期刊文献+
共找到2,143篇文章
< 1 2 108 >
每页显示 20 50 100
An Rapid Assessment Method for Bearing Capacity of RC Girder Bridges Based on Residual Strain
1
作者 Ming Zhong 《Open Journal of Civil Engineering》 2024年第2期225-239,共15页
In order to realize the in-situ evaluation of reinforced concrete bridges subjected to fatigue for a long time or after earthquake, an evaluation method for cumulative damage of concrete structures based on unloading ... In order to realize the in-situ evaluation of reinforced concrete bridges subjected to fatigue for a long time or after earthquake, an evaluation method for cumulative damage of concrete structures based on unloading elastic modulus was proposed. First, according to the concrete stress-strain curve and the statistical relationship between residual strain and cumulative strain, the calculation method of static equivalent strain and residual strain concrete based on unloading elastic modulus and the method for estimating the strength of concrete after damage were proposed. The detailed steps of field test and analysis and the practical damage indicators of residual strain were given. Then, the evaluation method of existing stress and strain of Reinforced Concrete Bridge under dead load and the concept of “equivalent dead load bending moment” were put forward. On this basis, the paper analyzed the root cause of the decrease of bearing capacity of Reinforced Concrete Bridge after fatigue damage, and pointed out that the equivalent strain or residual strain of reinforced concrete increases under the fatigue effect, which led to the decreasing of actual live moment and deformation performance while the ultimate load-carrying capacity remained constant or very little decrease. The evaluation method of structure residual capacity was given, and through comparative analysis of eight T reinforced concrete beams that had been in service for 35 years with the static failure tests, the effectiveness of the method was verified. 展开更多
关键词 bridge Engineering Reinforced Concrete Fatigue Damage Unloading Elastic Modulus Residual Strain Residual Bearing capacity
下载PDF
Analysis of the Application of Static Load Test in Bridge Bearing Capacity Testing
2
作者 Wei Fu Bo Liu 《Journal of Architectural Research and Development》 2024年第3期36-41,共6页
This article uses real engineering projects as examples to analyze how static load test technology is applied in testing the bridge-bearing capacity.The analysis covers aspects such as testing section layout,test load... This article uses real engineering projects as examples to analyze how static load test technology is applied in testing the bridge-bearing capacity.The analysis covers aspects such as testing section layout,test load and efficiency coefficient,loading plan,evaluation optimization,test result modification,and result evaluation.The aim is to support the accurate detection and evaluation of bridge-bearing capacity. 展开更多
关键词 bridge engineering Bearing capacity Static load test Loading plan Test evaluation
下载PDF
Analysis of Bridge-Bearing Capacity Detection and Evaluation Technology
3
作者 Wei Fu Bo Liu 《Journal of World Architecture》 2024年第2期129-133,共5页
