Time-dependent characteristics(TDCs)have been neglected in most previous studies investigating the deviation mechanisms of bridge pile foundations and evaluating the effectiveness of preventive measures.In this study,...Time-dependent characteristics(TDCs)have been neglected in most previous studies investigating the deviation mechanisms of bridge pile foundations and evaluating the effectiveness of preventive measures.In this study,the stress-strain-time characteristics of soft soils were illustrated by consolidation-creep tests based on a typical engineering case.An extended Koppejan model was developed and then embedded in a finite element(FE)model via a user-material subroutine(UMAT).Based on the validated FE model,the time-dependent deformation mechanism of the pile foundation was revealed,and the preventive effect of applying micropiles and stress-release holes to control the deviation was investigated.The results show that the calculated maximum lateral displacement of the cap differs from the measured one by 6.5%,indicating that the derived extended Koppejan model reproduced the deviation process of the bridge cap-pile foundation with time.The additional load acting on the pile side caused by soil lateral deformation was mainly concentrated within the soft soil layer and increased with the increase in load duration.Compared with t=3 d(where t is surcharge time),the maximum lateral additional pressure acting on Pile 2#increased by approximately 47.0%at t=224 d.For bridge pile foundation deviation in deep soft soils,stress-release holes can provide better prevention compared to micropiles and are therefore recommended.展开更多
Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influe...Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influence each other,especially when subway construction requires passing under bridges.In such cases,pile foundation replacement technology is often necessary.However,this technology is highly specialized,with a lengthy and risky construction period,and high costs.Personnel must be proficient in key technical aspects to ensure construction quality.This article discusses the technical principle,construction process,and core technology of pile foundation replacement,along with the application of this technology in subway tunnel crossing bridge projects,supported by engineering examples for reference.展开更多
Currently,the pile foundation underpinning technology is widely used when underground transportation infrastructure passes through existing buildings or structures in urban areas.This study aims to investigate stress ...Currently,the pile foundation underpinning technology is widely used when underground transportation infrastructure passes through existing buildings or structures in urban areas.This study aims to investigate stress transfer mechanisms in pile foundations during an underpinning process as well as the influence of shield tunnel construction on pile stability.To this end,the pile foundation underpinning technology used in China’s Shenzhen Metro Line 10 crossing through the bridge pile foundation group of the Guangzhou-Shenzhen highway was analyzed in detailed.The refined numerical simulation of the pile foundation underpinning and shield tunnel construction processes were conducted using the fast Lagrangian analysis of continua in 3 dimensions(FLAC3D)software.The results demonstrate that after the pile foundation underpinned,the previous bridge load system of bridge panel→pile foundation→bearing soil would transform into a bridge panel→existing pile foundation→new underpinning pile→deep bearing soil stratum structure.The overlying load on the underpinned pile could be effectively transferred to a new underpinning pile.In the process of underpinning and tunnel excavation,the settlement and deformation of the foundation can improve the tip resistance and shaft friction of piles,which in turn,can reduce the maximum principal stress in the pile foundation group.The deformation of the bridge pile foundation is mainly caused by ground loss and excavation disturbance generated during shield tunneling as the settlement induced by pile foundation underpinning accounts for approximately 20%-30% of the total settlement.The reduction effects of settlement deformation,lateral displacement,and principal stress are mainly manifested in underpinning piles,while the non-underpinning pile exhibits minimal variation.Meanwhile,the deformation of the segment lining structure of the shield tunnel primarily occurs near the underpinning area of the pile foundation,and it is mainly settlement deformation with a small horizontal displacement.展开更多
