In order to solve the surrounding rock control problem of large section gangue replacement roadway under complicated conditions, this paper analyzed the impact to the roadway controlling produced by the geological con...In order to solve the surrounding rock control problem of large section gangue replacement roadway under complicated conditions, this paper analyzed the impact to the roadway controlling produced by the geological conditions such as high ground stress, folded structure tilted roof asymmetry and soft wall rock, and built the tilt layered roof structural mechanics model to clarify the increase span mechanism of the weak coal instability. Then, we proposed the combined control system including roof inclined truss cable, coal-side cable-channel steel and intensive bolt support. And then by building the structural mechanics model of roof inclined truss cable system, the support principle was described. Besides, according to this model, we deduced the calculation formula of cable anchoring force and its tensile stress. Finally surrounding rock control technology of large section roadway in fold coal pillar area was formed. Field practice shows that the greatest roof convergence of gangue replacement roadway is 158 mm and coal-side deformation is 243 mm. Roadway deformation is controlled effectively and technical support is provided for replacement mining.展开更多
The support of coal roadways is seriously affected by intense dynamic pressures.This can lead to problems with large deformation of the roof and the two side walls of coal roadways.Rapid convergence of the walls and r...The support of coal roadways is seriously affected by intense dynamic pressures.This can lead to problems with large deformation of the roof and the two side walls of coal roadways.Rapid convergence of the walls and roof,a high damage rate to the bolts and cables,or even abrupt roof collapse or rib spalling can occur during the service period of these coal roadways.Analyzing the main support measures used in China leads to a proposed new cable truss supporting system.Thorough study of the entire structure shows the superiority of this design for roadways suffering under dynamic pressure.A corresponding mechanical model of the rock surrounding the cable truss system is described in this paper and formulas for calculating pre-tightening forces of the truss cable,and the minimum anchoring forces,were deduced.The new support system was applied to a typical roadway affected by intensive dynamic pressure that is located in the Xinyuan Coal Mine.The results show that the largest subsidence of the roof was 97 mm,the convergence of the two sides was less than 248 mm,and the average depth of the loose,fractured layer was only 6.12 mm.This proves that the new support system is feasible and effective.展开更多
The nonlinear finite element method is used to analyze the geometrical nonlinear stability of cable truss domes with different cable distributions. The results indicate that the critical load increases evidently when...The nonlinear finite element method is used to analyze the geometrical nonlinear stability of cable truss domes with different cable distributions. The results indicate that the critical load increases evidently when cables, especially diagonal cables, are distributed in the structure. The critical loads of the structure at different rise span ratios are also discussed in this paper. It was shown that the effect of the tensional cable is more evident at small rise span ratio. The buckling of the structure is characterized by a global collapse at small rise span ratio; that the torsional buckling of the radial truss occurs at big rise span ratio; and that at proper rise span ratio, the global collapse and the lateral buckling of the truss occur nearly simultaneously.展开更多
With the enlarge of cross section of roadway, the radius of plastic area and broken area increase, and the tensile stress and shear stress distributing in roof coal-rock layers relevantly increase, which induce suppor...With the enlarge of cross section of roadway, the radius of plastic area and broken area increase, and the tensile stress and shear stress distributing in roof coal-rock layers relevantly increase, which induce support effect not obvious for ordinary bolt(cable). While bounding point and support structure of the truss cable is in vertex angle of roadway, and supplies coal-rock layers in bounding area with the horizontal and vertical pressure, so it settles the support problems in large cross section coal roadway. From the point of view of mechanics, gave emphasis on the invalid mechanics of ordinary bolt (cable) in large cross section coal roadway and supported mechanics of prestress truss cable. The author successfully used this technique in Wuyang Mine, and had the huge economic efficiency and the social benefit.展开更多
The truss cable support technology was put forward to control the large mining height and composite mudstone strata roadway. This technique makes the steady rock in roadway slantwise top be anchor points, makes the tr...The truss cable support technology was put forward to control the large mining height and composite mudstone strata roadway. This technique makes the steady rock in roadway slantwise top be anchor points, makes the truss cable be steady support structure through special implement, and supplied rock in anchor area with horizontal and vertical pressure which strengthens the surrounding rock's anti-strain capability, so it can solve the support problem in roadway with the large cross section and large mining height with mudstone strata. The support mechanism of truss cable about how to make the soft strata stabilize is analyzed by use of the mechanical method. Based on the mechanism and numerical simulation method, the truss cable support project was designed and used to the large mining setting room in eleventh mining area of Bailong Mine successfully.展开更多
文摘In order to solve the surrounding rock control problem of large section gangue replacement roadway under complicated conditions, this paper analyzed the impact to the roadway controlling produced by the geological conditions such as high ground stress, folded structure tilted roof asymmetry and soft wall rock, and built the tilt layered roof structural mechanics model to clarify the increase span mechanism of the weak coal instability. Then, we proposed the combined control system including roof inclined truss cable, coal-side cable-channel steel and intensive bolt support. And then by building the structural mechanics model of roof inclined truss cable system, the support principle was described. Besides, according to this model, we deduced the calculation formula of cable anchoring force and its tensile stress. Finally surrounding rock control technology of large section roadway in fold coal pillar area was formed. Field practice shows that the greatest roof convergence of gangue replacement roadway is 158 mm and coal-side deformation is 243 mm. Roadway deformation is controlled effectively and technical support is provided for replacement mining.