A bridge project is taken as an example to analyze the application of bearing capacity detection and evaluation.This article provides a basic overview of the project,the application of bearing capacity detection techn... A bridge project is taken as an example to analyze the application of bearing capacity detection and evaluation.This article provides a basic overview of the project,the application of bearing capacity detection technology,and the bearing capacity assessment analysis.It is hoped that this analysis can provide a scientific reference for the load-bearing capacity detection and evaluation work in bridge engineering projects,thereby achieving a scientific assessment of the overall load-bearing capacity of the bridge engineering structure. 展开更多
关键词 bridge engineering structure Bearing capacity Calculation model Detection points Quantitative standards
下载PDF
Structure Bearing Capacity Testing and Evaluation of Existing Bridges
4
作者 Huigeng Liu Zonglin Zhou 《Journal of World Architecture》 2023年第1期30-34,共5页
The bearing capacity testing and evaluation of the existing bridge engineering structure is not only the key to clarify its structural quality and safety performance,but it also can lay a solid foundation for subseque... The bearing capacity testing and evaluation of the existing bridge engineering structure is not only the key to clarify its structural quality and safety performance,but it also can lay a solid foundation for subsequent repairs and maintenance work.To ensure the bearing capacity,durability and reliability of existing bridges,this paper analyzes the importance and methods of testing and evaluation of structural bearing capacity of a bridge.This analysis aims to provide scientific reference for the quality assessment and subsequent repair and maintenance of existing bridge engineering structures. 展开更多
关键词 Existing bridge bridge structure Bearing capacity detection Bearing capacity evaluation
下载PDF
METHOD FOR BRIDGE BEARING CAPACITY ASSESSMENT BASED ON ANALYTIC HIERARCHY PROCESS 被引量:2
5
作者 张丽芳 艾军 《Transactions of Nanjing University of Aeronautics and Astronautics》 EI 2009年第3期235-241,共7页
By analyzing the existing methods for the bridge bearing capacity assessment, an analytic hierarchy pro cess estimation model with a variable weight and fuzzy description is proposed based on the nondestructive infor ... By analyzing the existing methods for the bridge bearing capacity assessment, an analytic hierarchy pro cess estimation model with a variable weight and fuzzy description is proposed based on the nondestructive infor mation. Considering the actual strength, the bearing capacity is first calculated from its design state, and then modified based on the detection information. The modification includes the section reduction and the structure deterioration. The section reduction involves the concrete section and the steel cross-section reduction. The structure deterioration is decided by six factors, i.e. , the concrete surface damage, the actual concrete strength, the steel corrosion electric potential, the chloride ion content, the carbonization depth, and the protective layer depth. The initial weight of each factor is calculated by the expert judgment matrix using an analytic hierarchy process. The consistency approximation and the error transfer theory are used. Then, the variable weight is in- troduced to expand the influences of factors in the worse state. Finally, an actual bridge is taken as an example to verify the proposed method. Results show that the estimated capacity agrees well with that of the load test, thus the method is objective and credible 展开更多