A shaking table test for a bridge foundation reinforced by anti-slide piles on a silty clay landslide model with an inclined interlayer was performed.The deformation characteristics of the bridge foundation piles and ...A shaking table test for a bridge foundation reinforced by anti-slide piles on a silty clay landslide model with an inclined interlayer was performed.The deformation characteristics of the bridge foundation piles and anti-slide piles were analyzed in different loading conditions.The dynamic response law of a silty clay landslide with an inclined interlayer was summarized.The spacing between the rear anti-slide piles and bridge foundation should be reasonably controlled according to the seismic fortification requirements,to avoid the two peaks in the forced deformation of the bridge foundation piles.The“blocking effect”of the bridge foundation piles reduced the deformation of the forward anti-slide piles.The stress-strain response of silty clay was intensified as the vibration wave field appeared on the slope.Since the vibration intensified,the thrust distribution of the landslide underwent a process of shifting from triangle to inverted trapezoid,the difference in the acceleration response between the bearing platform and silty clay landslide tended to decrease,and the spectrum amplitude near the natural vibration frequency increased.The rear anti-slide piles were able to slow down the shear deformation of the soil in front of the piles and avoid excessive acceleration response of the bridge foundation piles.展开更多
Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using th...Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using the Mesri creep model to describe the soil characteristics and the Mindlin-Geddes method considering pile diameter to calculate the vertical additional stress of pile bottom.A program named CPPS was designed for this method to calculate the post-construction settlement of a high-speed railway bridge pile foundation.The result indicates that the post-construction settlement in 100 years meets the requirements of the engineering specifications,and in the first two decades,the post-construction settlement is about 80% of its total settlement,while the settlement in the rest eighty years tends to be stable.Compared with the measured settlement after laying railway tracks,the calculational result is closed to that of the measured,and the results are conservative with a high computational accuracy.It is noted that the method can be used to calculate the post-construction settlement for the preliminary design of high-speed railway bridge pile foundation.展开更多
At present,shield tunneling often needs to pass through a large number of bridge pile foundations.However,there are few studies on the influence of shield tunneling on adjacent pile foundations by combining with groun...At present,shield tunneling often needs to pass through a large number of bridge pile foundations.However,there are few studies on the influence of shield tunneling on adjacent pile foundations by combining with groundwater seepage.Based on Winkler model,the calculation equations of shield tunneling on vertical and horizontal displacement of adjacent bridge pile are derived.Meanwhile,full and part three-dimensional finite element models are established to analyze the trend of bridge pier settlement,ground surface settlement trough,vertical and horizontal displacement of the pile and pile stress under three calculation conditions,i.e.,not considering groundwater effect,considering stable groundwater effect and fluid-soil interaction.The results show that the calculated value is small when the effect of groundwater is not considered;the seepage velocity of the soil above the excavation face is faster than that of the surrounding soil under fluid-soil interaction,and after the shield passing,the groundwater on both sides shows a flow trend of“U”shape on the ground surface supplying to the upper part of the tunnel;the vertical displacement of the pile body is bounded by the horizontal position of the top of the tunnel,the upper pile body settles,and the lower pile body deforms upward.The horizontal displacement of pile body presents a continuous“S”shape distribution,causing stress concentration near the tunnel.The calculated results of fluid-soil interaction are in good agreement with the field measured data and accord with the actual situation.展开更多
The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis,and the corresponding loading function was presented.One-dimensiona...The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis,and the corresponding loading function was presented.One-dimensional consolidation equation of elastic multilayered soils was then established with single drainage or double drainages under multilevel loading.Moreover,the formulas for calculating effective stress and settlement were derived from the Laplace numerical inversion transform.The three-dimensional composite analysis method of bridge pile group was improved,where the actual load conditions of pile foundation could be simulated,and the consolidation characteristics of soil layers beneath pile were also taken into account.Eventually,a corresponding program named LTPGS was developed to improve the calculation efficiency.The comparison between long-term settlement obtained from the proposed method and the in-situ measurements of pile foundation was illustrated,and a close agreement is obtained.The error between computed and measured results is less than 1 mm,and it gradually reduces with time.It is shown that the proposed method can effectively simulate the long-term settlement of pile foundation and program LTPGS can provide a reliable estimation.展开更多
