传力特性 结构优化
下载PDF
简支波形腹板钢箱组合截面与传统截面箱梁桥抗震性能对比分析
16
作者 赫中营 高嘉 +1 位作者 孙鹏辉 王根会 《工程抗震与加固改造》 北大核心 2024年第1期83-92,82,共11页
为研究波形腹板钢箱-混凝土组合梁桥(CW-SBCCGB)与传统箱梁桥抗震性能的异同,基于截面等效原理,根据某实际工程CW-SBCCGB的单箱截面,等效出波形腹板混凝土箱梁桥(CW-CBGB)和混凝土箱梁桥(CBGB)的单箱截面,再结合动力分析理论和ABAQUS有... 为研究波形腹板钢箱-混凝土组合梁桥(CW-SBCCGB)与传统箱梁桥抗震性能的异同,基于截面等效原理,根据某实际工程CW-SBCCGB的单箱截面,等效出波形腹板混凝土箱梁桥(CW-CBGB)和混凝土箱梁桥(CBGB)的单箱截面,再结合动力分析理论和ABAQUS有限元模型对比分析3种截面简支梁桥动力特性和抗震性能的不同。结果表明:3种截面简支梁桥前五阶振型不变,CW-CBGB和CBGB前三阶频率相比于CW-SBCCGB有所下降,但相差不超过1Hz,第四阶及以后频率差异逐渐变大;剪滞效应对CW-SBCCGB和CW-CBGB动力特性影响较大,对CBGB影响较小;在纵桥向+竖桥向和横桥向+竖桥向地震作用下,CW-SBCCGB和CBGB的墩顶位移和跨中位移均大于CW-CBGB结构,CW-SBCCGB主梁跨中截面剪力最小,CW-CBGB跨中截面弯矩最小,说明CW-SBCCGB和CW-CBGB的抗震性能均优于CBGB的抗震性能。 展开更多
关键词 抗震性能 波形腹板钢箱-混凝土组合梁桥 波形腹板混凝土箱梁桥 混凝土箱梁桥 截面等效
下载PDF
波形钢腹板梁焊接残余应力分布及试验验证
17
作者 冀伟 刘勇 《西南交通大学学报》 EI CSCD 北大核心 2024年第2期289-297,共9页
为研究波形钢腹板梁焊接残余应力的分布规律,通过有限元软件建立其三维热弹塑性模型,利用热-力耦合分析技术对其焊接温度场和应力场进行有限元数值仿真,采用双椭球体热源和修改单元材料属性的方法实现能量输入和焊缝填充,并将模拟计算... 为研究波形钢腹板梁焊接残余应力的分布规律,通过有限元软件建立其三维热弹塑性模型,利用热-力耦合分析技术对其焊接温度场和应力场进行有限元数值仿真,采用双椭球体热源和修改单元材料属性的方法实现能量输入和焊缝填充,并将模拟计算结果与实测值进行对比分析.结果表明:有限元预测的波形钢腹板梁残余应力分布与实测结果具有相同趋势,在波形钢腹板梁焊缝的弯折角处,残余应力发生一定幅度的连续应力波动;底板和腹板的残余应力峰值均出现在焊缝中心区域,其值分别为材料屈服强度的1.30倍和1.26倍;底板纵向残余拉应力在焊缝中心线两侧78 mm范围内急速下降后缓慢过渡为压应力,在底板较窄一侧压应力线性增大,最大值约为材料屈服强度的0.61倍;在底板较宽一侧压应力线性减小,并在边缘处转化为拉应力;焊接速度对残余应力分布扰动不大,而对残余应力峰值影响较显著;当焊接速度从150 mm/min增加至250 mm/min时,横向和纵向的残余应力最大值分别增加了27.11%和5.88%. 展开更多
关键词 波形钢腹板梁 焊接残余应力 热力学 数值模拟 焊接速度
下载PDF
大跨度铁路桥附属构件对不同宽高比矩形断面涡振性能的影响
18
作者 黄林 董佳慧 +2 位作者 王骑 廖海黎 李志国 《中国铁道科学》 EI CAS CSCD 北大核心 2024年第2期81-89,共9页
