期刊文献+
共找到15篇文章
< 1 >
每页显示 20 50 100
Numerical and experimental research on annular crossed cable-truss structure under cable rupture 被引量:5
1
作者 Liu Renjie Li Xiongyan +2 位作者 Xue Suduo Marijke Mollaert Ye Jihong 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2017年第3期557-569,共13页
The Annular Crossed Cable-Truss Structure(ACCTS) is a new type of Tensile Spatial Structure with a configuration suitable to cover large-span stadiums. Its configuration has potential to perform well in resisting di... The Annular Crossed Cable-Truss Structure(ACCTS) is a new type of Tensile Spatial Structure with a configuration suitable to cover large-span stadiums. Its configuration has potential to perform well in resisting disproportionate collapse. However, its disproportionate collapse resistance hasn't yet been analyzed in depth. In this study, numerical and experimental research was carried out to investigate the performance of ACCTS under cable rupture. The numerical analysis was done for ten cable-rupture plans using LS-DYNA(explicit method) and the experimental test on an ACCTS with a diameter of 17.15 m was performed for three cable-rupture plans. It is concluded that, while deflections increase with the number of removed cables, an ACCTS does not undergo a disproportionate collapse and it provides a promising structural concept for tensile spatial structures. 展开更多
关键词 tensile spatial structure annular tensile cable-truss structure disproportionate collapse
下载PDF
Internal Force Distribution in Steel-Concrete Composite Structure for Pylon of Cable-Stayed Bridge 被引量:5
2
作者 蒲黔辉 白光亮 《Journal of Southwest Jiaotong University(English Edition)》 2009年第2期95-101,共7页
Adopting a steel-anchor beam and steel corbel composite structure in the anchor zone on pylon is one of the key techniques for the design of Jintang bridge, a cable-stayed bridge in Zhoushan, China. In order to ensure... Adopting a steel-anchor beam and steel corbel composite structure in the anchor zone on pylon is one of the key techniques for the design of Jintang bridge, a cable-stayed bridge in Zhoushan, China. In order to ensure the safety of the steel-concrete composite structure, a stud connector model for the joint section was put forward. Experiments were conducted to obtain the relation between load and slip of specimen, the failure pattern of stud connector, the yield bearing capacity and ultimate bearing capacity of a single stud, etc. The whole process of the structural behavior of the specimen was comprehensively analyzed. The features of the internal force distribution in the steel-concrete composite structure and the strain distribution of stud connector under different loads were emphatically studied. The test results show that the stud connector is applicable for the steel-concrete composite structure for pylon of Jintang bridge. The stud has a good ductility performance and a obvious yield process before its destruction. The stud connector basically works in a state of elasticity under a load less than the yield load. 展开更多
关键词 Stud connector Experimental research Steel-concrete composite structure cable-stayed bridge Internal force distribution
下载PDF
Development of Optimal Structural System for Hybrid Cable-Stayed Bridges Using Ultra High Performance Concrete 被引量:1
3
作者 Hee Seok Kim Young Jin Kim +1 位作者 Won Jong Chin Hyejin Yoon 《Engineering(科研)》 2013年第9期720-728,共9页
This study developed an optimal structural system for the hybrid cable-stayed bridge expected to have a durable lifetime of 200 years and of which major structural members are made of ultra high performance concrete (... This study developed an optimal structural system for the hybrid cable-stayed bridge expected to have a durable lifetime of 200 years and of which major structural members are made of ultra high performance concrete (UHPC) with 200 MPa-class compressive strength. This innovative cable-stayed bridge system makes it possible to reduce each of the construction and maintenance costs by 20% compared to the conventional concrete cable-stayed bridge by improving significantly the weight and durability of the bridge. Therefore, detail design is carried out considering a real 800 m cable-stayed bridge and the optimal structure of the hybrid cable-stayed bridge is proposed and verified. 展开更多
关键词 HYBRID cable-stayed Bridge Ultra High Performance Concrete (UHPC) OPTIMAL structural System DURABILITY
下载PDF
Analytical Study of the Cable-Truss Systems on the Glass Certain Walls with Vertical Uses 被引量:2
4
作者 Yasemin Mesda 《Engineering(科研)》 2013年第10期819-826,共8页
