This article analyzes the application strategies of shotcrete anchor support technology using a highway bridge-tunnel construction project as an example.The article covers various strategies,including support plan for...This article analyzes the application strategies of shotcrete anchor support technology using a highway bridge-tunnel construction project as an example.The article covers various strategies,including support plan formulation,mortar shotcrete anchor construction,grid steel frame construction,steel mesh construction,and concrete support construction.This analysis aims to provide a guideline for those interested in applying this technology and improving the quality and safety of highway bridges and tunnels construction.展开更多
Cracking during construction is a common occurrence in modern bridge engineering that can directly impact the overall safety of the bridge.Therefore,it is essential to focus on preventing and controlling cracks.As the...Cracking during construction is a common occurrence in modern bridge engineering that can directly impact the overall safety of the bridge.Therefore,it is essential to focus on preventing and controlling cracks.As the construction technology for bridge engineering has evolved,the internal quality of construction has significantly improved.However,the appearance quality remains a crucial factor that reflects the technical expertise of a construction company.Therefore,minimizing cracks and improving the appearance quality of concrete are critical issues that require the attention of construction units,supervision departments,and construction companies.This article will analyze the causes of cracking and suggest corresponding prevention and treatment methods.展开更多
The questions of what kind of individuals university education should cultivate,how to cultivate them,and for whom they are being trained are pressing issues that require immediate solutions.Implementing ideological a...The questions of what kind of individuals university education should cultivate,how to cultivate them,and for whom they are being trained are pressing issues that require immediate solutions.Implementing ideological and political education is a fundamental way to address these challenges.Integrating political education into professional courses is just as important as imparting knowledge,fostering interest,transmitting values,and shaping students’character and spirit.The excavation of ideological and political elements in bridge engineering courses should comprehensively consider the dependent subject of ideological and political elements,the source of cases,the depth of excavation,the trade-offs between courses,the commonality and multifaceted nature of ideological and political elements,as well as the two ways of ideological and political elements integration.Ideological and political elements should be integrated into all stages of classroom lectures,course assignments,final examinations,course design,discipline competitions,school-enterprise cooperation,etc.,so as to achieve the effect of educating people in the whole process.展开更多
Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influe...Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influence each other,especially when subway construction requires passing under bridges.In such cases,pile foundation replacement technology is often necessary.However,this technology is highly specialized,with a lengthy and risky construction period,and high costs.Personnel must be proficient in key technical aspects to ensure construction quality.This article discusses the technical principle,construction process,and core technology of pile foundation replacement,along with the application of this technology in subway tunnel crossing bridge projects,supported by engineering examples for reference.展开更多
As the urban populations grow,the number and size of subway construction projects are increasing while also meeting higher construction standards.So,subway construction projects must have a better understanding of con...As the urban populations grow,the number and size of subway construction projects are increasing while also meeting higher construction standards.So,subway construction projects must have a better understanding of construction technology.This article focuses on the construction technology of the subway tunnel expansion under the bridge foundation.By analyzing the engineering characteristics of the bridge foundation and using a project as an example,this article provides a detailed discussion of the construction process of tunnel expansion under a bridge foundation.This article aims to serve as a reference for subway tunnel construction in China to ensure the key points of construction technology are understood,thus improving construction quality and laying a solid technical foundation for the sustainable development of urban rail engineering.展开更多
During the Victorian Age,when the results of ambitious engineering radically transformed the principles of construction,photography proved to be a faithful and indispensable witness.This is plainly seen in the magnifi...During the Victorian Age,when the results of ambitious engineering radically transformed the principles of construction,photography proved to be a faithful and indispensable witness.This is plainly seen in the magnificent enterprise to build the railway bridge over the Forth River,accurately captured by the lens of the photographer and engineer Evelyn George Carey,whose excellent work to record those events is without equal.His almost daily annotations were free from symbolic meaning and monumental tendencies:it was the bridge itself that held the most important role.In the form of an experiment it was decided to illustrate the principle of the cantilever at the Royal Institution in 1887.It was during that particular circumstance that Carey produced the famous photographic image of the Human Cantilever.Carey presents to the observer an encyclopaedic array of representations and helps to truly visualise engineering.展开更多