关键词 bridgeS bearing capacity fuzzy rules variable weight analytic hierarchy process
下载PDF
Numerical analysis on bearing capacity of middle pylon caisson foundation of Taizhou Bridge 被引量:1
6
作者 Wang Jun Shao Guojian +1 位作者 Hu Feng Gu Lijun 《Engineering Sciences》 EI 2012年第3期44-48,共5页
Because of the computation difficulty of the beating capacity of large underwater caisson foundation on thick overburden layer ground, the geotechnieal software FLAC3D was utilized in the 3D numerical analysis on the ... Because of the computation difficulty of the beating capacity of large underwater caisson foundation on thick overburden layer ground, the geotechnieal software FLAC3D was utilized in the 3D numerical analysis on the bearing capacity of middle pylon foundation. From the computational results, it is concluded that the caisson foundation has a good bearing capacity on thick overburden layer ground and the beating capacity can be improved assuming that the soil near the area of basal comer is reinforced. 展开更多
关键词 Taizhou bridge caisson foundation bearing capacity numerical analysis
下载PDF
Analysis on Bearing Capacity of Tunnel-Type Anchorage of a Long-Span Suspension Bridge
7
作者 Zhu Yu Wei Jun +2 位作者 Yang Manjuan Li Hao Liu Hongqing 《Journal of China University of Geosciences》 SCIE CSCD 2005年第3期277-282,共6页
Due to complicated rock structure and environment, a prototype test for a tunnel-type anchorage is infeasible. Based on the rock mass parameters from tests, a three-dimensional (3D) elastoplastic analysis was perfor... Due to complicated rock structure and environment, a prototype test for a tunnel-type anchorage is infeasible. Based on the rock mass parameters from tests, a three-dimensional (3D) elastoplastic analysis was performed to simulate the influence of the construction procedure of Siduhe bridge with tunnel-type anchorage (TTA) in Hubei Province, China. The surrounding rock and concrete anchorage body were simulated by 8 nodes 3D brick elements. The geostatic state of the complex geometric structure was established with initial data. The in-situ concrete casting of the anchorage body and excavation of the rock mass were simulated by tetrahedral shell elements. The results show that the surrounding rock is in an elastic state under the designed cable force. The numerical overloading analysis indicates that the capacity of the surrounding anchorage is 7 times that of the designed cable force. The failure pattern shows that two anchorage bodies would be pulled out in the end. The maximum shear stress appears 10 m before the back anchorage face. The maximum range influenced by the TTA under ultimate loads is about 16 m. 展开更多
关键词 tunnel-type anchorage suspension bridge elasto-plastic analysis bearing capacity
下载PDF
Comparison of seismic capacity/demand ratios of two kinds of foundation schemes of Taizhou Bridge
8
