期刊文献+
共找到3,051篇文章
< 1 2 153 >
每页显示 20 50 100
Fatigue Crack Propagation Law of Corroded Steel Box Girders in Long Span Bridges
1
作者 Ying Wang Longxiao Chao +1 位作者 Jun Chen Songbai Jiang 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第7期201-227,共27页
In order to investigate the fatigue performance of orthotropic anisotropic steel bridge decks,this study realizes the simulation of the welding process through elastic-plastic finite element theory,thermal-structural ... In order to investigate the fatigue performance of orthotropic anisotropic steel bridge decks,this study realizes the simulation of the welding process through elastic-plastic finite element theory,thermal-structural sequential coupling,and the birth-death element method.The simulated welding residual stresses are introduced into the multiscale finite element model of the bridge as the initial stress.Furthermore,the study explores the impact of residual stress on crack propagation in the fatigue-vulnerable components of the corroded steel box girder.The results indicate that fatigue cracks at the weld toe of the top deck,the weld root of the top deck,and the opening of the transverse diaphragm will not propagate under the action of a standard vehicle load.However,the inclusion of residual stress leads to the propagation of these cracks.When considering residual stress,the fatigue crack propagation paths at the weld toe of the transverse diaphragm and the U-rib weld toe align with those observed in actual bridges.In the absence of residual stress,the cracks at the toe of the transverse diaphragm with a 15%mass loss rate are categorized as type I cracks.Conversely,when residual stress is considered,these cracks become I-II composite cracks.Residual stress significantly alters the cumulative energy release rate of the three fracturemodes.Therefore,incorporating the influence of residual stress is essential when assessing the fatigue performance of corroded steel box girders in long-span bridges. 展开更多
关键词 Residual stress crack propagation corroded steel box girder cumulative energy release rate
下载PDF
Estimating extreme temperature differences in steel box girder using long-term measurement data 被引量:5
2
作者 丁幼亮 王高新 《Journal of Central South University》 SCIE EI CAS 2013年第9期2537-2545,共9页
The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the ... The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the Runyang Cable-stayed Bridge,the daily variations as well as seasonal ones of measured temperature differences in the box girder cross-section area were summarized.The probability distribution models of temperature differences were further established and the extreme temperature differences were estimated with a return period of 100 years.Finally,the temperature difference models in cross-section area were proposed for bridge thermal design.The results show that horizontal temperature differences in top plate and vertical temperature differences between top plate and bottom plate are considerable.All the positive and negative temperature differences can be described by the weighted sum of