With the rapid development of my country’s economy, the demand for infrastructure construction is also increasing. However, in most areas of China, the terrains are mountainous and hilly. Some projects have to be bui...With the rapid development of my country’s economy, the demand for infrastructure construction is also increasing. However, in most areas of China, the terrains are mountainous and hilly. Some projects have to be built on steep slopes. Choosing viaducts or half-bridges on high-steep slopes is not only conducive to the protection of the surrounding environment, but also conducive to the stability of the slope. Bridges usually choose the form of pile </span><span style="font-family:Verdana;">foundation-high pier bridge. This paper uses numerical simulation to study and analyze the bridge pile foundation of the slope section. Relying on actual</span><span style="font-family:Verdana;"> engineering, use the finite element software ABAQUS6.14 to establish a three-dimensional finite element model to study the bearing mechanism and mechanical characteristics of the pile foundation under vertical load, horizontal load and inclined load, discuss the influence of the nature of the soil around the pile and the stiffness of the pile body on the deformation and internal force of the bridge pile foundation in the slope section. The analysis results show that the horizontal load has a great influence on the horizontal displacement of the pile, but has a small influence on the vertical displacement, and the vertical load is just the opposite. Inclined load has obvious “p-Δ” effect. The increase in soil elastic modulus and pile stiffness will reduce the displacement of the pile foundation, but after reaching a certain range, the displacement of the pile foundation will tend to be stable. Therefore, in actual engineering, if the displacement of the pile foundation fails to meet the requirements, the hardness of the soil and the stiffness of the pile can be appropriately increased, but not blindly.展开更多
In the process of piling ,there are many various defects in foundation pile of bridge such as mud-bearing,sediment-bearing, isolation, honeycomb, broken piles, and so on, showing physical and mechanical features of lo...In the process of piling ,there are many various defects in foundation pile of bridge such as mud-bearing,sediment-bearing, isolation, honeycomb, broken piles, and so on, showing physical and mechanical features of low-density and low-intensity. In fact, by using the comprehensive detection of acoustic transmission method, the reflected wave method as well as drill coring sample method, and the rational utilization of engineering geological condition in field, the characteristics, size and location of common defects of foundation pile of bridge can be accurately detected and judged and the integrity of piles and the quality of concrete can be impersonally estimated.comprehensive detecting and analyzing methods on this kind of piles are introduced briefly. The physical characters of defects and basic features of detecting curves and their corresponding relation are emphasized, and causes are analyzed in in detail in this paper.展开更多
基金supported by the Science and Technology Research Project of Jiangxi Education Department(Nos.GJJ2201509,GJJ2201501)the National Natural Science Foundation of China(Nos.51878671,51969018,52378344)+1 种基金the Natural Science Foundation of Jiangxi Province(No.20224BAB204076)the Young Scientific and Technological Talents Sponsorship Project in Ganpo Juncai Support Program(No.2023QT08).
文摘Time-dependent characteristics(TDCs)have been neglected in most previous studies investigating the deviation mechanisms of bridge pile foundations and evaluating the effectiveness of preventive measures.In this study,the stress-strain-time characteristics of soft soils were illustrated by consolidation-creep tests based on a typical engineering case.An extended Koppejan model was developed and then embedded in a finite element(FE)model via a user-material subroutine(UMAT).Based on the validated FE model,the time-dependent deformation mechanism of the pile foundation was revealed,and the preventive effect of applying micropiles and stress-release holes to control the deviation was investigated.The results show that the calculated maximum lateral displacement of the cap differs from the measured one by 6.5%,indicating that the derived extended Koppejan model reproduced the deviation process of the bridge cap-pile foundation with time.The additional load acting on the pile side caused by soil lateral deformation was mainly concentrated within the soft soil layer and increased with the increase in load duration.Compared with t=3 d(where t is surcharge time),the maximum lateral additional pressure acting on Pile 2#increased by approximately 47.0%at t=224 d.For bridge pile foundation deviation in deep soft soils,stress-release holes can provide better prevention compared to micropiles and are therefore recommended.
文摘Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influence each other,especially when subway construction requires passing under bridges.In such cases,pile foundation replacement technology is often necessary.However,this technology is highly specialized,with a lengthy and risky construction period,and high costs.Personnel must be proficient in key technical aspects to ensure construction quality.This article discusses the technical principle,construction process,and core technology of pile foundation replacement,along with the application of this technology in subway tunnel crossing bridge projects,supported by engineering examples for reference.
基金supported by the Key R&D Program of Sichuan Province,China(No.2019YFG0001).