Road and bridge engineering is an indispensable part of socialist economic construction in China, whose construction quality significantly affects the infrastructure construction level in the whole society. To meet th...Road and bridge engineering is an indispensable part of socialist economic construction in China, whose construction quality significantly affects the infrastructure construction level in the whole society. To meet the rapid economic development of various regions, construction scale and quantity of road and bridge engineering have been continuously expanded and increased, therefore, higher requirements for construction quality and construction standard are also presented. During the construction of road and bridge engineering, concrete crack is a key problem which affects the construction quality. In this regard, this paper analyzes cause and prevention measures of concrete cracks during the construction of road and bridge engineering, and hopes to provide construction personnel with valuable references.展开更多
In recent years, the rapid growth of the number of private cars has greatly increased the traffic pressure, so the quality of roads and bridges should be further improved. The paper expounds the related matters of roa...In recent years, the rapid growth of the number of private cars has greatly increased the traffic pressure, so the quality of roads and bridges should be further improved. The paper expounds the related matters of road and bridge engineering from three aspects. Firstly, it expounds the construction principles of road and bridge engineering, which are regarded as the theoretical basis of follow-up research. Secondly, it analyzes the common diseases of road and bridge engineering, including bridgehead damage, rein-forcement corrosion, and subgrade uneven settlement, etc. Finally, it puts forward the construction treatment technology of road and bridge engineering on the basis of the construction principles and taking the common diseases as reference.展开更多
Engineering surveying is an important course for road and bridge engineering technology majors in higher vocational colleges.With the advancement of science and technology,engineering surveying technology is also cons...Engineering surveying is an important course for road and bridge engineering technology majors in higher vocational colleges.With the advancement of science and technology,engineering surveying technology is also constantly developing,so the theoretical knowledge and professional skills that students need to master are also becoming increasingly complicated.To stimulate the students’interest in learning the course,it is necessary to continuously introduce innovative teaching methods into the course.In this paper,the importance of teaching innovation in engineering surveying courses of road and bridge engineering technology majors in higher vocational colleges and the knowledge system that students need to master are analyzed.Subsequently,innovative strategies are proposed to help improve the students’mastery of engineering surveying.展开更多
A new model is proposed to improve the efficiency of structural modeling. In this model, the bridge structural components are expressed with component description, parametric description and geometric description in a...A new model is proposed to improve the efficiency of structural modeling. In this model, the bridge structural components are expressed with component description, parametric description and geometric description in a software system. This model provides both convenience and flexibility for users in structural modeling process. The object-oriented method is applied in the model implementation. A bridge analysis preprocessor is developed on the basis of this model. It provides an effective way for bridge modeling.展开更多
At present,shield tunneling often needs to pass through a large number of bridge pile foundations.However,there are few studies on the influence of shield tunneling on adjacent pile foundations by combining with groun...At present,shield tunneling often needs to pass through a large number of bridge pile foundations.However,there are few studies on the influence of shield tunneling on adjacent pile foundations by combining with groundwater seepage.Based on Winkler model,the calculation equations of shield tunneling on vertical and horizontal displacement of adjacent bridge pile are derived.Meanwhile,full and part three-dimensional finite element models are established to analyze the trend of bridge pier settlement,ground surface settlement trough,vertical and horizontal displacement of the pile and pile stress under three calculation conditions,i.e.,not considering groundwater effect,considering stable groundwater effect and fluid-soil interaction.The results show that the calculated value is small when the effect of groundwater is not considered;the seepage velocity of the soil above the excavation face is faster than that of the surrounding soil under fluid-soil interaction,and after the shield passing,the groundwater on both sides shows a flow trend of“U”shape on the ground surface supplying to the upper part of the tunnel;the vertical displacement of the pile body is bounded by the horizontal position of the top of the tunnel,the upper pile body settles,and the lower pile body deforms upward.The horizontal displacement of pile body presents a continuous“S”shape distribution,causing stress concentration near the tunnel.The calculated results of fluid-soil interaction are in good agreement with the field measured data and accord with the actual situation.展开更多
