Determination of initial cable force of cantilever casting concrete arch bridge using stress balance and influence matrix methods 被引量:7
1
作者 TIAN Zhong-chu PENG Wen-ping +2 位作者 ZHANG Jian-ren JIANG Tian-yong DENG Yang 《Journal of Central South University》 SCIE EI CAS CSCD 2019年第11期3140-3155,共16页
Cantilever casting concrete arch bridge using form traveller has a broad application prospect.However,it is difficult to obtain reasonable initial cable force in construction stage.In this study,stress balance and inf... Cantilever casting concrete arch bridge using form traveller has a broad application prospect.However,it is difficult to obtain reasonable initial cable force in construction stage.In this study,stress balance and influence matrix methods were developed to determine the initial cable force of cantilever casting concrete arch bridge.The stress balance equation and influence matrix of arch rib critical section were established,and the buckle cable force range was determined by the allowable stress of arch rib critical section.Then a group of buckle cable forces were selected and substituted into the stress balance equation,and the reasonable initial buckle cable force was determined through iteration.Based on the principle of force balance,the initial anchor cable force was determined.In an engineering application example,it is shown that the stress balance and influence matrix methods for the determination of initial cable force are feasible and reliable.The initial cable forces of arch rib segments only need to be adjusted once in the corresponding construction process,which improves the working efficiency and reduces the construction risk.It is found that the methods have great advantages for determining initial cable force in cantilever casting construction process of concrete arch bridge. 展开更多
关键词 concrete arch bridge cantilever casting initial cable force stress balance method influence matrix method
下载PDF
Recent Construction Technology Innovations and Practices for Large-Span Arch Bridges in China
2
作者 Jielian Zheng 《Engineering》 SCIE EI CAS CSCD 2024年第10期110-129,共20页
Arch bridges provide significant technical and economic benefits under suitable conditions.In particular,concrete-filled steel tubular(CFST)arch bridges and steel-reinforced concrete(SRC)arch bridges are two types of ... Arch bridges provide significant technical and economic benefits under suitable conditions.In particular,concrete-filled steel tubular(CFST)arch bridges and steel-reinforced concrete(SRC)arch bridges are two types of arch bridges that have gained great economic competitiveness and span growth potential due to advancements in construction technology,engineering materials,and construction equipment