two Weibull distributions.The maximum positive and negative horizontal temperature differences in top plate are 10.30 ℃ and -13.80 ℃,respectively.And the maximum positive and negative vertical temperature differences between top plate and bottom plate are 17.30 ℃ and-3.70 ℃,respectively.For bridge thermal design,there are two vertical temperature difference models between top plate and bottom plate,and six horizontal temperature difference models in top plate. 展开更多
关键词 structural health monitoring cable-stayed bridge steel box girder temperature difference extreme value analysis
下载PDF
Fatigue Performance of Orthotropic Steel Decks in Super-Wide Steel Box Girder Considering Transverse Distribution of Vehicle Load 被引量:2
3
作者 Xudong Wang Changqing Miao +1 位作者 Mao Yang Youliang Ding 《Structural Durability & Health Monitoring》 EI 2021年第4期299-316,共18页
This study presents an investigation on the fatigue analysis of four types of details on orthotropic steel decks(OSDs)for a cable-stayed super-wide steel box girder bridge based on finite-element analysis(FEA)with veh... This study presents an investigation on the fatigue analysis of four types of details on orthotropic steel decks(OSDs)for a cable-stayed super-wide steel box girder bridge based on finite-element analysis(FEA)with vehicle transverse distribution model(VTDM).A high-fidelity 3D FE model verified by the static load test is established to satisfy the fatigue analysis accuracy.The stress behavior of super-wide steel box girders under the vehicle load at different lane locations is investigated.Then,considering the effect of VTDM,the fatigue life analysis of four typical details is performed using the Miner cumulative damage rule.The results show that the vehicle transverse location has a great influence on the stress behavior of details with sharp influence surface,and the stress ranges in the outermost lane are larger than those in other lanes,indicating that the details of OSD in the outermost lane are prone to fatigue.The fatigue life analysis indicates that the diaphragm cutout is more prone to fatigue than other details,which should be carefully treated in bridge maintenance. 展开更多
关键词 Orthotropic steel deck steel box girder fatigue life vehicle transverse distribution model finite element analysis
下载PDF
Fatigue Performance Analysis and Evaluation for Steel Box Girder Based on Structural Health Monitoring System 被引量:1
4
作者 Meiling Zhuang Changqing Miao Rongfeng Chen 《Structural Durability & Health Monitoring》 EI 2020年第1期51-79,共29页
Taizhou Yangtze River Bridge as a long-span suspension bridge,the finite element model(FEM)of it is established using the ANSYS Software.The beam4 element is used to simulate the main beam to establish the“spine beam... Taizhou Yangtze River Bridge as a long-span suspension bridge,the finite element model(FEM)of it is established using the ANSYS Software.The beam4 element is used to simulate the main beam to establish the“spine beam”model of the Taizhou Yangtze River Bridge.The calculated low-order vibration mode frequency of the FEM is in good agreement with the