The aerodynamic performance of high-speed trains passing each other was investigated on a simply supported box girder bridge,with a span of 32 m,under crosswinds.The bridge and train models,modeled at a geometric scal...The aerodynamic performance of high-speed trains passing each other was investigated on a simply supported box girder bridge,with a span of 32 m,under crosswinds.The bridge and train models,modeled at a geometric scale ratio of 1:30,were used to test the aerodynamic forces of the train,with the help of a designed moving test rig in the XNJD-3 wind tunnel.The effects of wind speed,train speed,and yaw angle on the aerodynamic coefficients of the train were analyzed.The static and moving model tests were compared to demonstrate how the movement of the train influences its aerodynamic characteristics.The results show that the sheltering effect introduced by trains passing each other can cause a sudden change in force on the leeward train,which is further influenced by the wind and running speeds.Detailed analyses related to the effect of wind and train speeds on the aerodynamic coefficients were conducted.The relationship between the change in aerodynamic coefficients and yaw angle was finally described by a series of proposed fitting formulas.展开更多
Immersed tunnel is an important part of the Hong Kong–Zhuhai–Macao Bridge(HZMB) project. In immersed tunnel floating, translation which includes straight and transverse movements is the main working mode. To decide ...Immersed tunnel is an important part of the Hong Kong–Zhuhai–Macao Bridge(HZMB) project. In immersed tunnel floating, translation which includes straight and transverse movements is the main working mode. To decide the magnitude and direction of the towing force for each tug, a particle swarm-based translation control method is presented for non-power immersed tunnel element. A sort of linear weighted logarithmic function is exploited to avoid weak subgoals. In simulation, the particle swarm-based control method is evaluated and compared with traditional empirical method in the case of the HZMB project. Simulation results show that the presented method delivers performance improvement in terms of the enhanced surplus towing force.展开更多
Purpose-Express freight transportation is in rapid development currently.Owing to the higher speed of express freight train,the deformation of the bridge deck worsens the railway line condition under the action of win...Purpose-Express freight transportation is in rapid development currently.Owing to the higher speed of express freight train,the deformation of the bridge deck worsens the railway line condition under the action of wind and train moving load when the train runs over a long-span bridge.Besides,the blunt car body of vehicle has poor aerodynamic characteristics,bringing a greater challenge on the running stability in the crosswind.Design/methodology/approach-In this study,the aerodynamic force coefficients of express freight vehicles on the bridge are measured by scale model wind tunnel test.The dynamic model of the train-long-span steel truss bridge coupling system is established,and the dynamic response as well as the running safety of vehicle are evaluated.Findings-The results show that wind speed has a significant influence on running safety,which is mainly reflected in the over-limitation of wheel unloading rate.The wind speed limit decreases with train speed,and it reduces to 18.83 m/s when the train speed is 160 km/h.Originality/value-This study deepens the theoretical understanding of the interaction between vehicles and bridges and proposes new methods for analyzing similar engineering problems.It also provides a new theoretical basis for the safety assessment of express freight trains.展开更多
In recent years,the safety and comfort of road vehicles driving on bridges under crosswinds have attracted more attention due to frequent occurrences of wind-induced disasters.This study focuses on a container truck a...In recent years,the safety and comfort of road vehicles driving on bridges under crosswinds have attracted more attention due to frequent occurrences of wind-induced disasters.This study focuses on a container truck and CRH2 high-speed train as research targets.Wind tunnel experiments are performed to investigate shielding effects of trains on aerodynamic characteristics of trucks.The results show that aerodynamic interference between trains and trucks varies with positions of trains(upstream,downstream)and trucks(upwind,downwind)and numbers of trains.To summarize,whether the train is upstream or downstream of tracks has basically no effect on aerodynamic forces,other than moments,of a truck driving on windward sides of bridges(upwind).In contrast,the presence of trains on the bridge deck has a significant impact on aerodynamic characteristics of a truck driving on leeward sides(downwind)at the same time.The best shielding effect on lateral forces of trucks occurs when the train is located downstream of tracks.Finally,the pressure measuring system shows that only lift forces on trains are affected by trucks,while other forces and moments are primarily affected by adjacent trains.展开更多
Segment sectional model tests are carried out to investigate the wind loading on middle pylon of Taizhou Bridge, which has complicated three-dimensional flow due to its feature of double columns. Through the force mea...Segment sectional model tests are carried out to investigate the wind loading on middle pylon of Taizhou Bridge, which has complicated three-dimensional flow due to its feature of double columns. Through the force measuring tests, aerodynamic force coefficients of every segment of the pylon columns have been obtained. It is found that the tested aerodynamic force coefficients are much smaller than those given by codes. The interference effects of aerodynamic force coefficients between columns of pylon are discussed. The results show that the interference effect is the most evident when the yaw angle is about 30 ° from transverse direction. This kind of interference effect can be described as diminutions in transverse aerodynamic force coefficients and magnifications in longitudinal aerodynamic force coefficients of downstream columns.展开更多