over the past 30 years.Under the leadership of the author,two record-breaking arch bridges—that is,the Pingnan Third Bridge(a CFST arch bridge),with a span of 560 m,and the Tian’e Longtan Bridge(an SRC arch bridge),with a span of 600 m—have been built in the past five years,embodying great technological breakthroughs in the construction of these two types of arch bridges.This paper takes these two arch bridges as examples to systematically summarize the latest technological innovations and practices in the construction of CFST arch bridges and SRC arch bridges in China.The technological innovations of CFST arch bridges include cable-stayed fastening-hanging cantilevered assembly methods,new in-tube concrete materials,in-tube concrete pouring techniques,a novel thrust abutment foundation for nonrocky terrain,and measures to reduce the quantity of temporary facilities.The technological innovations of SRC arch bridges involve arch skeleton stiffness selection,the development of encasing concrete materials,encasing concrete pouring,arch rib stress mitigation,and longitudinal reinforcement optimization.To conclude,future research focuses and development directions for these two types of arch bridges are proposed. 展开更多
关键词 Concrete-filled steel tubular arch bridges Steel-reinforced concrete arch bridges Cable-stayed fastening-hanging cantilevered assembly Non-rocky thrust abutment foundation Stiff skeleton Encasing concrete pouring Longitudinal reinforcement optimization
下载PDF
The Forth Bridge's Human Cantilever:Engineering,Photography and Representation
3
作者 Angelo Maggi 《Journal of Civil Engineering and Architecture》 2019年第2期71-76,共6页
During the Victorian Age,when the results of ambitious engineering radically transformed the principles of construction,photography proved to be a faithful and indispensable witness.This is plainly seen in the magnifi... During the Victorian Age,when the results of ambitious engineering radically transformed the principles of construction,photography proved to be a faithful and indispensable witness.This is plainly seen in the magnificent enterprise to build the railway bridge over the Forth River,accurately captured by the lens of the photographer and engineer Evelyn George Carey,whose excellent work to record those events is without equal.His almost daily annotations were free from symbolic meaning and monumental tendencies:it was the bridge itself that held the most important role.In the form of an experiment it was decided to illustrate the principle of the cantilever at the Royal Institution in 1887.It was during that particular circumstance that Carey produced the famous photographic image of the Human Cantilever.Carey presents to the observer an encyclopaedic array of representations and helps to truly visualise engineering. 展开更多