文摘Currently,the pile foundation underpinning technology is widely used when underground transportation infrastructure passes through existing buildings or structures in urban areas.This study aims to investigate stress transfer mechanisms in pile foundations during an underpinning process as well as the influence of shield tunnel construction on pile stability.To this end,the pile foundation underpinning technology used in China’s Shenzhen Metro Line 10 crossing through the bridge pile foundation group of the Guangzhou-Shenzhen highway was analyzed in detailed.The refined numerical simulation of the pile foundation underpinning and shield tunnel construction processes were conducted using the fast Lagrangian analysis of continua in 3 dimensions(FLAC3D)software.The results demonstrate that after the pile foundation underpinned,the previous bridge load system of bridge panel→pile foundation→bearing soil would transform into a bridge panel→existing pile foundation→new underpinning pile→deep bearing soil stratum structure.The overlying load on the underpinned pile could be effectively transferred to a new underpinning pile.In the process of underpinning and tunnel excavation,the settlement and deformation of the foundation can improve the tip resistance and shaft friction of piles,which in turn,can reduce the maximum principal stress in the pile foundation group.The deformation of the bridge pile foundation is mainly caused by ground loss and excavation disturbance generated during shield tunneling as the settlement induced by pile foundation underpinning accounts for approximately 20%-30% of the total settlement.The reduction effects of settlement deformation,lateral displacement,and principal stress are mainly manifested in underpinning piles,while the non-underpinning pile exhibits minimal variation.Meanwhile,the deformation of the segment lining structure of the shield tunnel primarily occurs near the underpinning area of the pile foundation,and it is mainly settlement deformation with a small horizontal displacement.
基金Sichuan Science and Technology Program under Grant No.2023NSFSC0894Major Project of the Science and Technology Research and Development Program of the Ministry of Railways of China under Grant No.Z2012-061。
文摘A shaking table test for a bridge foundation reinforced by anti-slide piles on a silty clay landslide model with an inclined interlayer was performed.The deformation characteristics of the bridge foundation piles and anti-slide piles were analyzed in different loading conditions.The dynamic response law of a silty clay landslide with an inclined interlayer was summarized.The spacing between the rear anti-slide piles and bridge foundation should be reasonably controlled according to the seismic fortification requirements,to avoid the two peaks in the forced deformation of the bridge foundation piles.The“blocking effect”of the bridge foundation piles reduced the deformation of the forward anti-slide piles.The stress-strain response of silty clay was intensified as the vibration wave field appeared on the slope.Since the vibration intensified,the thrust distribution of the landslide underwent a process of shifting from triangle to inverted trapezoid,the difference in the acceleration response between the bearing platform and silty clay landslide tended to decrease,and the spectrum amplitude near the natural vibration frequency increased.The rear anti-slide piles were able to slow down the shear deformation of the soil in front of the piles and avoid excessive acceleration response of the bridge foundation piles.
基金Projects(2009G008-B,2010G018-E-3) supported by Key Projects of China Railway Ministry Science and Technology Research and Development ProgramProject(CX2013B076) supported by Hunan Provincial Innovation Foundation For Postgraduate,China
文摘Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using the Mesri creep model to describe the soil characteristics and the Mindlin-Geddes method considering pile diameter to calculate the vertical additional stress of pile bottom.A program named CPPS was designed for this method to calculate the post-construction settlement of a high-speed railway bridge pile foundation.The result indicates that the post-construction settlement in 100 years meets the requirements of the engineering specifications,and in the first two decades,the post-construction settlement is about 80% of its total settlement,while the settlement in the rest eighty years tends to be stable.Compared with the measured settlement after laying railway tracks,the calculational result is closed to that of the measured,and the results are conservative with a high computational accuracy.It is noted that the method can be used to calculate the post-construction settlement for the preliminary design of high-speed railway bridge pile foundation.