作者 Zhao Yi Peng Tianbo Han Lei 《Engineering Sciences》 EI 2012年第3期26-32,共7页
Pile group foundation and caisson foundation are two common foundation schemes of long-span bridges, and the seismic performances of the two kinds of foundations are different. Taking Taizhou Bridge as an example, whi... Pile group foundation and caisson foundation are two common foundation schemes of long-span bridges, and the seismic performances of the two kinds of foundations are different. Taking Taizhou Bridge as an example, which is the first kilometer level three-pylon two-span suspension bridge in the world, two foundation schemes are designed for the middle pylon, and two whole bridge models with two different foundation schemes of the middle pylon are established respectively in this paper. The effects of foundation-soil interaction are simulated by equivalent linear soil springs whose stiffnesses are calculated according to m method. Seismic capacity/demand ratios of the two models are calculated. The following conclusions can be drawn: the weak positions of the two schemes are not the same; if caisson foundation is adopted for the middle pylon, the weak position is the bearing capacity of the middle pylon foundation, while if pile group foundation is adopted for the middle pylon, the weak position is the bearing capacity of the side pylon foundation. 展开更多
关键词 Taizhou bridge FOUNDATION capacity/demand ratio
下载PDF
Seismic Assessment of Existing Bridges: Kukesi Bridge
9
作者 Arian Lako Shkëlqim Gjevori +1 位作者 Xhorxhia Lako Edvin Paçi 《Journal of Civil Engineering and Architecture》 2023年第1期12-23,共12页
In this presentation,we are showing the application of methods for assessing the structural capacity of existing reinforced concrete bridges,constructed before the application of European Norms.The safety check presen... In this presentation,we are showing the application of methods for assessing the structural capacity of existing reinforced concrete bridges,constructed before the application of European Norms.The safety check presented in the various guidelines includes a structural non-linear analysis,followed by checking especially the deformations and resistance of all piers.In most cases,the superstructure is not significantly involved in the seismic response of the structure,then continues with the controls of the substructure(piles and facades)and the foundations,as well as with the systems of the connections of the structure and those of the interconnection between the structural elements.The structural model reflects the real conditions of the structure,the structural model must contain all the relevant degrees of freedom,characterizing the dynamic response of the structure,the inertia characteristics i.e.the stiffness of the structure,and the superstructure connections.For the case of non-linear analysis,the structural model must be able to follow the development of stresses and deformations of the structure beyond the elastic phase caused by the formation of an increasing number of plastic zones. 展开更多
关键词 bridge capacity push over time history
下载PDF
Study on seismic performance enhancement in bridges based on factorial analysis 被引量:1
10
作者 Abey ET Somasundaran TP Sajith AS 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2017年第1期181-198,共18页