关键词 bridge ENGINEERING cantilevER technology PHOTOGRAPHY nineteenth CENTURY architecture
下载PDF
Influence of concrete differential aging time on the construction phases analysis of the Fenghua River Bridge 被引量:1
4
作者 余报楚 《Journal of Chongqing University》 CAS 2004年第2期34-37,共4页
The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper... The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper, a finite element method (FEM) model is set up to study the effects of concrete differential aging time on the construction phases of the Fenghua River Bridge by calculating the vertical displacement of the folding segment of the middle span and the longitudinal bending moment of Pier 12#. In the model, the girders are classified into 150 changing sections based on the desgn scheme, and their construction is to be carried in 16 phases respectively to build 12 blocks connected by a side folding segment and a middle folding segment, covered with a second dead load and in completion for 20 years. It is found that the internal forces and deformations of the concrete structures at the aging time of 60 d are quite different from those of 0 d aging time while the behaviors of the structures of 120 d aging time is nearly the same as those of 60 d aging time― the differences are so small that can be neglected, suggesting that the creep develops obviously about one month after the cement is hardened and the development fades later on. 展开更多
关键词 the Fenghua River bridge prepress concrete successional box girder cantilever construction construction control concrete differential aging time
下载PDF
Effect of concrete creep on pre-camber of continuous rigid-frame bridge
5
作者 贺国京 李媛媛 +1 位作者 邹中权 段靓靓 《Journal of Central South University》 SCIE EI CAS 2008年第S1期337-341,共5页
The effect of concrete creep on the pre-camber of a long-span pre-stressed concrete continuous rigid-frame bridge constructed by cantilever casting method was investigated.The difference of creep coefficients calculat... The effect of concrete creep on the pre-camber of a long-span pre-stressed concrete continuous rigid-frame bridge constructed by cantilever casting method was investigated.The difference of creep coefficients calculated with two Chinese codes was discussed.Based on the calculations,the pre-camber of a pre-stressed concrete continuous rigid-frame box bridge was computed for construction control purpose.The results show that the short-term creep coefficient and long-term creep coefficient calculated with the CC-1985 are larger than those calculated with the CC-2004,while the medium-term creep coefficient calculated with the CC-1985 is smaller than that calculated with the CC-2004.The difference of creep deformation calculated with these two codes is small,and the influences of concrete creep on the pre-camber for most of the segments are negligible.The deflections and stresses of the box girder measured during the construction stages agree very well with the predictions. 展开更多