在已建成的大跨度鳊鱼洲长江大桥原设计宽高比为6.7∶1的四线铁路桥矩形箱型主梁断面的基础上,通过调整断面宽高比,设计宽高比为4∶1的二线铁路和宽高比为9∶1的六线铁路桥矩形箱梁断面。通过节段模型风洞试验,在0°,±3°... 在已建成的大跨度鳊鱼洲长江大桥原设计宽高比为6.7∶1的四线铁路桥矩形箱型主梁断面的基础上,通过调整断面宽高比,设计宽高比为4∶1的二线铁路和宽高比为9∶1的六线铁路桥矩形箱梁断面。通过节段模型风洞试验,在0°,±3°和±5°风攻角的均匀来流下,对以上3种常用二线、四线和六线铁路桥矩形箱梁断面与对应相同宽高比纯矩形断面之间的涡振特性关系,以及铁路桥附属构件对不同宽高比矩形断面涡振性能的影响进行研究。结果表明:在宽高比分别为4∶1和6.7∶1的矩形断面上布置铁路桥附属构件能增大断面在负风攻角下的涡振振幅,在-5°风攻角下竖向涡振振幅增大率高达277.5%,但对正风攻角下的涡振响应起到一定的抑制作用,而在宽高比为9∶1的矩形断面布置六线铁路桥附属构件则能明显增大该断面在各风攻角下的涡振振幅,其扭转涡振振幅增大率均在48.3%以上;铁路桥附属构件对矩形断面涡振性能的降低作用随着断面宽高比的增大而提升,针对气动外形较钝的二线和四线铁路桥箱梁,可参考相似宽高比矩形断面涡振特性,并重点考察箱梁在负风攻角下的涡振响应,而针对宽高比较大的六线铁路桥箱梁,由于附属构件影响较大,参考相似宽高比矩形断面涡振特性的意义较小,均应详细研究其在各风攻角下的涡振性能。 展开更多
关键词 大跨度铁路桥 钢箱梁 节段模型 宽高比 矩形断面 附属构件 涡振性能 风洞试验
下载PDF
武汉青山长江公路大桥宽幅钢箱梁悬臂拼装横向线形匹配技术
19
作者 张晶 赵全成 戚原 《桥梁建设》 EI CSCD 北大核心 2024年第2期139-144,共6页
武汉青山长江公路大桥主桥为主跨938 m的双塔双索面全飘浮体系斜拉桥,主跨整体式钢箱梁高4.5 m、全宽48 m,采用500 t架梁吊机分节段悬臂拼装架设。钢箱梁悬臂拼装时,架梁吊机站位节段、待架节段由于荷载及约束不同,横截面变形呈现出不... 武汉青山长江公路大桥主桥为主跨938 m的双塔双索面全飘浮体系斜拉桥,主跨整体式钢箱梁高4.5 m、全宽48 m,采用500 t架梁吊机分节段悬臂拼装架设。钢箱梁悬臂拼装时,架梁吊机站位节段、待架节段由于荷载及约束不同,横截面变形呈现出不同的趋势,线形匹配难度大。为解决该问题,主跨钢箱梁悬臂拼装时选择上、下游分体式架梁吊机,减少架梁吊机自重;经比选选择横桥向27.7 m间距的架梁吊机站位,减小了架梁吊机荷载对横向线形匹配的影响;通过设置顶压装置(由顶压牛腿、支承底座组成),在架梁吊机站位节段、待架节段钢箱梁边腹板处施加1500 kN顶压力,配合少量马板,一次加载完成对接口竖向变形匹配调整。施工后,钢箱梁横向线形匹配精度均满足要求。 展开更多
关键词 斜拉桥 宽幅钢箱梁 悬臂拼装 分体式架梁吊机 吊机站位 顶压牛腿 匹配技术
下载PDF
波形腹板钢箱-混凝土组合梁横向内力计算与分析
20
作者 冀伟 余壮果 罗奎 《铁道学报》 EI CAS CSCD 北大核心 2024年第8期161-170,共10页
为精确分析波形腹板钢箱-混凝土组合梁(SBCCGCW)的横向内力,考虑波形钢腹板特性和箱梁的畸变效应,利用框架分析法推导SBCCGCW的横向弯矩计算公式;通过两座实桥横向弯矩的有限元和实测结果对所提公式的正确性进行验证;对SBCCGCW横向内力... 为精确分析波形腹板钢箱-混凝土组合梁(SBCCGCW)的横向内力,考虑波形钢腹板特性和箱梁的畸变效应,利用框架分析法推导SBCCGCW的横向弯矩计算公式;通过两座实桥横向弯矩的有限元和实测结果对所提公式的正确性进行验证;对SBCCGCW横向内力的影响因素进行研究,并根据有限元分析结果提出SBCCGCW横向内力的简化计算公式。结果表明:利用所提公式获取的横向弯矩值与有限元结果和实测结果吻合较好,误差在10%以内;横隔板会大幅度减少荷载作用点处的横向弯矩;宽高比、混凝土顶板厚度、荷载作用位置对混凝土顶板横向弯矩的影响较大,钢底板厚度变化对混凝土顶板横向弯矩的影响较小。研究成果可为SBCCGCW的横向内力计算与分析提供参考。 展开更多
关键词 桥梁工程 组合箱梁 横向内力 框架分析法 波形钢腹板 参数分析
下载PDF
上一页 1 2 114 下一页 到第
使用帮助 返回顶部