The seismic performance of bridges depends on the ductile behavior of its column, as the deck and other substructural components except pile foundations are normally designed to be elastic to facilitate bridge retrofi... The seismic performance of bridges depends on the ductile behavior of its column, as the deck and other substructural components except pile foundations are normally designed to be elastic to facilitate bridge retrofitting. Codes such as AASHTO, Caltrans, IRC: 112 etc. give guidelines for the seismic performance enhancement of columns through ductile detailing. In the present study, a methodology for the seismic performance enhancement of bridges is discussed by using a "Parameter-Based Influence Factor" (PIF) developed from factorial analysis. The parameters considered in the factorial analysis are: percentage of longitudinal reinforcement (Pt), compressive strength of concrete (f'c), yield strength of steel (fy), spacing of lateral ties (5) and column height (/4). The influence of each parameter and their combination on the limit states considered is estimated. Pushover analysis is used to evaluate the capacity of columns, considering shear failure criteria. A total of 243 (35 combinations) analysis results are compiled to develop 'PIF' used in the performance enhancement process. The study also encompasses other sub-objectives such as evaluating the discrepancies in using the Importance Factor (/) in designing bridges of varied functional importance; and estimating the aspect ratio and slenderness ratio values of bridge columns for its initial sizing. 展开更多
关键词 bridge retrofitting column capacity factorial analysis performance enhancement seismic performance
下载PDF
The Detection Evaluation and Reinforcement Research of Kankan River Bridge
11
作者 Juxian Liu 《Engineering(科研)》 2015年第7期462-468,共7页
This design is about Chongqing Wanzhou district KanKan river crossing test evaluation and reinforcement renovation. The bridge is an open spandrel stone arch bridge. After years of operating, defects arise from differ... This design is about Chongqing Wanzhou district KanKan river crossing test evaluation and reinforcement renovation. The bridge is an open spandrel stone arch bridge. After years of operating, defects arise from different parts. To verify whether the bridge meets the bearing capacity of highway grade I standard, this design firstly evaluates the bridge through the apparent diseases. Then it uses Midas/Civil to calculate the bearing capacity of lateral control section for Zhou Jiaba arch foot, L/4 and arch section. Using Midas/Civil control section load calculation, load test plan is made. In the end, by increasing cross-section method, the bridge reinforcement maintenance plan is made;that is increasing abdominal 26 cm concrete layer in the main arch ring of arch so that the bridge meets grade I highway capacity requirements. 展开更多
关键词 STONE ARCH bridge Inspection and EVALUATION Bearing capacity MIDAS/CIVIL REINFORCEMENT and Reconstruction
下载PDF
Seismic performance evaluation for super-long span cable-stayed bridges
12
作者 Ye Aijun Wu Shouchang 《Engineering Sciences》 EI 2009年第1期23-29,共7页