completion test results.The model can simulate the overall dynamic response of the bridge.Based on the vehicle load survey,the Monte Carlo method is applied to simulate the traffic load flow.Then the overall dynamic response analysis of FEM is car-ried out.Taking the bending moment of the main beam as the control index,the fatigue sensitive section in the steel box girder of FEM is analyzed.Based on the strain time history data of steel box girder recorded by the structural health mon-itoring system(SHM),the true stress response of steel box girder under vehicle load is extracted.Taking the cumulative fatigue damage increment as the evalua-tion index,the fati gue performance evaluation of the steel box girders is con-ducted based on the collected health monitoring data.The fatigue effect of the beam section near the steel tower,especially the first section of the middle tower,is the key section of the fatigue analysis by health morning system,which is con-sistent with the calculation results of FEM. 展开更多
关键词 steel box girder FATIGUE stress response Monte Carlo method structural health monitoring system
下载PDF
Study in the design and manufacture process of the elastic cable anchor box in steel box girder of Taizhou Bridge 被引量:1
5
作者 Gu Bifeng Chen Ce Ding Lei 《Engineering Sciences》 EI 2011年第2期64-68,共5页
Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety c... Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques. 展开更多
关键词 Taizhou Bridge steel box girder the elastic cables DESIGN manufacture techniques
下载PDF
The study of temperature effects on steel box girder for Taizhou Bridge 被引量:1
6
作者 Miao Changqing Feng Zhaoxiang +1 位作者 Wang Yichun Shi Changhua 《Engineering Sciences》 EI 2012年第3期81-87,共7页
Using the temperature gradient which was proposed by continuously measuring flat steel box girder of Runyang Bridge, temperature effects of flat steel box girder were studied for Taizhou Bridge. With three temperature... Using the temperature gradient which was proposed by continuously measuring flat steel box girder of Runyang Bridge, temperature effects of flat steel box girder were studied for Taizhou Bridge. With three temperature gradient models (JTG D60--2004 specification, BS5400 specification and the temperature gradient which was proposed in this paper), the stress of control sections was calculated by finite element program ANSYS. The calculated result indicated that the temperature gradient that was put forward in JTG D60-2004 specification and BS5400 specification for calculating the stress of fiat steel box girder was not suitable to apply to fiat steel box girder. The temperature gradient on flat steel box girder which was proposed in this paper was reasonable. 展开更多
关键词 suspension bridge flat steel box girder temperature gradient STRESS
下载PDF
GMA material design and construction quality control for asphalt pavement of steel box girder: Case study of the Hong Kong–Zhuhai–Macao Bridge 被引量:2
7
作者 Xiaoning Zhang 《Journal of Road Engineering》 2021年第1期63-72,共10页