关键词 CREEP pre-stressed concrete continuous rigid-frame bridge cantilevER CASTING method PRE-CAMBER
下载PDF
Research on the special lifting devices for steel box girders of Sutong Bridge
6
作者 Chen Ming Wu Qihe +1 位作者 Luo Chengbin Zhou Hanfa 《Engineering Sciences》 EI 2009年第1期63-68,F0003,共7页
Sutong Bridge is a cable-stayed bridge with a steel box girder and a main span of 1 088 m.The steel box girder of main span includes five portions:back span large unit,large block of pylon,standard girder,back span cl... Sutong Bridge is a cable-stayed bridge with a steel box girder and a main span of 1 088 m.The steel box girder of main span includes five portions:back span large unit,large block of pylon,standard girder,back span closure girder and middle span closure girder.Each back span large unit is fabricated by welding several deck segments together in factory,and is erected by floating crane.As navigational clearance of the main bridge is high,the traditional truss lifting device can't satisfy the requirement of domestic lifting cranes for this kind of lifting height and weight.Hence,a kind of lighter lifting device for the erection of back span large units was accepted for this bridge.In this paper,the design and use of this lifting device is introduced.The upper structure used lifting gantry to install the standard girder segment by cantilever method.Because the bridge's navigation clearance is high,and the girder segment is wide and heavy,the meteorology and hydrology condition of the bridge district is abominable,and the requirements of long cable girder side pull-in,structure and performance propose high request to the lifting gantry.In this paper,the design and use key point of long cable pull-in angle adjustment device integrate into lifting gantry is introduced. 展开更多
关键词 Sutong bridge large units lifting devices cantilever installation lifting gantry design and use
下载PDF
大跨径预应力混凝土连续梁桥施工监控技术研究
7
作者 查李剑 《价值工程》 2025年第1期62-64,共3页
桥梁结构理想的几何线形与合理的内力状态不仅与设计有关,而且还依赖于科学合理的施工方法。如何通过施工时的浇筑过程的控制以及结构标高调整来获得预先设计的应力状态和几何线形,是大跨桥梁施工中非常关键的问题。因此,在对大跨度预... 桥梁结构理想的几何线形与合理的内力状态不仅与设计有关,而且还依赖于科学合理的施工方法。如何通过施工时的浇筑过程的控制以及结构标高调整来获得预先设计的应力状态和几何线形,是大跨桥梁施工中非常关键的问题。因此,在对大跨度预应力混凝土桥梁施工过程中,为了保障其施工质量及安全性,应采取必要的监控技术对其进行检测。本文以实际工程为例,对监控技术进行总结,为类似大跨度预应力混凝土桥梁施工监控提供借鉴作用。 展开更多
关键词 预应力混凝土 悬臂桥梁 施工监控
下载PDF
长阳天池口清江特大桥主拱圈悬臂浇筑斜拉扣挂系统设计 被引量:1
8
作者 周水兴 孙峰 段佳旺 《世界桥梁》 北大核心 2024年第3期61-67,共7页
