Failure of pipe networks due to blast loads resulting from terrorist attacks or construction facilities, may cause economic loss, environmental pollution, source of firing or even it may lead to a disaster. The presen...Failure of pipe networks due to blast loads resulting from terrorist attacks or construction facilities, may cause economic loss, environmental pollution, source of firing or even it may lead to a disaster. The present work develops a closed-form solution of buried pipe with barrier system subjected to subsurface detonation. The solution is derived based on the concept of double-beam system. Euler Bernoulli's beams are used to simulate the buried pipe and the barrier system. Soil is idealized as viscoelastic foundation along with shear interaction between discrete Winkler springs(advanced soil model). The finite SineFourier transform is employed to solve the coupled partial differential equations. The solution is validated with past studies. A parametric study is conducted to investigate the influence of TNT charge weight, pipe material, damping ratio and TNT offset on the response of buried pipe with and without barrier system. Further a statistical analysis is carried out to get the significant soil and pipe input parameters. It is perceived that peak pipe displacements for both the cases(with and without barrier) are increases with increasing the weight of TNT charge and decreases with increasing the damping ratio and TNT offset. The deformation of pipe also varies with pipe material. Pipe safety against blast loads can be ensured by providing suitable barrier layer. The present study can be utilized in preliminary design stage as an alternative to expensive numerical analysis or field study.展开更多
文摘Failure of pipe networks due to blast loads resulting from terrorist attacks or construction facilities, may cause economic loss, environmental pollution, source of firing or even it may lead to a disaster. The present work develops a closed-form solution of buried pipe with barrier system subjected to subsurface detonation. The solution is derived based on the concept of double-beam system. Euler Bernoulli's beams are used to simulate the buried pipe and the barrier system. Soil is idealized as viscoelastic foundation along with shear interaction between discrete Winkler springs(advanced soil model). The finite SineFourier transform is employed to solve the coupled partial differential equations. The solution is validated with past studies. A parametric study is conducted to investigate the influence of TNT charge weight, pipe material, damping ratio and TNT offset on the response of buried pipe with and without barrier system. Further a statistical analysis is carried out to get the significant soil and pipe input parameters. It is perceived that peak pipe displacements for both the cases(with and without barrier) are increases with increasing the weight of TNT charge and decreases with increasing the damping ratio and TNT offset. The deformation of pipe also varies with pipe material. Pipe safety against blast loads can be ensured by providing suitable barrier layer. The present study can be utilized in preliminary design stage as an alternative to expensive numerical analysis or field study.