In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of...In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of the prefabricated construction industry is constantly accelerating.To effectively ensure the economic benefits of engineering projects,it is necessary to comprehensively strengthen cost budgeting and cost control.This article analyzes the cost budget of prefabricated construction projects,introduces the application advantages of prefabricated construction,and proposes specific cost budgeting and cost control measures,hoping to provide some reference for relevant researchers.展开更多
Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the c...Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the current construction project management,the review of project cost budget settlement is the focus to solve the cost management problems of construction projects and promote the development of the construction industry.This article mainly analyzes the influencing factors and current situation of construction project cost budget settlement review,and based on this,it explores the project cost budget settlement review strategy to promote the healthy development of construction project cost work.展开更多
With the increment of public awareness toward ecological environment protection,green building has gradually become an integral part of construction development.Green building refers to a form of architecture that con...With the increment of public awareness toward ecological environment protection,green building has gradually become an integral part of construction development.Green building refers to a form of architecture that conforms to the current social development form and meets the requisites of energy conservation and environmental protection.The budget and cost control of green building construction project play very important roles in improving the quality of the construction and reducing the cost of the project.This paper mainly analyzes the problems and control measures in the new green building engineering budget and cost control.展开更多
Fog computing became a traditional OffLad Destination(OLD)to compute the offloaded tasks of the Internet of Vehicles(IoV).Nevertheless,the limited computing resources of the fog node leads to re-offload these tasks to...Fog computing became a traditional OffLad Destination(OLD)to compute the offloaded tasks of the Internet of Vehicles(IoV).Nevertheless,the limited computing resources of the fog node leads to re-offload these tasks to the neighboring fog nodes or the cloud.Thus,the IoV will incur additional offloading costs.In this paper,we propose a new offloading scheme by utilizing RoadSide Parked Vehicles(RSPV)as an alternative OLD for IoV.The idle computing resources of the RSPVs can compute large tasks with low offloading costs compared with fog nodes and the cloud.Finally,a performance evaluation of the proposed scheme has been presented and discussed with other benchmark offloading schemes.展开更多
With the deep and sustainable development of the market economy,the competitive environment and development pattern faced by China’s construction industry are becoming more and more severe.In this context,constructio...With the deep and sustainable development of the market economy,the competitive environment and development pattern faced by China’s construction industry are becoming more and more severe.In this context,construction projects should actively incorporate the development trends of the market economy and focus on analyzing relevant influencing factors and risk content.Considering previous experience,the audit effect of construction project budget and settlement has a major impact on the quality and economic benefit of construction projects to a certain extent.In view of this,this paper mainly focuses on the content and method of the construction cost budget and settlement audit as well as suggests measures for the construction cost budget and settlement audit,so as to improve the construction cost management level.展开更多
Background: Chronic kidney disease is a serious public health issue in Egypt. An estimated 13% of individuals in Egypt are expected to have CKD, with a higher prevalence among older adults and in rural regions. The pr...Background: Chronic kidney disease is a serious public health issue in Egypt. An estimated 13% of individuals in Egypt are expected to have CKD, with a higher prevalence among older adults and in rural regions. The primary goal of the study was to compare the cost-utility of the standard of care alone against add-on medication, dapagliflozin, as a preventative measure against complications of CKD in cases with or without diabetes mellitus. Methods: A lifetime Markov state transition model with a 3-month cycle was employed based on the clinical evidence from the DAPA-CKD clinical trial. The model was to provide estimates of the long-term economic and health impact of managing CKD patients. Cost-effectiveness is assessed regarding the cost per quality-adjusted life year (QALY) gained. This economic evaluation study used a payer perspective. Moreover, the study evaluated the impact on the budget due to the undertaking of dapagliflozin. One-way deterministic sensitivity analyses, as well as a probabilistic sensitivity analysis, were employed. Results: During a lifetime horizon, the difference in cost between dapagliflozin and SOC was EGP -65,212 (USD 2126.89). The difference in QALY between dapagliflozin and SOC was 4.3. In CKD patients, adding dapagliflozin to ramipril generates better QALYs and lower costs than ramipril alone. Dapagliflozin improved the outcomes and generated cost savings. A deterministic one was sensitivity analysis revealed that the model is robust to changes in all variables included. Probabilistic sensitivity analysis using Monte Carlo simulation with 10,000 iterations showed that in about 82.64% of trials, dapagliflozin is cost-saving. The undertaking of dapagliflozin by any percent will have a positive impact on the budget. Conclusion: During the lifetime horizon, dapagliflozin is cost-saving;it benefits the quality of life and the total cost. The addition of dapagliflozin to SOC has a saving effect of 11.9% of the budget.展开更多
文摘In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of the prefabricated construction industry is constantly accelerating.To effectively ensure the economic benefits of engineering projects,it is necessary to comprehensively strengthen cost budgeting and cost control.This article analyzes the cost budget of prefabricated construction projects,introduces the application advantages of prefabricated construction,and proposes specific cost budgeting and cost control measures,hoping to provide some reference for relevant researchers.