Based on the capacity/demand(C/D)analysis of bridge components,and life cycle and performance based seismic design principles,a practical approach is developed for the seismic performance evaluation of super-long span... Based on the capacity/demand(C/D)analysis of bridge components,and life cycle and performance based seismic design principles,a practical approach is developed for the seismic performance evaluation of super-long span cable-stayed bridges.According to the approach,the seismic performance evaluation of the Sutong Bridge,which is a cable-stayed bridge with a main span of 1 088 m,is completed,and the practicality of the approach is validated.The earthquake resistance level for super-long span cable-stayed bridges is discussed,including the earthquake level,its corresponding structural performance and check indices.And a set of formula for capacity/demand ratio calculation of bridge components is proposed. 展开更多
关键词 super-long span cable-stayed bridges seismic performance capacity/demand analysis
下载PDF
The application of interface grouting technology in boredpile of bridge construction
13
作者 Jianjie Ai 《绿色环保建材》 2019年第2期169-169,171,共2页
The bored cast-in-place pile is the common foundation of bridge in recent years, but during the boring, the slurry effect the quality of pile a lot. Interface grouting is the method of injecting the grout to the base ... The bored cast-in-place pile is the common foundation of bridge in recent years, but during the boring, the slurry effect the quality of pile a lot. Interface grouting is the method of injecting the grout to the base of pile through the embedded pipes after its concrete finished, to increase carrying capacity and reduce the settlement. This article will introduce the method to engineers in constuctions. 展开更多
关键词 INTERFACE GROUTING BEARING capacity ENGINEER INITIAL CRACKING bridge
下载PDF
How Dose Future Look for Steel Bridges: Based on State of the Art of Corrosions
14
作者 Tetsuya Yabuki Tetsuhiro Shimozato +2 位作者 Yasunori Arizumi Hiroaki Matsusita Shuhei Yamasita 《材料科学与工程(中英文A版)》 2013年第12期793-805,共13页
关键词 智能桥梁结构 钢桥 腐蚀 状态 艺术 剂量 压力表
下载PDF
型钢-UHPC轻型组合桥面板及其抗弯性能研究 被引量:2
15
作者 邵旭东 蔡文涌 +1 位作者 曹君辉 刘梦麟 《土木工程学报》 EI CSCD 北大核心 2024年第6期152-168,共17页
正交异性钢桥面是目前800m以上国内外特大跨径钢桥的唯一选择,主因是自重轻、强度高、架设方便。但其存在疲劳开裂风险大、运维成本高的缺点。随着高性能材料UHPC的研发和应用,为构建自重轻、病害少、经济性好的桥面新结构提供了可能性... 正交异性钢桥面是目前800m以上国内外特大跨径钢桥的唯一选择,主因是自重轻、强度高、架设方便。但其存在疲劳开裂风险大、运维成本高的缺点。随着高性能材料UHPC的研发和应用,为构建自重轻、病害少、经济性好的桥面新结构提供了可能性。经过多年研究,作者提出一种新型桥面板结构——型钢-UHPC轻型组合桥面结构,将型钢、钢板条与UHPC组合,桥面板的形成无任何板件焊接,因而具有高抗疲劳性,且与传统钢桥面相比,自重持平、造价减半,可作为除“正交异性钢桥面”外的“第二种”大跨径钢桥的桥面结构方案。该文研究这种轻型组合桥面板预制板及横向接缝的抗弯性能,制作4个条带模型(包括2个预制板试件和2个接缝试件),开展三点弯曲的横向接缝负弯矩试验和预制板正弯矩试验,并对试验结果进行分析;基于“条带法”建立预制板试件极限承载力计算模型,提出接缝试件的UHPC开裂名义拉应力计算方法;基于某斜拉桥应用实例,进行整体计算和局部计算,验证新型组合桥面结构在实桥上应用的可行性。研究结果表明:(1)型钢与UHPC间在极限状态前相对滑移非常小,具有良好的协同受力性能;(2)预制板试件的正弯矩极限承载力以型钢屈服控制,而接缝试件负弯矩极限承载力以UHPC开裂和加密钢筋断裂控制;(3)接缝试件的“T形”接缝、加密钢筋、燕尾形的企口、交错式切割型钢钢条等构造设计对接缝整体抗弯拉性能有很好的提高效果;(4)预制板试件极限承载力计算模型所得计算值与试验值吻合良好,该模型搭配名义拉应力计算方法,可帮助工程实际问题的设计与应用;(5)试验结果与实桥的有限元计算值相比,新型桥面结构均有1.3倍以上的安全系数,新型组合桥面应用于实桥具有可行性。 展开更多
关键词 桥梁工程 型钢-UHPC组合桥面结构 三点弯曲试验 接缝构造 承载能力 裂缝宽度
下载PDF
高速铁路系杆拱桥检测方法及应用 被引量:1
16
作者 吴涛 陈勇 陈朝辉 《铁道建筑》 北大核心 2024年第1期81-85,共5页