基金provided by the National Basic Research Program of China (No. 2010CB226802)the Fundamental Research Funds for the Central Universities (No. 2010YZ02)the State Key Laboratory of Coal Resources and Safe Mining (No.SKLCRSM 10B08)
文摘The support of coal roadways is seriously affected by intense dynamic pressures.This can lead to problems with large deformation of the roof and the two side walls of coal roadways.Rapid convergence of the walls and roof,a high damage rate to the bolts and cables,or even abrupt roof collapse or rib spalling can occur during the service period of these coal roadways.Analyzing the main support measures used in China leads to a proposed new cable truss supporting system.Thorough study of the entire structure shows the superiority of this design for roadways suffering under dynamic pressure.A corresponding mechanical model of the rock surrounding the cable truss system is described in this paper and formulas for calculating pre-tightening forces of the truss cable,and the minimum anchoring forces,were deduced.The new support system was applied to a typical roadway affected by intensive dynamic pressure that is located in the Xinyuan Coal Mine.The results show that the largest subsidence of the roof was 97 mm,the convergence of the two sides was less than 248 mm,and the average depth of the loose,fractured layer was only 6.12 mm.This proves that the new support system is feasible and effective.
文摘The nonlinear finite element method is used to analyze the geometrical nonlinear stability of cable truss domes with different cable distributions. The results indicate that the critical load increases evidently when cables, especially diagonal cables, are distributed in the structure. The critical loads of the structure at different rise span ratios are also discussed in this paper. It was shown that the effect of the tensional cable is more evident at small rise span ratio. The buckling of the structure is characterized by a global collapse at small rise span ratio; that the torsional buckling of the radial truss occurs at big rise span ratio; and that at proper rise span ratio, the global collapse and the lateral buckling of the truss occur nearly simultaneously.
基金Supported by the National Natural Science Foundation of China (50074030) and Dr. Special fund of the Ministry of Education (20030290017)
文摘With the enlarge of cross section of roadway, the radius of plastic area and broken area increase, and the tensile stress and shear stress distributing in roof coal-rock layers relevantly increase, which induce support effect not obvious for ordinary bolt(cable). While bounding point and support structure of the truss cable is in vertex angle of roadway, and supplies coal-rock layers in bounding area with the horizontal and vertical pressure, so it settles the support problems in large cross section coal roadway. From the point of view of mechanics, gave emphasis on the invalid mechanics of ordinary bolt (cable) in large cross section coal roadway and supported mechanics of prestress truss cable. The author successfully used this technique in Wuyang Mine, and had the huge economic efficiency and the social benefit.
文摘The truss cable support technology was put forward to control the large mining height and composite mudstone strata roadway. This technique makes the steady rock in roadway slantwise top be anchor points, makes the truss cable be steady support structure through special implement, and supplied rock in anchor area with horizontal and vertical pressure which strengthens the surrounding rock's anti-strain capability, so it can solve the support problem in roadway with the large cross section and large mining height with mudstone strata. The support mechanism of truss cable about how to make the soft strata stabilize is analyzed by use of the mechanical method. Based on the mechanism and numerical simulation method, the truss cable support project was designed and used to the large mining setting room in eleventh mining area of Bailong Mine successfully.