The aim of this study is to analyze of the cable-glass systems which are used on the glass curtain wall according to their types, degree, architectural and structural effects. The suspended glass system with pre-stres... The aim of this study is to analyze of the cable-glass systems which are used on the glass curtain wall according to their types, degree, architectural and structural effects. The suspended glass system with pre-stressed cable truss (SGSPCT) is widely started to apply after the 1980’s with Serres building. The advantages of these systems are to provide the transparency on the fa?ades and speedy construction process with minimum materials. The disadvantages are: more expensive than other systems and so many details for the joints and load distribution calculations. There are three different architectural design typologies of the SGSPCT system. These are distance bridging systems, between floor system and independent body. These three different typologies can be seen on the same building at the same time. This system has been known as complex structure systems. The twenty five glass buildings which are designed in different systems have been analyzed during this study. After these analyses the five glass buildings which are designed with cable-truss system have been selected for scope of the study. These selected buildings have been included of three different cable-truss system typologies and degree. The methodology of this study is literature survey and building analyses method. The written and visual documents involve books, theses, reports, articles, magazines, drawings, internet sources and applied connection details of the glass buildings. The selected five glass buildings have been detailed analyzed with their architectural drawings, photographs and details. The study consists of five chapters including the introduction chapter. The general information of the glass building and cable-glass system has been mentioned in the first chapter. The structural features, details and analytical information on systems have been explained of the selected buildings in the second chapter. The detailed analyses of these selected buildings have been done according to their schematic drawings with the plans, sections and load distribution in the third chapter. The fourth chapter is discussion section. In this section, cable-truss systems have been compared with their advantages and disadvantages to the other systems. The fifth chapter is the last chapter, many advantages of cable-truss systems have been concluded that the use of glass substrates. 展开更多
关键词 SGSPCT cable-truss SYSTEM Tension structure Types of the cable-truss SYSTEM GLASS CURTAIN Wall
下载PDF
Research review on steel–concrete composite joint of railway hybrid girder cable-stayed bridges 被引量:2
5
作者 Zhou Shi Jiachang Gu +1 位作者 Yongcong Zhou Ying Zhang 《Railway Sciences》 2022年第2期241-259,共19页
Purpose–This study aims to research the development trend,research status,research results and existing problems of the steel–concrete composite joint of railway long-span hybrid girder cable-stayed bridge.Design/me... Purpose–This study aims to research the development trend,research status,research results and existing problems of the steel–concrete composite joint of railway long-span hybrid girder cable-stayed bridge.Design/methodology/approach–Based on the investigation and analysis of the development history,structure form,structural parameters,stress characteristics,shear connector stress state,force transmission mechanism,and fatigue performance,aiming at the steel–concrete composite joint of railway long-span hybrid girder cable-stayed bridge,the development trend,research status,research results and existing problems are expounded.Findings–The shear-compression composite joint has become the main form in practice,featuring shortened length and simplified structure.The length of composite joints between 1.5 and 3.0 m has no significant effect on the stress and force transmission laws of the main girder.The reasonable thickness of the bearing plate is 40–70 mm.The calculation theory and simplified calculation formula of the overall bearing capacity,the nonuniformity and distribution laws of the shear connector,the force transferring ratio of steel and concrete components,the fatigue failure mechanism and structural parameters effects are the focus of the research study.Originality/value–This study puts forward some suggestions and prospects for the structural design and theoretical research of the steel–concrete composite joint of railway long-span hybrid girder cable-stayed bridge. 展开更多
关键词 RAILWAY Hybrid girder cable-stayed bridge Steel-concrete composite joint structure Stress characteristics REVIEW
下载PDF
Modeling of cable vibration effects of cable-stayed bridges
6
作者 S.H.Cheng David T.Lau 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2002年第1期74-85,共12页