In order to realize the in-situ evaluation of reinforced concrete bridges subjected to fatigue for a long time or after earthquake, an evaluation method for cumulative damage of concrete structures based on unloading ...In order to realize the in-situ evaluation of reinforced concrete bridges subjected to fatigue for a long time or after earthquake, an evaluation method for cumulative damage of concrete structures based on unloading elastic modulus was proposed. First, according to the concrete stress-strain curve and the statistical relationship between residual strain and cumulative strain, the calculation method of static equivalent strain and residual strain concrete based on unloading elastic modulus and the method for estimating the strength of concrete after damage were proposed. The detailed steps of field test and analysis and the practical damage indicators of residual strain were given. Then, the evaluation method of existing stress and strain of Reinforced Concrete Bridge under dead load and the concept of “equivalent dead load bending moment” were put forward. On this basis, the paper analyzed the root cause of the decrease of bearing capacity of Reinforced Concrete Bridge after fatigue damage, and pointed out that the equivalent strain or residual strain of reinforced concrete increases under the fatigue effect, which led to the decreasing of actual live moment and deformation performance while the ultimate load-carrying capacity remained constant or very little decrease. The evaluation method of structure residual capacity was given, and through comparative analysis of eight T reinforced concrete beams that had been in service for 35 years with the static failure tests, the effectiveness of the method was verified.展开更多
The application of tunneling machine to Chinese underground engineering construction is outlined,and its future prospect is forecasted in the light of the requirements for Chinese underground engineering construction ...The application of tunneling machine to Chinese underground engineering construction is outlined,and its future prospect is forecasted in the light of the requirements for Chinese underground engineering construction in the 21st century. Further suggestion is put forward on the effective use of tunneling machine.展开更多
In the maintenance work of highway and bridge engineering structures,the fracture delay of high-strength bolts is a content that needs to be focused on and researched.Based on this,the paper analyzes the fracture dela...In the maintenance work of highway and bridge engineering structures,the fracture delay of high-strength bolts is a content that needs to be focused on and researched.Based on this,the paper analyzes the fracture delay of high-strength bolts in highway bridge maintenance,including an overview of the fundamental research on fracture delay and related specific studies.It is hoped that this study can provide scientific reference for the reasonable maintenance of high-strength bolts,so as to ensure the overall maintenance effect of highway bridge projects.展开更多
文摘This article analyzes the application strategies of shotcrete anchor support technology using a highway bridge-tunnel construction project as an example.The article covers various strategies,including support plan formulation,mortar shotcrete anchor construction,grid steel frame construction,steel mesh construction,and concrete support construction.This analysis aims to provide a guideline for those interested in applying this technology and improving the quality and safety of highway bridges and tunnels construction.
文摘Cracking during construction is a common occurrence in modern bridge engineering that can directly impact the overall safety of the bridge.Therefore,it is essential to focus on preventing and controlling cracks.As the construction technology for bridge engineering has evolved,the internal quality of construction has significantly improved.However,the appearance quality remains a crucial factor that reflects the technical expertise of a construction company.Therefore,minimizing cracks and improving the appearance quality of concrete are critical issues that require the attention of construction units,supervision departments,and construction companies.This article will analyze the causes of cracking and suggest corresponding prevention and treatment methods.
基金Chongqing Institute of Engineering Ideological and Political Teaching Demonstration Course Construction Project(KC20230010)。
文摘The questions of what kind of individuals university education should cultivate,how to cultivate them,and for whom they are being trained are pressing issues that require immediate solutions.Implementing ideological and political education is a fundamental way to address these challenges.Integrating political education into professional courses is just as important as imparting knowledge,fostering interest,transmitting values,and shaping students’character and spirit.The excavation of ideological and political elements in bridge engineering courses should comprehensively consider the dependent subject of ideological and political elements,the source of cases,the depth of excavation,the trade-offs between courses,the commonality and multifaceted nature of ideological and political elements,as well as the two ways of ideological and political elements integration.Ideological and political elements should be integrated into all stages of classroom lectures,course assignments,final examinations,course design,discipline competitions,school-enterprise cooperation,etc.,so as to achieve the effect of educating people in the whole process.