基金Project(52078060)supported by the National Natural Science Foundation of ChinaProject(2020JJ4606)supported by the National Science Foundation of Hunan Province,China+1 种基金Project(18A127)supported by the Key Foundation of Education Department of Hunan Province,ChinaProject(2018IC19)supported by the International Cooperation and Development Project of Double-First-Class Scientific Research in Changsha University of Science&Technology,China。
文摘At present,shield tunneling often needs to pass through a large number of bridge pile foundations.However,there are few studies on the influence of shield tunneling on adjacent pile foundations by combining with groundwater seepage.Based on Winkler model,the calculation equations of shield tunneling on vertical and horizontal displacement of adjacent bridge pile are derived.Meanwhile,full and part three-dimensional finite element models are established to analyze the trend of bridge pier settlement,ground surface settlement trough,vertical and horizontal displacement of the pile and pile stress under three calculation conditions,i.e.,not considering groundwater effect,considering stable groundwater effect and fluid-soil interaction.The results show that the calculated value is small when the effect of groundwater is not considered;the seepage velocity of the soil above the excavation face is faster than that of the surrounding soil under fluid-soil interaction,and after the shield passing,the groundwater on both sides shows a flow trend of“U”shape on the ground surface supplying to the upper part of the tunnel;the vertical displacement of the pile body is bounded by the horizontal position of the top of the tunnel,the upper pile body settles,and the lower pile body deforms upward.The horizontal displacement of pile body presents a continuous“S”shape distribution,causing stress concentration near the tunnel.The calculated results of fluid-soil interaction are in good agreement with the field measured data and accord with the actual situation.
基金Project(2012QNZT050)supported by the Special Fund for Basic Scientific Research of Central Colleges,ChinaProjects(51208518,U1361204,51208519,51108464)supported by the National Natural Science Foundation of China+1 种基金Project supported by the Postdoctoral Foundation of Central South University,ChinaProjects(2013RS4030,2012RS4002)sponsored by Hunan Postdoctoral Scientific Program,China
文摘The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis,and the corresponding loading function was presented.One-dimensional consolidation equation of elastic multilayered soils was then established with single drainage or double drainages under multilevel loading.Moreover,the formulas for calculating effective stress and settlement were derived from the Laplace numerical inversion transform.The three-dimensional composite analysis method of bridge pile group was improved,where the actual load conditions of pile foundation could be simulated,and the consolidation characteristics of soil layers beneath pile were also taken into account.Eventually,a corresponding program named LTPGS was developed to improve the calculation efficiency.The comparison between long-term settlement obtained from the proposed method and the in-situ measurements of pile foundation was illustrated,and a close agreement is obtained.The error between computed and measured results is less than 1 mm,and it gradually reduces with time.It is shown that the proposed method can effectively simulate the long-term settlement of pile foundation and program LTPGS can provide a reliable estimation.
文摘With the rapid development of my country’s economy, the demand for infrastructure construction is also increasing. However, in most areas of China, the terrains are mountainous and hilly. Some projects have to be built on steep slopes. Choosing viaducts or half-bridges on high-steep slopes is not only conducive to the protection of the surrounding environment, but also conducive to the stability of the slope. Bridges usually choose the form of pile </span><span style="font-family:Verdana;">foundation-high pier bridge. This paper uses numerical simulation to study and analyze the bridge pile foundation of the slope section. Relying on actual</span><span style="font-family:Verdana;"> engineering, use the finite element software ABAQUS6.14 to establish a three-dimensional finite element model to study the bearing mechanism and mechanical characteristics of the pile foundation under vertical load, horizontal load and inclined load, discuss the influence of the nature of the soil around the pile and the stiffness of the pile body on the deformation and internal force of the bridge pile foundation in the slope section. The analysis results show that the horizontal load has a great influence on the horizontal displacement of the pile, but has a small influence on the vertical displacement, and the vertical load is just the opposite. Inclined load has obvious “p-Δ” effect. The increase in soil elastic modulus and pile stiffness will reduce the displacement of the pile foundation, but after reaching a certain range, the displacement of the pile foundation will tend to be stable. Therefore, in actual engineering, if the displacement of the pile foundation fails to meet the requirements, the hardness of the soil and the stiffness of the pile can be appropriately increased, but not blindly.
文摘In the process of piling ,there are many various defects in foundation pile of bridge such as mud-bearing,sediment-bearing, isolation, honeycomb, broken piles, and so on, showing physical and mechanical features of low-density and low-intensity. In fact, by using the comprehensive detection of acoustic transmission method, the reflected wave method as well as drill coring sample method, and the rational utilization of engineering geological condition in field, the characteristics, size and location of common defects of foundation pile of bridge can be accurately detected and judged and the integrity of piles and the quality of concrete can be impersonally estimated.comprehensive detecting and analyzing methods on this kind of piles are introduced briefly. The physical characters of defects and basic features of detecting curves and their corresponding relation are emphasized, and causes are analyzed in in detail in this paper.