长阳天池口清江特大桥主桥为净跨径242 m的非对称上承式钢筋混凝土拱桥,主拱圈采用单箱单室截面,宽9.5 m、高4.0 m。资丘岸和五峰岸半跨主拱圈各分为24个和21个节段,第1个节段采用支架现浇,其余节段采用斜拉扣挂悬臂浇筑法施工。扣索采... 长阳天池口清江特大桥主桥为净跨径242 m的非对称上承式钢筋混凝土拱桥,主拱圈采用单箱单室截面,宽9.5 m、高4.0 m。资丘岸和五峰岸半跨主拱圈各分为24个和21个节段,第1个节段采用支架现浇,其余节段采用斜拉扣挂悬臂浇筑法施工。扣索采用星式和扇形组合方式布置,位于墩顶和扣塔的扣索为星式布置,位于交界墩墩身的扣索为扇形布置,并将墩身上的扣锚索设计成连续索以避免在墩身上搭设张拉平台;扣塔由8根∅800 mm×16 mm钢管组成,两岸扣塔分别高52.68 m和60.12 m;根据锚索最大索力,设计了能承受800 kN张拉力的岩锚索。建立主拱圈悬臂浇筑施工阶段MIDAS Civil有限元模型,对斜拉扣挂系统扣锚索索力进行计算,通过拆除部分扣索和调整扣锚索索力,施工期间主拱圈截面最大拉应力、扣塔最大偏位、主拱圈成拱后线形均满足要求。 展开更多
关键词 钢筋混凝土拱桥 主拱圈 悬臂浇筑 斜拉扣挂系统 扣锚索 拉应力 扣塔偏位 成拱线形
下载PDF
高速铁路大跨度钢桁架桥接触网腕臂安装技术研究 被引量:1
9
作者 卢广苗 《铁道标准设计》 北大核心 2024年第4期186-192,共7页
高速铁路大跨度钢桁架桥纵向伸缩量大且变位复杂,是影响接触网腕臂偏移等系统能否正常、安全运行的重要因素,如何解决接触网腕臂安装、偏移调整与钢梁伸缩之间的协同配合,目前国内在此方面鲜有研究。通过阐述受导线伸缩影响的腕臂偏移... 高速铁路大跨度钢桁架桥纵向伸缩量大且变位复杂,是影响接触网腕臂偏移等系统能否正常、安全运行的重要因素,如何解决接触网腕臂安装、偏移调整与钢梁伸缩之间的协同配合,目前国内在此方面鲜有研究。通过阐述受导线伸缩影响的腕臂偏移机理和大跨度钢桁架桥梁体纵向伸缩机理,分析在不同接触网锚段布置方式下大跨度钢桁架桥梁体伸缩对腕臂偏移的影响,并采用逐工点分析法总结不同工况下钢梁伸缩与导线伸缩对腕臂偏移影响的相互关系,揭示了接触网腕臂安装曲线在导线伸缩及钢梁伸缩共同作用下的计算方法。结合典型案例计算分析,建议采用不同钢梁跨度下的推荐锚段布置方式能有效降低腕臂偏移量,并提出应重点关注伸缩缝两侧锚段腕臂偏移问题、腕臂偏移为叠加关系时缩小半锚长度、钢梁跨度大于720 m时应重点计算伸缩缝两侧双腕臂间距等优化事项。研究内容及计算公式可为系统性解决高速铁路大跨度钢桁架桥接触网腕臂偏移设计、施工及运营维护等技术难题提供理论支持。 展开更多
关键词 高速铁路 大跨度桥 钢桁架桥 钢梁伸缩 接触网 腕臂偏移 腕臂安装曲线
下载PDF
武汉青山长江公路大桥宽幅钢箱梁悬臂拼装横向线形匹配技术
10
作者 张晶 赵全成 戚原 《桥梁建设》 EI CSCD 北大核心 2024年第2期139-144,共6页
武汉青山长江公路大桥主桥为主跨938 m的双塔双索面全飘浮体系斜拉桥,主跨整体式钢箱梁高4.5 m、全宽48 m,采用500 t架梁吊机分节段悬臂拼装架设。钢箱梁悬臂拼装时,架梁吊机站位节段、待架节段由于荷载及约束不同,横截面变形呈现出不... 武汉青山长江公路大桥主桥为主跨938 m的双塔双索面全飘浮体系斜拉桥,主跨整体式钢箱梁高4.5 m、全宽48 m,采用500 t架梁吊机分节段悬臂拼装架设。钢箱梁悬臂拼装时,架梁吊机站位节段、待架节段由于荷载及约束不同,横截面变形呈现出不同的趋势,线形匹配难度大。为解决该问题,主跨钢箱梁悬臂拼装时选择上、下游分体式架梁吊机,减少架梁吊机自重;经比选选择横桥向27.7 m间距的架梁吊机站位,减小了架梁吊机荷载对横向线形匹配的影响;通过设置顶压装置(由顶压牛腿、支承底座组成),在架梁吊机站位节段、待架节段钢箱梁边腹板处施加1500 kN顶压力,配合少量马板,一次加载完成对接口竖向变形匹配调整。施工后,钢箱梁横向线形匹配精度均满足要求。 展开更多
关键词 斜拉桥 宽幅钢箱梁 悬臂拼装 分体式架梁吊机 吊机站位 顶压牛腿 匹配技术
下载PDF
斜拉扣挂悬臂浇筑拱桥扣索力与锚索力确定方法研究
11
作者 周水兴 周琳淇 刘彬 《桥梁建设》 EI CSCD 北大核心 2024年第5期140-147,共8页
为解决钢筋混凝土拱桥拱圈悬臂浇筑施工过程中,由悬浇节段自重和挂篮重引起的部分拱圈截面拉应力与塔架偏位过大的问题,提出扣索力与锚索力确定方法。该方法基于应力叠加原理和影响矩阵确定扣索力,给出当拱圈截面拉应力不满足要求时的... 为解决钢筋混凝土拱桥拱圈悬臂浇筑施工过程中,由悬浇节段自重和挂篮重引起的部分拱圈截面拉应力与塔架偏位过大的问题,提出扣索力与锚索力确定方法。该方法基于应力叠加原理和影响矩阵确定扣索力,给出当拱圈截面拉应力不满足要求时的扣索拆除判定方法;提出通过锚索力修正系数主动调控扣索力与锚索力,使塔架产生与拱圈悬浇阶段数值接近、方向相反的偏位,给出能同时满足拱圈应力、塔架偏位和成拱线形要求的扣索力与锚索力的计算流程。以净跨径180 m的混凝土拱桥——毕节白甫河管桥为背景,开展扣索力、锚索力以及锚索力修正系数的计算,对扣索力、锚索力、拱圈应力、成拱线形和两岸塔架偏位的计算值和实测值进行对比验证。结果表明:利用所提方法得到的扣索力、锚索力与实际张拉力最大相差6.02%,该桥施工时,依次拆除5组扣索,使拱圈截面拉应力均满足设计要求;塔架偏位实测最大值为3.3 cm,满足小于最大容许偏位4.0 cm的要求;拱圈截面实测最大拉应力为1.74 MPa,满足小于1.8 MPa的拉应力设计要求,成拱线形与裸拱线形最大偏差为0.5 cm,拱圈线形良好,验证了所提方法的可行性。 展开更多
关键词 混凝土拱桥 斜拉扣挂 悬臂浇筑 扣索力 锚索力 塔架偏位 锚索力修正系数 有限元法
下载PDF
基于比拟杆法的变截面连续箱梁剪力滞效应分析
12
作者 冀伟 石旭辉 +2 位作者 罗子钧 罗奎 黄逸航 《计算力学学报》 CAS CSCD 北大核心 2024年第6期1053-1059,共7页