文摘Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influence each other,especially when subway construction requires passing under bridges.In such cases,pile foundation replacement technology is often necessary.However,this technology is highly specialized,with a lengthy and risky construction period,and high costs.Personnel must be proficient in key technical aspects to ensure construction quality.This article discusses the technical principle,construction process,and core technology of pile foundation replacement,along with the application of this technology in subway tunnel crossing bridge projects,supported by engineering examples for reference.
文摘As the urban populations grow,the number and size of subway construction projects are increasing while also meeting higher construction standards.So,subway construction projects must have a better understanding of construction technology.This article focuses on the construction technology of the subway tunnel expansion under the bridge foundation.By analyzing the engineering characteristics of the bridge foundation and using a project as an example,this article provides a detailed discussion of the construction process of tunnel expansion under a bridge foundation.This article aims to serve as a reference for subway tunnel construction in China to ensure the key points of construction technology are understood,thus improving construction quality and laying a solid technical foundation for the sustainable development of urban rail engineering.
文摘During the Victorian Age,when the results of ambitious engineering radically transformed the principles of construction,photography proved to be a faithful and indispensable witness.This is plainly seen in the magnificent enterprise to build the railway bridge over the Forth River,accurately captured by the lens of the photographer and engineer Evelyn George Carey,whose excellent work to record those events is without equal.His almost daily annotations were free from symbolic meaning and monumental tendencies:it was the bridge itself that held the most important role.In the form of an experiment it was decided to illustrate the principle of the cantilever at the Royal Institution in 1887.It was during that particular circumstance that Carey produced the famous photographic image of the Human Cantilever.Carey presents to the observer an encyclopaedic array of representations and helps to truly visualise engineering.
文摘Road and bridge engineering is an indispensable part of socialist economic construction in China, whose construction quality significantly affects the infrastructure construction level in the whole society. To meet the rapid economic development of various regions, construction scale and quantity of road and bridge engineering have been continuously expanded and increased, therefore, higher requirements for construction quality and construction standard are also presented. During the construction of road and bridge engineering, concrete crack is a key problem which affects the construction quality. In this regard, this paper analyzes cause and prevention measures of concrete cracks during the construction of road and bridge engineering, and hopes to provide construction personnel with valuable references.
文摘In recent years, the rapid growth of the number of private cars has greatly increased the traffic pressure, so the quality of roads and bridges should be further improved. The paper expounds the related matters of road and bridge engineering from three aspects. Firstly, it expounds the construction principles of road and bridge engineering, which are regarded as the theoretical basis of follow-up research. Secondly, it analyzes the common diseases of road and bridge engineering, including bridgehead damage, rein-forcement corrosion, and subgrade uneven settlement, etc. Finally, it puts forward the construction treatment technology of road and bridge engineering on the basis of the construction principles and taking the common diseases as reference.
文摘Engineering surveying is an important course for road and bridge engineering technology majors in higher vocational colleges.With the advancement of science and technology,engineering surveying technology is also constantly developing,so the theoretical knowledge and professional skills that students need to master are also becoming increasingly complicated.To stimulate the students’interest in learning the course,it is necessary to continuously introduce innovative teaching methods into the course.In this paper,the importance of teaching innovation in engineering surveying courses of road and bridge engineering technology majors in higher vocational colleges and the knowledge system that students need to master are analyzed.Subsequently,innovative strategies are proposed to help improve the students’mastery of engineering surveying.
文摘A new model is proposed to improve the efficiency of structural modeling. In this model, the bridge structural components are expressed with component description, parametric description and geometric description in a software system. This model provides both convenience and flexibility for users in structural modeling process. The object-oriented method is applied in the model implementation. A bridge analysis preprocessor is developed on the basis of this model. It provides an effective way for bridge modeling.