The analysis of dynamic responses of cable-stayed bridges subjected to wind and earthquake loads generally considers only the motions of the bridge deck and pylons.The influence of the stay cable vibration on the resp... The analysis of dynamic responses of cable-stayed bridges subjected to wind and earthquake loads generally considers only the motions of the bridge deck and pylons.The influence of the stay cable vibration on the responses of the bridge is either ignored or considered by approximate procedures.The transverse vibration of the stay cables,which can be significant in some cases,are usually neglected in previous research.In the present study,a new three-node cable element has been developed to model the transverse motions of the cables.The interactions between the cable behavior and the other parts of the bridge superstructure are considered by the concept of dynamic stiffness.The nonlinear effect of the cable caused by its self-weight is included in the formulation.Numerical examples are presented to demonstrate the accuracy and efficiency of the proposed model. The impact of cable vibration behavior on the dynamic characteristics of cable-stayed bridges is discussed. 展开更多
关键词 cable-stayed bridges cable vibration DYNAMICS finite elements long-span structures
下载PDF
Cross spectral energy method for damage assessment of the cable-stayed bridge under operational conditions
7
作者 杨和振 Li Huajun 《High Technology Letters》 EI CAS 2008年第3期309-315,共7页
The new cross spectral energy method(CSEM)is proposed for maintaining cable-stayed bridge safe-ty by the measurable output-only vibration response.Damage assessment of real structures is limited by aseries of problems... The new cross spectral energy method(CSEM)is proposed for maintaining cable-stayed bridge safe-ty by the measurable output-only vibration response.Damage assessment of real structures is limited by aseries of problems such as unknown ambient excitation forces,errors introduced by system identification,incomplete dynamic measurements,etc.Thus the methodology based on cross spectral energy of eachsubstructure member is derived to meet these challenges.The novel damage index does not require anymodal or parameter identification technology.It can be calculated directly from vibration test data.In or-der to evaluate the efficiency of the presented methodology,a three dimensional(3D)actual cable-stayedbridge model with one or more damaged positions under operational conditions was studied.In order totestify the reliability of damage detection method,the response data was polluted by the random noise.Itis proved that the proposed method can successfully localize all damage cases even in noisy data.Withthe help of examples,the CSEM can potentially be applied as a nondestructive evaluation technique(NDT)for on-line health monitoring of cable-stayed bridges with minimum disruption of its operations. 展开更多
关键词 damage assessment structural health monitoring finite element method VIBRATION cable-stayed bridges
下载PDF
Study on structural system of Sutong Bridge
8
作者 Zhang Xigang Pei Minshan +2 位作者 Yuan Hong Xu Liping Zhu Bin 《Engineering Sciences》 EI 2009年第1期12-17,共6页
Sutong Bridge,whose layout is [(100+100+300)+1 088 +(300+100+100)] m,marks the largest span of cable-stayed bridges in the world.The complex natural condition at the bridge site and the strict requirements for resista... Sutong Bridge,whose layout is [(100+100+300)+1 088 +(300+100+100)] m,marks the largest span of cable-stayed bridges in the world.The complex natural condition at the bridge site and the strict requirements for resistance of wind and seismic action make it crucial to choose a favorable structural system to assure the function and safety of the bridge.The comparison among several optional structural systems for Sutong Bridge is illustrated.After detailed analysis is carried out for viscous damper and hydraulic buffer,super liquid viscous damper with additional displacement limitation is designed for the first application in bridge engineering.The parameters for the damper is analyzed and studied and the dampers are installed successfully after quality tests. 展开更多
关键词 cable-stayed bridge structural system DAMPER damper parameter displacement restraint
下载PDF
Seismic Performance of Prefabricated Continuous Girder Bridge
9
作者 Hongyuan Xiong 《Journal of World Architecture》 2024年第5期42-46,共5页
Bearings are the weak link in the seismic design of bridges.Using a continuous girder bridge as an example,it is demonstrated that bearing damage should be considered under large earthquake conditions.The bearing,acti... Bearings are the weak link in the seismic design of bridges.Using a continuous girder bridge as an example,it is demonstrated that bearing damage should be considered under large earthquake conditions.The bearing,acting as a fuse-type unit,can be designed to be preferentially damaged to effectively control the displacement of the beam and the response at the base of the pier during an earthquake. 展开更多