根据高速铁路系杆拱桥的结构特点、受力特点和养护条件,研究制定了外观缺损检测、吊杆体系专项检测、结构姿态检测、材料性能检测、动力特性测试、承载能力检算等测试内容及采用方法,并应用于京沪高速铁路一座实桥检测中。检测结果表明... 根据高速铁路系杆拱桥的结构特点、受力特点和养护条件,研究制定了外观缺损检测、吊杆体系专项检测、结构姿态检测、材料性能检测、动力特性测试、承载能力检算等测试内容及采用方法,并应用于京沪高速铁路一座实桥检测中。检测结果表明:该桥除外观上存在少量病害外,结构整体受力性能良好,相对于桥梁建成初期没有明显的变化,验证了本文检测方法的有效性和可实施性。 展开更多
关键词 高速铁路系杆拱桥 外观缺损 吊杆 动力特性 承载能力
下载PDF
粘铝合金板加固RC梁抗弯性能试验及正截面承载力 被引量:1
17
作者 黄海林 何培根 +1 位作者 周福林 谭永杰 《公路交通科技》 CAS CSCD 北大核心 2024年第1期105-115,125,共12页
为了探讨铝合金板厚度与端部U形铝合金箍板构造对RC梁破坏机理及抗弯性能的影响,对16根铝合金板加固RC梁进行了4点弯曲静力加载试验。在试验梁底铝合金板的表面以及试验梁跨中截面的顶面、侧面粘贴应变片,在试验梁底跨中、梁顶两端支座... 为了探讨铝合金板厚度与端部U形铝合金箍板构造对RC梁破坏机理及抗弯性能的影响,对16根铝合金板加固RC梁进行了4点弯曲静力加载试验。在试验梁底铝合金板的表面以及试验梁跨中截面的顶面、侧面粘贴应变片,在试验梁底跨中、梁顶两端支座布置百分表。为了推导铝合金板加固RC梁的正截面承载力计算式,基于试验得到的破坏机理,通过引入6个基本假定,分析了5种不同破坏模式的相对受压区高度。建立了各破坏模式下铝合金板加固RC梁的正截面承载力计算式,并将其与引入文献中的试验结果进行了对比分析。结果表明:试件破坏形态包括适筋破坏、端部铝合金板与结构胶剥离、端部铝合金板与梁剥离及中部铝合金板剥离4种情况;当端部设置U形铝合金箍板时,可有效抑制端部铝合金板发生剥离,使钢筋与铝合金板的材料性能得到充分发挥,试件承载力与延性明显提升;当铝合金板厚度分别为2~6 mm时,试件承载力随铝合金板厚度的增加而提高;端部设置U形铝合金箍板可有效防止端部铝合金板发生剥离,但试件仍可能会出现中部铝合金板剥离现象;当试件出现适筋破坏特征时,试件抗弯承载力的计算值与试验值比值均在1以下。本研究所提计算式具有明显的规律性和适用性,可为工程实际设计提供参考。 展开更多
关键词 桥梁工程 抗弯加固 粘铝合金板加固 RC梁 正截面承载力
下载PDF
不同锈蚀程度下栓钉连接件的抗剪性能分析
18
作者 王亮 魏欢博 +2 位作者 高亚杰 任万敏 卫星 《深圳大学学报(理工版)》 CSCD 北大核心 2024年第1期58-65,共8页
为研究栓钉连接件锈蚀条件下的抗剪性能退化规律,建立ABAQUS有限元模型进行数值模拟.针对均匀圆环、受压区半环、受拉区半环及拉压区半环4种不同的锈蚀分布形态,考虑不同的锈蚀高度、锈蚀深度进行数值分析.结果表明,当锈蚀深度相同时,4... 为研究栓钉连接件锈蚀条件下的抗剪性能退化规律,建立ABAQUS有限元模型进行数值模拟.针对均匀圆环、受压区半环、受拉区半环及拉压区半环4种不同的锈蚀分布形态,考虑不同的锈蚀高度、锈蚀深度进行数值分析.结果表明,当锈蚀深度相同时,4种锈蚀分布形态的栓钉抗剪承载力随锈蚀高度的增加而降低,在锈蚀高度为10 mm时降到最小,且锈蚀深度越大,承载力降低程度也越大;当锈蚀高度相同时,随着锈蚀深度的增加,抗剪承载力和抗剪刚度基本上呈线性下降趋势;当锈蚀高度和深度相同时,均匀圆环锈蚀的抗剪承载力和刚度的降低程度最大,相比其他3种情况降低60%左右,受压区半环锈蚀的抗剪承载力和刚度的降低程度最小.研究成果可为钢混组合结构栓钉连接件耐久性设计提供参考. 展开更多
关键词 桥梁工程 栓钉连接件 锈蚀 抗剪承载力 抗剪刚度 有限元分析
下载PDF
压弯剪扭复合作用下灌浆套筒装配式RC墩的抗震性能
19
作者 林友勤 赖仕永 +1 位作者 夏樟华 王达荣 《湖南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2024年第3期182-192,共11页
随着城市交通的快速发展,对其建设要求越来越高,城市桥梁主要为匝道桥、斜交桥等非规则桥梁.为得到压弯剪扭等复合地震作用下装配式墩的损伤机理和滞回特性,进行了灌浆套筒连接(Grouting Sleeve,GS)、灌浆套筒和钢管混凝土剪力键组合连... 随着城市交通的快速发展,对其建设要求越来越高,城市桥梁主要为匝道桥、斜交桥等非规则桥梁.为得到压弯剪扭等复合地震作用下装配式墩的损伤机理和滞回特性,进行了灌浆套筒连接(Grouting Sleeve,GS)、灌浆套筒和钢管混凝土剪力键组合连接(Grouting Sleeve and Steel-tube,GSS)装配式墩和钢筋混凝土现浇(Reinforced Concrete,RC)墩等三种桥墩在压弯剪扭复合作用下的拟静力试验.结合现有混凝土结构设计规范计算剪扭相关曲线,并与试验结果进行对比,分析装配式墩复合荷载作用下的剪扭承载能力.结果表明:GS构件与RC构件以压弯扭破坏为主,而插入钢管剪力键的GSS构件则发生塑性铰上移,呈现出剪扭破坏的特征.GS构件和RC构件具有较好的弯曲耗能能力,增加钢管剪力键的GSS构件则可以提升抗弯承载力.装配式墩接头导致其整体性较弱,GS构件和GSS构件抗扭承载力小于RC构件.各构件在复合荷载作用下的剪扭相关关系接近规范中的1/4圆理论曲线,研究结果可以为灌浆套筒连接装配式墩在压弯剪扭复合作用下的抗震性能分析提供参考. 展开更多
关键词 桥梁工程 装配式墩 灌浆套筒连接 拟静力试验 压弯剪扭 承载力 延性
下载PDF
半预制预应力UHPC-S-NC盖梁静力性能试验及理论分析
20
作者 李立峰 谢坤 +3 位作者 刘慈军 邵旭东 陈涛 唐嘉豪 《湖南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2024年第7期177-191,共15页
为解决大悬臂盖梁吊装重量大且难以实现预制拼装的技术难题,利用超高性能混凝土(Ultra-High Performance Concrete,UHPC)优异的力学性能,提出了采用由UHPC、钢板和型钢(Steel,S)制作的槽形组合结构作为永久模板,架设就位后浇筑普通混凝... 为解决大悬臂盖梁吊装重量大且难以实现预制拼装的技术难题,利用超高性能混凝土(Ultra-High Performance Concrete,UHPC)优异的力学性能,提出了采用由UHPC、钢板和型钢(Steel,S)制作的槽形组合结构作为永久模板,架设就位后浇筑普通混凝土(Normal Concrete,NC)的新型半预制预应力UHPC-S-NC盖梁.为研究其抗裂性能、刚度并对其安全性进行评估,结合实际工程,设计一片1∶2.5的大比例缩尺模型并进行全过程静力加载测试,获得了试验梁的变形特征、开裂荷载、裂缝开展、分布规律和应变等关键试验数据.分析了试验梁裂缝分布和应变发展规律;考虑材料塑性应力-应变关系,提出了结构UHPC层和NC层的开裂弯矩计算模式和计算方法;并根据截面平衡条件提出了组合结构的抗弯承载力计算模式,同时,依据规范对结构抗剪承载力的计算模式进行了探究.结果表明:新型组合盖梁结构具有施工快捷、装配化程度高等特点;开裂弯矩的计算结果与试验值吻合较好;采用平衡条件和叠加法评估结构的承载力,新型盖梁结构具有足够的承载能力,结果偏于安全;针对实际工程提出了一些具体的结构设计和施工的建议.研究成果可为半预制盖梁的应用提供参考. 展开更多
关键词 桥梁 盖梁 半预制 免拆模 抗裂性能 承载力
下载PDF
上一页 1 2 108 下一页 到第
使用帮助 返回顶部