Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in...Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in the field of underground space engineering.This paper presented a case study of tunnelling performance prediction method of CBM in sedimentary hard-rock tunnel of Karst landform type by using tunneling data and surrounding rock parameters.The uniaxial compressive strength(UCS),rock integrity factor(Kv),basic quality index([BQ]),rock quality index RQD,brazilian tensile strength(BTS) and brittleness index(BI) were introduced to construct a performance prediction database based on the hard-rock tunnel of Guiyang Metro Line 1 and Line 3,and then established the performance prediction model of cantilever boring machine.Then the deep belief network(DBN) was introduced into the performance prediction model,and the reliability of performance prediction model was verified by combining with engineering data.The study showed that the influence degree of surrounding rock parameters on the tunneling performance of the cantilever boring machine is UCS > [BQ] > BTS >RQD > Kv > BI.The performance prediction model shows that the instantaneous cutting rate(ICR) has a good correlation with the surrounding rock parameters,and the predicting model accuracy is related to the reliability of construction data.The prediction of limestone and dolomite sections of Line 3 based on the DBN performance prediction model shows that the measured ICR and predicted ICR is consistent and the built performance prediction model is reliable.The research results have theoretical reference significance for the applicability analysis and mechanical selection of cantilever boring machine for hard rock tunnel.展开更多
A cantilever coordinate measuring machine(CCMM)is proposed according to the in-situ measurement requirement of workpieces with complex structures limited by the finite space of the5-axes computerized numerical control...A cantilever coordinate measuring machine(CCMM)is proposed according to the in-situ measurement requirement of workpieces with complex structures limited by the finite space of the5-axes computerized numerical control(CNC)processing site.Factors affecting uncertainty of measurement(UM)are classified and analyzed on the basis of uncertainty evaluation criteria,and the estimation technique of UM for measuring systems is presented.UM of the CCMM is estimated from the factors such as temperature,error motions as well as the mechanism deformations.Measurement results show that the actual measurement error is smaller than that of measurement requirement.展开更多
In order to solve the in-situ measurement problem of workpiece with complex structures,a cantilever coordinate measuring machine(CCMM)is proposed to adapt to the finite space constraints of the 5-axis computer numeric...In order to solve the in-situ measurement problem of workpiece with complex structures,a cantilever coordinate measuring machine(CCMM)is proposed to adapt to the finite space constraints of the 5-axis computer numerical control(CNC)processing site.Structure design of dense ball bearing shafting is analyzed and optimized.Factors affecting measurement accuracy of CCMM are analyzed,and measurement accuracy is validated by experiments.Results show that the structure of CCMM is able to satisfy requirements of technical specification,and the in-situ measurement of blisk manufacturing is realized.The CCMM developed is of important significance for machining quantity improvement of blisk and development of large aircraft production.展开更多
基金National Natural Science Foundation of China (Grant No.52178393)the Science and Technology Innovation Team of Shaanxi Innovation Capability Support Plan (Grant No.2020TD005)Science and Technology Innovation Project of China Railway Construction Bridge Engineering Bureau Group Co.,Ltd.(Grant No.DQJ-2020-B07)。
文摘Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in the field of underground space engineering.This paper presented a case study of tunnelling performance prediction method of CBM in sedimentary hard-rock tunnel of Karst landform type by using tunneling data and surrounding rock parameters.The uniaxial compressive strength(UCS),rock integrity factor(Kv),basic quality index([BQ]),rock quality index RQD,brazilian tensile strength(BTS) and brittleness index(BI) were introduced to construct a performance prediction database based on the hard-rock tunnel of Guiyang Metro Line 1 and Line 3,and then established the performance prediction model of cantilever boring machine.Then the deep belief network(DBN) was introduced into the performance prediction model,and the reliability of performance prediction model was verified by combining with engineering data.The study showed that the influence degree of surrounding rock parameters on the tunneling performance of the cantilever boring machine is UCS > [BQ] > BTS >RQD > Kv > BI.The performance prediction model shows that the instantaneous cutting rate(ICR) has a good correlation with the surrounding rock parameters,and the predicting model accuracy is related to the reliability of construction data.The prediction of limestone and dolomite sections of Line 3 based on the DBN performance prediction model shows that the measured ICR and predicted ICR is consistent and the built performance prediction model is reliable.The research results have theoretical reference significance for the applicability analysis and mechanical selection of cantilever boring machine for hard rock tunnel.
基金National Natural Science Foundation of China(No.51375338)
文摘A cantilever coordinate measuring machine(CCMM)is proposed according to the in-situ measurement requirement of workpieces with complex structures limited by the finite space of the5-axes computerized numerical control(CNC)processing site.Factors affecting uncertainty of measurement(UM)are classified and analyzed on the basis of uncertainty evaluation criteria,and the estimation technique of UM for measuring systems is presented.UM of the CCMM is estimated from the factors such as temperature,error motions as well as the mechanism deformations.Measurement results show that the actual measurement error is smaller than that of measurement requirement.
基金National Natural Science Foundation of China(No.51375338)
文摘In order to solve the in-situ measurement problem of workpiece with complex structures,a cantilever coordinate measuring machine(CCMM)is proposed to adapt to the finite space constraints of the 5-axis computer numerical control(CNC)processing site.Structure design of dense ball bearing shafting is analyzed and optimized.Factors affecting measurement accuracy of CCMM are analyzed,and measurement accuracy is validated by experiments.Results show that the structure of CCMM is able to satisfy requirements of technical specification,and the in-situ measurement of blisk manufacturing is realized.The CCMM developed is of important significance for machining quantity improvement of blisk and development of large aircraft production.