基金Project(52078060)supported by the National Natural Science Foundation of ChinaProject(2020JJ4606)supported by the National Science Foundation of Hunan Province,China+1 种基金Project(18A127)supported by the Key Foundation of Education Department of Hunan Province,ChinaProject(2018IC19)supported by the International Cooperation and Development Project of Double-First-Class Scientific Research in Changsha University of Science&Technology,China。
文摘At present,shield tunneling often needs to pass through a large number of bridge pile foundations.However,there are few studies on the influence of shield tunneling on adjacent pile foundations by combining with groundwater seepage.Based on Winkler model,the calculation equations of shield tunneling on vertical and horizontal displacement of adjacent bridge pile are derived.Meanwhile,full and part three-dimensional finite element models are established to analyze the trend of bridge pier settlement,ground surface settlement trough,vertical and horizontal displacement of the pile and pile stress under three calculation conditions,i.e.,not considering groundwater effect,considering stable groundwater effect and fluid-soil interaction.The results show that the calculated value is small when the effect of groundwater is not considered;the seepage velocity of the soil above the excavation face is faster than that of the surrounding soil under fluid-soil interaction,and after the shield passing,the groundwater on both sides shows a flow trend of“U”shape on the ground surface supplying to the upper part of the tunnel;the vertical displacement of the pile body is bounded by the horizontal position of the top of the tunnel,the upper pile body settles,and the lower pile body deforms upward.The horizontal displacement of pile body presents a continuous“S”shape distribution,causing stress concentration near the tunnel.The calculated results of fluid-soil interaction are in good agreement with the field measured data and accord with the actual situation.
基金This work was financially supported by the National Natural Science Foundation of China (U1434205, 51708645).
文摘The aerodynamic performance of high-speed trains passing each other was investigated on a simply supported box girder bridge,with a span of 32 m,under crosswinds.The bridge and train models,modeled at a geometric scale ratio of 1:30,were used to test the aerodynamic forces of the train,with the help of a designed moving test rig in the XNJD-3 wind tunnel.The effects of wind speed,train speed,and yaw angle on the aerodynamic coefficients of the train were analyzed.The static and moving model tests were compared to demonstrate how the movement of the train influences its aerodynamic characteristics.The results show that the sheltering effect introduced by trains passing each other can cause a sudden change in force on the leeward train,which is further influenced by the wind and running speeds.Detailed analyses related to the effect of wind and train speeds on the aerodynamic coefficients were conducted.The relationship between the change in aerodynamic coefficients and yaw angle was finally described by a series of proposed fitting formulas.
基金financially supported by the Ministry of Education of Humanities and Social Science Project(Grant Nos.15YJC630145 and 15YJC630059)the Natural Science Foundation of Shanghai Science and Technology Committee(Grant No.15ZR1420200)
文摘Immersed tunnel is an important part of the Hong Kong–Zhuhai–Macao Bridge(HZMB) project. In immersed tunnel floating, translation which includes straight and transverse movements is the main working mode. To decide the magnitude and direction of the towing force for each tug, a particle swarm-based translation control method is presented for non-power immersed tunnel element. A sort of linear weighted logarithmic function is exploited to avoid weak subgoals. In simulation, the particle swarm-based control method is evaluated and compared with traditional empirical method in the case of the HZMB project. Simulation results show that the presented method delivers performance improvement in terms of the enhanced surplus towing force.
基金supported by the Research Major Project of China Academy of Railway Sciences Group Co.,Ltd(Grant No.2021YJ270)the China National Railway Group Science and Technology Program(Grant No.N2022T001).
文摘Purpose-Express freight transportation is in rapid development currently.Owing to the higher speed of express freight train,the deformation of the bridge deck worsens the railway line condition under the action of wind and train moving load when the train runs over a long-span bridge.Besides,the blunt car body of vehicle has poor aerodynamic characteristics,bringing a greater challenge on the running stability in the crosswind.Design/methodology/approach-In this study,the aerodynamic force coefficients of express freight vehicles on the bridge are measured by scale model wind tunnel test.The dynamic model of the train-long-span steel truss bridge coupling system is established,and the dynamic response as well as the running safety of vehicle are evaluated.Findings-The results show that wind speed has a significant influence on running safety,which is mainly reflected in the over-limitation of wheel unloading rate.The wind speed limit decreases with train speed,and it reduces to 18.83 m/s when the train speed is 160 km/h.Originality/value-This study deepens the theoretical understanding of the interaction between vehicles and bridges and proposes new methods for analyzing similar engineering problems.It also provides a new theoretical basis for the safety assessment of express freight trains.