关键词 cable-stayed bridge Seismic analysis Dynamic performance structural design
下载PDF
Estimating extreme temperature differences in steel box girder using long-term measurement data 被引量:5
10
作者 丁幼亮 王高新 《Journal of Central South University》 SCIE EI CAS 2013年第9期2537-2545,共9页
The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the ... The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the Runyang Cable-stayed Bridge,the daily variations as well as seasonal ones of measured temperature differences in the box girder cross-section area were summarized.The probability distribution models of temperature differences were further established and the extreme temperature differences were estimated with a return period of 100 years.Finally,the temperature difference models in cross-section area were proposed for bridge thermal design.The results show that horizontal temperature differences in top plate and vertical temperature differences between top plate and bottom plate are considerable.All the positive and negative temperature differences can be described by the weighted sum of two Weibull distributions.The maximum positive and negative horizontal temperature differences in top plate are 10.30 ℃ and -13.80 ℃,respectively.And the maximum positive and negative vertical temperature differences between top plate and bottom plate are 17.30 ℃ and-3.70 ℃,respectively.For bridge thermal design,there are two vertical temperature difference models between top plate and bottom plate,and six horizontal temperature difference models in top plate. 展开更多
关键词 structural health monitoring cable-stayed bridge steel box girder temperature difference extreme value analysis
下载PDF
General design of Sutong Bridge 被引量:4
11
作者 Zhang Xigang Yuan Hong +2 位作者 Pei Minshan Dai Jie Xu Lin 《Engineering Sciences》 EI 2009年第1期6-11,共6页
The main span of Sutong Bridge is a double-pylon,double-plane cable-stayed bridge with steel box girder,which has the world's longest central span of 1 088 m within cable-stayed bridges.To overcome problems caused... The main span of Sutong Bridge is a double-pylon,double-plane cable-stayed bridge with steel box girder,which has the world's longest central span of 1 088 m within cable-stayed bridges.To overcome problems caused by severe meteorological conditions,perplexing hydrological conditions,deep buried bedrock and higher navigation level,many new technics and methods were created.Keys including structural system,steel box girder,stayed cable,tower,pier,tower foundation,collision avoidance system,wind-resistance,seismic-resistance,structural nonlinear response and structural static stability were presented individually in this paper. 展开更多
关键词 cable-stayed bridge structural system steel box girder stayed cable TOWER tower foundation
下载PDF
Comparison of various procedures for progressive collapse analysis of cable-stayed bridges 被引量:11
12
作者 Jian-guo CAI Yi-xiang XU +2 位作者 Li-ping ZHUANG Jian FENG Jin ZHANG 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2012年第5期323-334,共12页
Alternate path(AP) method is the most widely used method for the progressive collapse analysis,and its application in frame structures has been well proved.However,the application of AP method for other structures,esp... Alternate path(AP) method is the most widely used method for the progressive collapse analysis,and its application in frame structures has been well proved.However,the application of AP method for other structures,especially for cable-stayed structures,should be further developed.The four analytical procedures,i.e.,linear static,nonlinear static,linear dynamic,and nonlinear dynamic were firstly improved by taking into account the initial state.Then a cable-stayed structure was studied using the four improved methods.Furthermore,the losses of both one cable and two cables were discussed.The results show that for static and dynamic analyses of the cable-stayed bridges,there is large difference between the results obtained from simulations starting with either a deformed or a nondeformed configuration at the time of cable loss.The static results are conservative in the vicinity of the ruptured cable,but the dynamic effect of the cable loss in the area farther away from the loss-cable cannot be considered.Moreover,the dynamic amplification factor of 2.0 is found to be a good estimate for static analysis procedures,since linear static and linear dynamic procedures yield approximately the same maximum vertical deflection.The results of the comprehensive evaluation of the cable failure show that the tread of the progressive failure of the cable-stayed bridges decreases when the location of the failed cables is closer to the pylon. 展开更多
关键词 Progressive failure structural failures COLLAPSE Linear analysis Nonlinear analysis Dynamic analysis cable-stayed bridges