To improve the quality of the Hong Kong–Zhuhai–Macao Bridge paving project,a new paving layer material,Guss-mastic asphalt(GMA),was proposed in this paper by combining the advantages of two types of cast asphalt mix... To improve the quality of the Hong Kong–Zhuhai–Macao Bridge paving project,a new paving layer material,Guss-mastic asphalt(GMA),was proposed in this paper by combining the advantages of two types of cast asphalt mixtures:mastic asphalt(MA)and Guss asphalt(GA).Based on the characteristics of GMA,to simulate its actual production process,this study developed a small-simulated cooker mixing equipment.Moreover,the flow degree,60C dynamic stability,and impact toughness were proposed to be used to evaluate the construction and ease,high temperature stability,and fatigue resistance of GMA cast asphalt mixtures,respectively.Moreover,the quality control standards for GMA paving materials by indoor tests,field trial mix GMA material performance tests,and accelerated loading tests were finalized.The study showed that the developed simulated cooker yielded consistent mixing results in the same working environment as the engineering cooker device.Increasing the coarse aggregate incorporation rate,coarsening the mastic epure(ME)gradation composition,and using a smaller oil to stone ratio can reduce the flowability of the GMA materials to varying degrees.The four-point bending fatigue life and impact toughness of the different GMA materials are correlated well.A mobility of<20 s,60C dynamic stability of 400–800 times/mm,15C impact toughness of400 N⋅mm,and cooker car mixing temperature control standard of 210C–230C form an appropriate control index system for the design and production of GMA cast asphalt mixtures.Simultaneously,accelerated loading tests verified the accuracy and reliability of the quality control index system that has been used in the GMA paving project of the Hong Kong–Zhuhai–Macao Bridge deck and has achieved good application results. 展开更多
关键词 Asphalt pavement Material design GMA steel box girder Construction quality control
下载PDF
Research on overall assembling and welding process of steel box girder tuyere blocks of Taizhou Bridge
8
作者 Yan Shiguang Li Hongtao Wang Chao 《Engineering Sciences》 EI 2012年第3期21-25,共5页
This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding... This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding stress release in tuyere block assembling and welding without increasing the number of turns of the blocks and overhead welding, thus avoiding possible structural deformation due to excessive accumulation of internal welding stress, greatly reducing the repeated deformation and correction work during assembling and welding, and ensuring the weld seam quality and overall dimensions of tuvere blocks of Taizhou Bridze. 展开更多
关键词 Taizhou Bridge steel box girder TUYERE PROCESS
下载PDF
Stress and noises of steel box girders in Sutong Bridge
9
作者 Xue Tao Chen Zhijian Dong Xuewu 《Engineering Sciences》 EI 2008年第4期53-59,共7页
Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in th... Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in the fluctuant and complex state and many meteorological factors,such as sunshine radiation,temperature and wind,have important influence on the change of stress of the steel box girders. According to the real-time weather data,the stress data after the process of wavelet denoising from representative measuring points in different weather conditions is picked to establish the stress response brought by meteorological factors with Layered Separation method,thereby basically eliminating the influence of meteorological factors on the stress of main girders,so that accurate and reliable stress data can be got for steel box girders adjustment and cable-tensioned construction control. 展开更多
关键词 Sutong Bridge cable-stayed bridge steel box girder wavelet denoising meteorological factor Layered Separation method
下载PDF
Design of steel box girder for Taizhou Yangtze River Highway Bridge
10
作者 Ding Lei Shan Hongwei Zhou Qing Zheng Benhui 《Engineering Sciences》 EI 2011年第2期57-63,共7页
Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technica... Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technically mature besides beautiful appearance. Straight web plates of the steel box girder in longitudinal direction are proposed in order to ensure the integrity of the steel box girder, and to keep the stress of the steel box girder continuous in the middle pylon, as well as to reduce the gradient of the middle pylon columns. The cross section of the box girder has one box with three cells. Solid-web diaphragm plate with good integrity and high torsional stiffness is adopted. The lifting lugs are utilized in the anchors of suspender cable. In this paper, selection of the cross section of the steel box girder, the general structure design, local structure design and main structure calculation results of Taizhou Yangtze River Bridge are introduced emphatically. 展开更多
关键词 Taizhou Yangtze River Highway Bridge three-pylon suspension bridge steel box girder DESIGN
下载PDF
Research on Construction Process of Steel Box Girder Bridge and Its Stress Analysis
11
作者 ChengKANG 《International Journal of Technology Management》 2015年第3期104-106,共3页
The paper introduce the construction method of large segment hosting and its difficulty, and drawing up corresponding liner and stress monitoring plan. The paper gives the calculation method of shear area for such a b... The paper introduce the construction method of large segment hosting and its difficulty, and drawing up corresponding liner and stress monitoring plan. The paper gives the calculation method of shear area for such a big cantilever thin-walled steel box girder section, namely the shear coefficient computation theory of Professor Hu Haichang, and the use of this shear area perfect beam element model, structure model and the experiment prove that the shell model is more consistent, given a certain reference for similar section project. 展开更多
关键词 Construction control Long-span steel box continuous girder Large segment hosting
下载PDF
Study on the Mechanical Properties of Irregular Curved Steel Box Girder for City Viaduct
12
作者 XijunYin 《International Journal of Technology Management》 2014年第1期46-48,共3页