基金Projects(52078504,51822803,51925808,U1934209)supported by the National Natural Science Foundation of ChinaProject(KF2021-05)supported by the State Key Laboratory of Mechanical Behavior and System Safety of Traffic Engineering Structures,China。
文摘In recent years,the safety and comfort of road vehicles driving on bridges under crosswinds have attracted more attention due to frequent occurrences of wind-induced disasters.This study focuses on a container truck and CRH2 high-speed train as research targets.Wind tunnel experiments are performed to investigate shielding effects of trains on aerodynamic characteristics of trucks.The results show that aerodynamic interference between trains and trucks varies with positions of trains(upstream,downstream)and trucks(upwind,downwind)and numbers of trains.To summarize,whether the train is upstream or downstream of tracks has basically no effect on aerodynamic forces,other than moments,of a truck driving on windward sides of bridges(upwind).In contrast,the presence of trains on the bridge deck has a significant impact on aerodynamic characteristics of a truck driving on leeward sides(downwind)at the same time.The best shielding effect on lateral forces of trucks occurs when the train is located downstream of tracks.Finally,the pressure measuring system shows that only lift forces on trains are affected by trucks,while other forces and moments are primarily affected by adjacent trains.
基金National Science and Technology Support Program of China ( No. 2009BAG15B01)Key Pro-grams for Science and Technology Development of Chinese Transportation Industry ( No. 2008-353-332-190 )National Science Foundation( No. 51008233)
文摘Segment sectional model tests are carried out to investigate the wind loading on middle pylon of Taizhou Bridge, which has complicated three-dimensional flow due to its feature of double columns. Through the force measuring tests, aerodynamic force coefficients of every segment of the pylon columns have been obtained. It is found that the tested aerodynamic force coefficients are much smaller than those given by codes. The interference effects of aerodynamic force coefficients between columns of pylon are discussed. The results show that the interference effect is the most evident when the yaw angle is about 30 ° from transverse direction. This kind of interference effect can be described as diminutions in transverse aerodynamic force coefficients and magnifications in longitudinal aerodynamic force coefficients of downstream columns.
文摘In order to realize the in-situ evaluation of reinforced concrete bridges subjected to fatigue for a long time or after earthquake, an evaluation method for cumulative damage of concrete structures based on unloading elastic modulus was proposed. First, according to the concrete stress-strain curve and the statistical relationship between residual strain and cumulative strain, the calculation method of static equivalent strain and residual strain concrete based on unloading elastic modulus and the method for estimating the strength of concrete after damage were proposed. The detailed steps of field test and analysis and the practical damage indicators of residual strain were given. Then, the evaluation method of existing stress and strain of Reinforced Concrete Bridge under dead load and the concept of “equivalent dead load bending moment” were put forward. On this basis, the paper analyzed the root cause of the decrease of bearing capacity of Reinforced Concrete Bridge after fatigue damage, and pointed out that the equivalent strain or residual strain of reinforced concrete increases under the fatigue effect, which led to the decreasing of actual live moment and deformation performance while the ultimate load-carrying capacity remained constant or very little decrease. The evaluation method of structure residual capacity was given, and through comparative analysis of eight T reinforced concrete beams that had been in service for 35 years with the static failure tests, the effectiveness of the method was verified.
文摘The application of tunneling machine to Chinese underground engineering construction is outlined,and its future prospect is forecasted in the light of the requirements for Chinese underground engineering construction in the 21st century. Further suggestion is put forward on the effective use of tunneling machine.
文摘In the maintenance work of highway and bridge engineering structures,the fracture delay of high-strength bolts is a content that needs to be focused on and researched.Based on this,the paper analyzes the fracture delay of high-strength bolts in highway bridge maintenance,including an overview of the fundamental research on fracture delay and related specific studies.It is hoped that this study can provide scientific reference for the reasonable maintenance of high-strength bolts,so as to ensure the overall maintenance effect of highway bridge projects.