原文传递
Assessment on System Reliability of Cable-stayed Bridges Based on Unascertained Measures 被引量:1
13
作者 Yancang Li Juanjuan Suo Shujing Zhou 《Journal of Systems Science and Information》 2008年第1期27-34,共8页
To overcome the shortcomings that there are few feasible methods and models in the comprehensive assessment on the system reliability of cable-stayed bridges, a mathematical tool-the unascertalned measure was introduc... To overcome the shortcomings that there are few feasible methods and models in the comprehensive assessment on the system reliability of cable-stayed bridges, a mathematical tool-the unascertalned measure was introduced. First, the basic knowledge of the Unascertained Sets was introduced briefly. Second, the unascertained measure was defined and the comprehensive assessment model was set up. Then the method was introduced to the assessment of the system reliability of a cable-stayed bridge located in Tianjin City. Engineering practices shows that the method can complete the assessment systematically and scientifically without any assumption. The work has significance in theory and practice for the comprehensive assessment of bridge engineering. 展开更多
关键词 comprehensive assessment system structural reliability cable-stayed bridge unascertalned measure information entropy
原文传递
Environmental variability study on the measured responses of Runyang Cablestayed Bridge using wavelet packet analysis 被引量:20
14
作者 DING YouLiang LI AiQun LIU Tao 《Science China(Technological Sciences)》 SCIE EI CAS 2008年第5期517-528,共12页
The structural damage alarming method based on wavelet packet energy spectrum (WPES) for long-span cable-stayed bridges is presented through combination of ambient vibration test and wavelet packet analysis. The envir... The structural damage alarming method based on wavelet packet energy spectrum (WPES) for long-span cable-stayed bridges is presented through combination of ambient vibration test and wavelet packet analysis. The environmental variability in the measured WPES and damage alarming indices ERVD of the Runyang Cable-stayed Bridge are discussed in detail using the wavelet packet analysis of the measured acceleration responses of the bridge under daily environmental conditions. The analysis results reveal that the actual environmental conditions including traffic loadings, environmental temperature and typhoon loadings have remarkable correlations with the measured WPES. The changes of environmental temperature have a long-term trend influence on the WPES, while the influences of traffic and typhoon loadings on the measured WPES of the bridge present instantaneous changes because of the nonstationary properties of the loadings. The analysis results of the measured responses further reveal that the damage alarming indices ERVD can sensitively reflect the influences of environmental temperature and typhoon loadings on the dynamic properties of Runyang Cable-stayed Bridge. Therefore, the proposed structural damage alarming indices ERVD under ambient vibrations are suitable for real-time damage alarming for long-span cable-stayed bridges. 展开更多
关键词 cable-stayed BRIDGE WAVELET PACKET analysis WAVELET PACKET energy SPECTRUM AMBIENT vibration structural damage alarming
原文传递
Measurement Study on Wind Characteristics of Typhoon Kalmaegi on the Sutong Bridge 被引量:2
15
作者 HU Ruomei, WANG Hao, LI Aiqun School of Civil Engineering, Southeast University, Nanjing 210096, Jiangsu, China 《Wuhan University Journal of Natural Sciences》 CAS 2010年第2期153-159,共7页
The Sutong Bridge, a cable-stayed located in the southeast coastal area of China, is vulnerable to the Pacific typhoons. From the data measured by two 3D ultrasonic anemometers at the height of 76 m and 306 m, the win... The Sutong Bridge, a cable-stayed located in the southeast coastal area of China, is vulnerable to the Pacific typhoons. From the data measured by two 3D ultrasonic anemometers at the height of 76 m and 306 m, the wind characteristics (including 10-minute mean wind speed and direction, turbulence intensity and gust factor, power spectral density and integral scale of turbulence) of Typhoon Kalmaegi are analyzed The comparison of 10-minute mean wind velocity from the two anemometers vali- dates the reliability of wind data. The turbulence intensities (Iu, Iv, and Iw) show the decreasing trend as the mean wind speed increases. The mean value of Iv/Iu is 0.94, while that of Iw/Iu is 0.90. Discrepancy exists between field-measured power spectra and code-suggested spectra. Those results can enlarge the wind database of the southeast coastal area of China, and provide references for wind resistance evaluation of the bridge. 展开更多
关键词 structural health monitoring system (SHMS) cable-stayed bridge Typhoon Kalmaegi wind characteristics
原文传递
上一页 1 下一页 到第