This paper deeply analyses the influence of different local tectonic on stress performance of spatial curved steel box Girder Bridge, using the finite element analysis software to establish space finite element model ... This paper deeply analyses the influence of different local tectonic on stress performance of spatial curved steel box Girder Bridge, using the finite element analysis software to establish space finite element model of this bridge, calculation and analysis were made on the bridge of the strength, stiffness. It has certain reference value for guiding engineering design, have a good foundation for the mechanical properties and stability of linear and nonlinear further study of curved steel box girder. 展开更多
关键词 elastic buckling analysis U rib bridge deck curved steel box girder
下载PDF
三星堆古蜀文化遗址博物馆大型螺旋坡道结构设计与分析 被引量:1
13
作者 杨文 赖程钢 +4 位作者 刘晓舟 龙卫国 肖克艰 向新岸 文见 《建筑结构》 北大核心 2024年第12期1-6,共6页
三星堆古蜀文化遗址博物馆中庭的螺旋坡道采用钢箱梁结构体系,最大半径28.7m,水平投影长度118.5m。介绍了大型螺旋坡道结构体系选型和边界条件的对比过程,采用通用计算软件MIDAS Gen建立多尺度整体模型考虑螺旋坡道和主体结构的相互作用... 三星堆古蜀文化遗址博物馆中庭的螺旋坡道采用钢箱梁结构体系,最大半径28.7m,水平投影长度118.5m。介绍了大型螺旋坡道结构体系选型和边界条件的对比过程,采用通用计算软件MIDAS Gen建立多尺度整体模型考虑螺旋坡道和主体结构的相互作用,通过静力分析和反应谱分析考察螺旋坡道在不同荷载作用下的承载能力和变形,并采用有限元软件ANSYS建立分析模型进行连续倒塌分析。结果表明,螺旋坡道采用钢箱梁结构具有较好的整体刚度,静力荷载和地震作用下坡道的应力和变形均满足规范要求,并具有较好的抗连续倒塌能力。 展开更多
关键词 三星堆古蜀文化遗址博物馆 大型螺旋坡道 钢箱梁 结构选型 支座设计 多尺度建模 连续倒塌
下载PDF
主跨330 m高速铁路无砟轨道混合梁斜拉桥设计 被引量:1
14
作者 庄严 《铁道工程学报》 EI CSCD 北大核心 2024年第4期42-47,59,共7页
研究目的:为满足防洪及通航要求,南玉高铁百合郁江特大桥采用(36+40+64+330+64+40+36)m钢箱-混凝土混合梁斜拉桥跨越郁江。该桥为目前国内在建最大跨度的高速铁路无砟轨道钢箱-混凝土混合梁斜拉桥。本文主要基于百合郁江特大桥的设计与... 研究目的:为满足防洪及通航要求,南玉高铁百合郁江特大桥采用(36+40+64+330+64+40+36)m钢箱-混凝土混合梁斜拉桥跨越郁江。该桥为目前国内在建最大跨度的高速铁路无砟轨道钢箱-混凝土混合梁斜拉桥。本文主要基于百合郁江特大桥的设计与受力特点,通过多种评价方法,探讨在大跨度钢混斜拉桥上铺设无砟轨道适应性,为后续建造同类型无砟轨道桥梁提供理论参考。研究结论:(1)主桥采用钢箱梁与混凝土箱梁,并在钢箱梁顶板上现浇混凝土桥面板,为无砟轨道铺设创造了良好条件,并且能很好地控制后期主梁的收缩徐变变形,提高大跨桥梁对无砟轨道适应性;(2)百合郁江特大桥具有良好的静力性能和刚度条件;(3)主桥将轨道结构高度由725 mm调整为775 mm,分别为底座板和道床板预留了20 mm和30 mm的纠偏量,为后续无砟轨道分级施工和纠偏提供了基础,能更好地将施工与测量误差逐级消除,提高无砟轨道铺设精度;(4)采用多种无砟轨道适应性评价方法对主桥无砟轨道线形进行分析,结论均满足设计要求;(5)该桥的成功实施,为国内外高速铁路无砟轨道桥梁建设提供了宝贵的经验,将进一步推动高速铁路无砟轨道大跨度桥梁的技术发展。 展开更多
关键词 无砟轨道 大跨度 钢箱梁 混合梁 斜拉桥
下载PDF
南京仙新路长江大桥主桥结构设计
15
作者 肖海珠 高宗余 +2 位作者 陆勤丰 唐贺强 于俊杰 《桥梁建设》 EI CSCD 北大核心 2024年第2期1-7,共7页
南京仙新路长江大桥主桥为跨径1760 m的单跨钢箱梁悬索桥,主缆垂跨比1/9,边跨跨径580 m,边中跨比0.33。该桥上、下游各设1根主缆,单根主缆由169股127∅5.4 mm镀锌铝高强钢丝索股组成,采用PPWS法施工,钢丝标准抗拉强度2100 MPa。吊索与索... 南京仙新路长江大桥主桥为跨径1760 m的单跨钢箱梁悬索桥,主缆垂跨比1/9,边跨跨径580 m,边中跨比0.33。该桥上、下游各设1根主缆,单根主缆由169股127∅5.4 mm镀锌铝高强钢丝索股组成,采用PPWS法施工,钢丝标准抗拉强度2100 MPa。吊索与索夹采用销接式结构,跨中设置柔性中央扣索,短吊索设置关节轴承。主索鞍采用宽鞍槽单纵肋铸焊结合构造,散索鞍采用底座式全铸结构。加劲梁采用扁平流线型封闭整体钢箱梁,总宽31.5 m,梁高4 m,顶板与U肋之间采用双面埋弧全熔透焊接。桥塔采用门形混凝土结构,总高277.3 m,其上横梁为预应力混凝土结构,外包N字造型钢结构;桥塔基础采用直径2.8 m钻孔灌注桩。南锚碇采用外径65 m圆形地下连续墙基础;北锚碇采用沉井基础,平面尺寸70 m×50 m,高50 m。对结构进行静力分析及抗风性能理论和试验研究,结果表明:结构强度、刚度均满足规范要求;在加劲梁上设置0.67 m高中央稳定板、两侧风嘴处设置1 m宽水平稳定板后,大桥的颤振、涡振等抗风性能均满足要求,且具备一定的阻尼储备。 展开更多
关键词 悬索桥 高强钢丝 索鞍 钢箱梁 地下连续墙 锚碇 抗风性能 结构设计
下载PDF
大跨度铁路桥附属构件对不同宽高比矩形断面涡振性能的影响
16
作者 黄林 董佳慧 +2 位作者 王骑 廖海黎 李志国 《中国铁道科学》 EI CAS CSCD 北大核心 2024年第2期81-89,共9页