文摘Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the current construction project management,the review of project cost budget settlement is the focus to solve the cost management problems of construction projects and promote the development of the construction industry.This article mainly analyzes the influencing factors and current situation of construction project cost budget settlement review,and based on this,it explores the project cost budget settlement review strategy to promote the healthy development of construction project cost work.
文摘With the increment of public awareness toward ecological environment protection,green building has gradually become an integral part of construction development.Green building refers to a form of architecture that conforms to the current social development form and meets the requisites of energy conservation and environmental protection.The budget and cost control of green building construction project play very important roles in improving the quality of the construction and reducing the cost of the project.This paper mainly analyzes the problems and control measures in the new green building engineering budget and cost control.
文摘Fog computing became a traditional OffLad Destination(OLD)to compute the offloaded tasks of the Internet of Vehicles(IoV).Nevertheless,the limited computing resources of the fog node leads to re-offload these tasks to the neighboring fog nodes or the cloud.Thus,the IoV will incur additional offloading costs.In this paper,we propose a new offloading scheme by utilizing RoadSide Parked Vehicles(RSPV)as an alternative OLD for IoV.The idle computing resources of the RSPVs can compute large tasks with low offloading costs compared with fog nodes and the cloud.Finally,a performance evaluation of the proposed scheme has been presented and discussed with other benchmark offloading schemes.
文摘With the deep and sustainable development of the market economy,the competitive environment and development pattern faced by China’s construction industry are becoming more and more severe.In this context,construction projects should actively incorporate the development trends of the market economy and focus on analyzing relevant influencing factors and risk content.Considering previous experience,the audit effect of construction project budget and settlement has a major impact on the quality and economic benefit of construction projects to a certain extent.In view of this,this paper mainly focuses on the content and method of the construction cost budget and settlement audit as well as suggests measures for the construction cost budget and settlement audit,so as to improve the construction cost management level.
文摘Background: Chronic kidney disease is a serious public health issue in Egypt. An estimated 13% of individuals in Egypt are expected to have CKD, with a higher prevalence among older adults and in rural regions. The primary goal of the study was to compare the cost-utility of the standard of care alone against add-on medication, dapagliflozin, as a preventative measure against complications of CKD in cases with or without diabetes mellitus. Methods: A lifetime Markov state transition model with a 3-month cycle was employed based on the clinical evidence from the DAPA-CKD clinical trial. The model was to provide estimates of the long-term economic and health impact of managing CKD patients. Cost-effectiveness is assessed regarding the cost per quality-adjusted life year (QALY) gained. This economic evaluation study used a payer perspective. Moreover, the study evaluated the impact on the budget due to the undertaking of dapagliflozin. One-way deterministic sensitivity analyses, as well as a probabilistic sensitivity analysis, were employed. Results: During a lifetime horizon, the difference in cost between dapagliflozin and SOC was EGP -65,212 (USD 2126.89). The difference in QALY between dapagliflozin and SOC was 4.3. In CKD patients, adding dapagliflozin to ramipril generates better QALYs and lower costs than ramipril alone. Dapagliflozin improved the outcomes and generated cost savings. A deterministic one was sensitivity analysis revealed that the model is robust to changes in all variables included. Probabilistic sensitivity analysis using Monte Carlo simulation with 10,000 iterations showed that in about 82.64% of trials, dapagliflozin is cost-saving. The undertaking of dapagliflozin by any percent will have a positive impact on the budget. Conclusion: During the lifetime horizon, dapagliflozin is cost-saving;it benefits the quality of life and the total cost. The addition of dapagliflozin to SOC has a saving effect of 11.9% of the budget.