在已建成的大跨度鳊鱼洲长江大桥原设计宽高比为6.7∶1的四线铁路桥矩形箱型主梁断面的基础上,通过调整断面宽高比,设计宽高比为4∶1的二线铁路和宽高比为9∶1的六线铁路桥矩形箱梁断面。通过节段模型风洞试验,在0°,±3°... 在已建成的大跨度鳊鱼洲长江大桥原设计宽高比为6.7∶1的四线铁路桥矩形箱型主梁断面的基础上,通过调整断面宽高比,设计宽高比为4∶1的二线铁路和宽高比为9∶1的六线铁路桥矩形箱梁断面。通过节段模型风洞试验,在0°,±3°和±5°风攻角的均匀来流下,对以上3种常用二线、四线和六线铁路桥矩形箱梁断面与对应相同宽高比纯矩形断面之间的涡振特性关系,以及铁路桥附属构件对不同宽高比矩形断面涡振性能的影响进行研究。结果表明:在宽高比分别为4∶1和6.7∶1的矩形断面上布置铁路桥附属构件能增大断面在负风攻角下的涡振振幅,在-5°风攻角下竖向涡振振幅增大率高达277.5%,但对正风攻角下的涡振响应起到一定的抑制作用,而在宽高比为9∶1的矩形断面布置六线铁路桥附属构件则能明显增大该断面在各风攻角下的涡振振幅,其扭转涡振振幅增大率均在48.3%以上;铁路桥附属构件对矩形断面涡振性能的降低作用随着断面宽高比的增大而提升,针对气动外形较钝的二线和四线铁路桥箱梁,可参考相似宽高比矩形断面涡振特性,并重点考察箱梁在负风攻角下的涡振响应,而针对宽高比较大的六线铁路桥箱梁,由于附属构件影响较大,参考相似宽高比矩形断面涡振特性的意义较小,均应详细研究其在各风攻角下的涡振性能。 展开更多
关键词 大跨度铁路桥 钢箱梁 节段模型 宽高比 矩形断面 附属构件 涡振性能 风洞试验
下载PDF
大跨长挑臂钢箱组合梁桥抗风性能试验研究
17
作者 王彬 刘来君 刘志文 《桥梁建设》 EI CSCD 北大核心 2024年第2期99-105,共7页
为了解大跨长挑臂钢箱组合梁桥抗风性能及选取合适的声屏障形式,以挑臂长7.5 m的钢箱组合梁桥——临猗黄河大桥为背景,基于有限元计算的施工及成桥阶段桥梁动力特性指标,制作1个缩尺比1∶50的最大悬臂施工状态钢箱梁、2个缩尺比1∶60的... 为了解大跨长挑臂钢箱组合梁桥抗风性能及选取合适的声屏障形式,以挑臂长7.5 m的钢箱组合梁桥——临猗黄河大桥为背景,基于有限元计算的施工及成桥阶段桥梁动力特性指标,制作1个缩尺比1∶50的最大悬臂施工状态钢箱梁、2个缩尺比1∶60的成桥状态不同声屏障设置形式(直线形、折线形,高度均为2.5 m)钢箱组合梁节段模型进行风洞试验,分析施工和成桥状态主梁断面的涡振、颤振和驰振性能。结果表明:施工状态的钢箱梁抗风稳定性良好,涡振、颤振和驰振性能均满足设计要求;常遇风攻角为0°、±3°时,成桥状态下,设置2.5 m高折线形声屏障可有效抑制主梁涡振响应,且颤振与驰振稳定性均满足规范要求;设置2.5 m高直线形声屏障的主梁发生明显的竖向涡振现象。该桥主梁最终采用2.5 m高折线形声屏障。 展开更多
关键词 钢箱组合梁 长挑臂 节段模型 声屏障 涡振 颤振 驰振 风洞试验
下载PDF
武汉青山长江公路大桥宽幅钢箱梁悬臂拼装横向线形匹配技术
18
作者 张晶 赵全成 戚原 《桥梁建设》 EI CSCD 北大核心 2024年第2期139-144,共6页
武汉青山长江公路大桥主桥为主跨938 m的双塔双索面全飘浮体系斜拉桥,主跨整体式钢箱梁高4.5 m、全宽48 m,采用500 t架梁吊机分节段悬臂拼装架设。钢箱梁悬臂拼装时,架梁吊机站位节段、待架节段由于荷载及约束不同,横截面变形呈现出不... 武汉青山长江公路大桥主桥为主跨938 m的双塔双索面全飘浮体系斜拉桥,主跨整体式钢箱梁高4.5 m、全宽48 m,采用500 t架梁吊机分节段悬臂拼装架设。钢箱梁悬臂拼装时,架梁吊机站位节段、待架节段由于荷载及约束不同,横截面变形呈现出不同的趋势,线形匹配难度大。为解决该问题,主跨钢箱梁悬臂拼装时选择上、下游分体式架梁吊机,减少架梁吊机自重;经比选选择横桥向27.7 m间距的架梁吊机站位,减小了架梁吊机荷载对横向线形匹配的影响;通过设置顶压装置(由顶压牛腿、支承底座组成),在架梁吊机站位节段、待架节段钢箱梁边腹板处施加1500 kN顶压力,配合少量马板,一次加载完成对接口竖向变形匹配调整。施工后,钢箱梁横向线形匹配精度均满足要求。 展开更多
关键词 斜拉桥 宽幅钢箱梁 悬臂拼装 分体式架梁吊机 吊机站位 顶压牛腿 匹配技术
下载PDF
槽形钢箱梁涡振性能及抑振措施试验研究
19
作者 封周权 戴金元 +1 位作者 陈诗璇 华旭刚 《世界桥梁》 北大核心 2024年第3期83-89,共7页
为提高槽形钢箱梁桥的抗风性能,对槽形钢箱梁的涡振性能及抑振措施进行试验研究。以某人行景观桥槽形钢箱梁为背景,通过主梁节段模型风洞试验,研究+3°、0°、-3°风攻角下均匀流与紊流风场中槽形钢箱梁的涡振性能,分析交... 为提高槽形钢箱梁桥的抗风性能,对槽形钢箱梁的涡振性能及抑振措施进行试验研究。以某人行景观桥槽形钢箱梁为背景,通过主梁节段模型风洞试验,研究+3°、0°、-3°风攻角下均匀流与紊流风场中槽形钢箱梁的涡振性能,分析交替封闭栏杆、将栏杆楔形扶手改为圆形扶手、提高阻尼比等措施的抑振效果。结果表明:原槽形钢箱梁断面涡振性能不满足规范要求,均匀流风场中,3个风攻角下均出现了超限的竖弯涡振,+3°和-3°风攻角下出现了不同程度的扭转涡振,最不利风攻角为-3°;紊流风场中,最不利风攻角下原断面竖弯涡振振幅降低了23%,未见明显扭转涡振;楔形扶手栏杆交替封闭使结构竖弯涡振振幅增大,主梁涡振性能降低;单独改变栏杆扶手形状为圆形对主梁涡振性能影响不大,在此基础上交替封闭栏杆能够有效抑制主梁涡振;提高结构阻尼比能有效抑制主梁涡振,阻尼比为7‰时,主梁竖弯涡振振幅可降至规范限值的一半左右。 展开更多
关键词 人行桥 槽形钢箱梁 风致振动 涡振性能 抑振措施 扶手形状 阻尼比 风洞试验
下载PDF
公铁合建钢混板-桁斜拉桥悬挑式钢锚箱受力特性及结构优化
20
作者 施洲 周勇聪 +3 位作者 江峰 刘振标 夏正春 印涛 《中国铁道科学》 EI CAS CSCD 北大核心 2024年第3期50-60,共11页
为研究大跨度公铁合建钢混板-桁斜拉桥主梁悬挑式索梁钢锚箱结构的受力特性及结构优化,以主跨808 m的洪奇沥特大桥钢锚箱为背景,采用仿真分析方法,研究钢锚箱3个设计方案主要板件应力、焊缝应力以及推荐方案锚箱节点的传力特性和锚箱参... 为研究大跨度公铁合建钢混板-桁斜拉桥主梁悬挑式索梁钢锚箱结构的受力特性及结构优化,以主跨808 m的洪奇沥特大桥钢锚箱为背景,采用仿真分析方法,研究钢锚箱3个设计方案主要板件应力、焊缝应力以及推荐方案锚箱节点的传力特性和锚箱参数对钢锚箱受力的影响。结果表明:锚箱尺寸较大、顶底板加肋方案的主要板件应力最大为300 MPa,小于其他2种方案,且6条焊缝的最大应力和应力不均匀系数较优,因此确定该方案为最终设计方案;索力首先由锚垫板直接向钢锚箱顶、底板和内外腹板较为均匀传递,最终边弦杆底板、内腹板和外腹板分别承担了22.2%,46.4%和31.4%的索力;节点处副桁斜杆、近桥塔侧和远桥塔侧边弦杆、混凝土桥面、节点横梁分别传递约66.71%,9.72%,9.32%,9.68%和4.56%的斜拉索竖向分力;板件应力随顶底板厚度增加而减小,顶底板深入边弦杆长度增加可以降低底板-内腹板焊缝峰值应力,顶底板间距减小可降低内外腹板和顶底板与锚垫板接触区域应力;顶底板厚44 mm、锚箱顶底板深入边弦杆长度1800 mm、顶底板间距660 mm时较为合理。 展开更多
关键词 公铁合建斜拉桥 索梁钢锚箱 受力特性 传力特性 结构优化
下载PDF
上一页 1 2 153 下一页 到第
使用帮助 返回顶部