针对现有的剪力滞效应分析方法难以适用于变截面连续箱梁的问题,本文基于比拟杆法提出了一种变截面混凝土连续箱梁剪力滞效应分析方法。首先,利用比拟杆法建立了变截面连续箱梁剪力滞效应的控制微分方程;其次,利用有限元分析结果和试验... 针对现有的剪力滞效应分析方法难以适用于变截面连续箱梁的问题,本文基于比拟杆法提出了一种变截面混凝土连续箱梁剪力滞效应分析方法。首先,利用比拟杆法建立了变截面连续箱梁剪力滞效应的控制微分方程;其次,利用有限元分析结果和试验实测结果对本文理论的正确性和适用性进行了验证,并分析了不同单元类型对剪力滞效应分析的影响;最后,对3跨混凝土连续箱梁悬臂施工过程中的剪力滞效应进行了分析。研究表明,3跨变截面连续梁上翼缘板的剪力滞效应中支座处最明显,中跨跨中处剪力滞效应次之,中支座和中跨跨中之间区域的剪力滞效应可忽略不计。在3跨连续梁的整个悬臂施工过程中,0号块上下翼缘板的剪力滞效应逐渐减小;成桥后,0号块上下翼缘板的剪力滞效应增大。在3跨连续梁的整个悬臂施工过程中,1号块上下翼缘板的正剪力滞效应逐渐减小;1号块上下翼缘板的剪力滞效应减小。研究结论可为变截面连续梁的剪力滞效应分析计算提供参考依据。 展开更多
关键词 桥梁工程 剪力滞效应 比拟杆法 变截面连续箱梁 悬臂施工
下载PDF
大跨径斜拉桥施工阶段临时抗风措施对比分析
13
作者 刘旭政 曾健峰 王丰平 《铁道工程学报》 EI CSCD 北大核心 2024年第1期39-44,52,共7页
研究目的:大跨径斜拉桥在最大双悬臂施工状态下结构刚度较小,对风荷载引起的结构风致振动响应较为敏感。本文以受沿海台风影响区域的一座主跨316 m斜拉桥为研究对象,根据风洞试验确定主梁的气动三分力系数,对比分析不同风缆布置方案与... 研究目的:大跨径斜拉桥在最大双悬臂施工状态下结构刚度较小,对风荷载引起的结构风致振动响应较为敏感。本文以受沿海台风影响区域的一座主跨316 m斜拉桥为研究对象,根据风洞试验确定主梁的气动三分力系数,对比分析不同风缆布置方案与不同临时墩布置方式对大桥风致响应控制效果的影响。研究结论:(1)增设临时风缆可使主梁竖弯基频提高22.0%~32.5%,对结构自身的扭转基频影响效果不显著;临时风缆对主梁竖向位移和主塔顺桥向位移控制有一定作用,固定位置在主梁最大悬臂长度的80%~90%范围内效果较好;(2)临时墩的抗风减振效果显著优于临时风缆,临时墩的设置使主梁悬臂端竖向位移响应降低了53.5%~65.5%,对主梁悬臂根部的顺桥向弯矩与横桥向弯矩的控制效果较为明显,降幅11.7%~58.8%;(3)在选择桥梁临时抗风措施时,需综合考虑抗风需求、施工条件、施工风险和经济性;(4)本研究成果可为大跨度斜拉桥临时抗风措施的选择提供参考。 展开更多
关键词 斜拉桥 最大双悬臂施工状态 临时墩 临时风缆 风致响应
下载PDF
基于压弯破坏曲面的桥墩可靠性分析
14
作者 王佐才 王建业 +1 位作者 辛宇 石岩 《世界桥梁》 北大核心 2024年第3期68-75,共8页
非对称桥梁结构悬臂施工期间会对下部结构产生较大的不平衡弯矩,为分析钢筋混凝土(Reinforced Concrete,RC)墩柱在不平衡弯矩导致的双轴压弯下的可靠性,提出了基于压弯破坏曲面的可靠性分析方法。该方法使用倪克勤公式作为功能函数,并... 非对称桥梁结构悬臂施工期间会对下部结构产生较大的不平衡弯矩,为分析钢筋混凝土(Reinforced Concrete,RC)墩柱在不平衡弯矩导致的双轴压弯下的可靠性,提出了基于压弯破坏曲面的可靠性分析方法。该方法使用倪克勤公式作为功能函数,并通过钢筋与混凝土本构关系求解倪克勤公式所需要的轴心受压承载力与单向偏压承载力,将RC墩柱的材料特性、几何特性、所受外部荷载作为随机变量,基于可靠指标物理意义,使用罚函数法将可靠指标求解问题转化为无约束最优化问题,利用遗传退火算法求解RC墩柱的可靠指标。采用该方法对文忠路上跨合肥东站改扩建工程主桥46号桥墩进行可靠性分析,结果表明:在悬臂施工至自重不平衡弯矩最大状态下,P1~P3支墩可靠指标分别为5.44、5.05、5.94;对可靠指标影响程度较大的随机变量依次为结构自重、钢筋强度和混凝土抗压强度,而风荷载对可靠指标影响相对较小。 展开更多
关键词 桥梁工程 桥墩 非对称悬臂施工 压弯破坏曲面 可靠性分析 灵敏度分析 工程应用
下载PDF
基于精细化建模的多跨连续刚构桥悬臂施工控制有限元分析
15
作者 唐鹏 《安徽水利水电职业技术学院学报》 2024年第5期50-55,共6页
连续刚构桥在悬臂浇筑施工中,由于结构体系随着施工进程而不断变化,导致结构的受力和变形变化幅度较大。为确保多跨连续刚构桥顺利合龙且应力状态满足设计要求,需对施工中结构状态进行分析。以马金任河特大桥主桥为工程背景,通过建立精... 连续刚构桥在悬臂浇筑施工中,由于结构体系随着施工进程而不断变化,导致结构的受力和变形变化幅度较大。为确保多跨连续刚构桥顺利合龙且应力状态满足设计要求,需对施工中结构状态进行分析。以马金任河特大桥主桥为工程背景,通过建立精细化的有限元模型并计算分析了各施工阶段桥梁的结构参数指标,获得了主梁的内力状态及施工预变形值,结果表明:成桥后桥梁结构的受力状态与目标一致,该控制方法的实际应用效果良好,可以为其他类似工程提供一定的借鉴。 展开更多
关键词 连续刚构桥 悬臂浇筑 有限元分析
下载PDF
大跨公铁两用钢桁拱桥边跨施工关键技术
16
作者 周仁忠 康学云 +1 位作者 唐震 刘华龙 《世界桥梁》 北大核心 2024年第5期30-36,共7页
常泰长江大桥天星洲专用航道桥为(168+388+168)m大跨重载公铁两用钢桁拱桥。主梁采用2片主桁双层板桁组合结构,边跨钢梁施工采用架梁吊机悬臂散件拼装。为确保边跨钢梁架设轴线和竖曲线线形,按照最快形成稳定桁片结构原则拼装,上墩前悬... 常泰长江大桥天星洲专用航道桥为(168+388+168)m大跨重载公铁两用钢桁拱桥。主梁采用2片主桁双层板桁组合结构,边跨钢梁施工采用架梁吊机悬臂散件拼装。为确保边跨钢梁架设轴线和竖曲线线形,按照最快形成稳定桁片结构原则拼装,上墩前悬臂拼装并形成三角桁片稳定结构后再实施抄垫;在钢梁架设过程中对钢梁标高进行调整,精确控制钢梁上墩标高;为确保边跨钢梁架设结构受力满足要求,通过有限元理论分析比选,确定临时墩最优脱空时机;采用“基于空间六点调位法”对边跨钢梁进行整体精确定位;主墩支座采用重力法灌浆;基于多点变形协调,通过优化杆件安装工艺,解决了超静定结构杆件带力安装难题。 展开更多
关键词 钢桁拱桥 悬臂散件拼装 上墩标高 临时墩脱空 钢梁调位 支座灌浆 杆件带力安装 施工技术
下载PDF
济阳黄河公铁两用特大桥施工关键技术 被引量:5
17
作者 姜贺 牛伟锋 +1 位作者 韩胜利 李宁 《世界桥梁》 北大核心 2024年第1期45-50,共6页
济阳黄河公铁两用特大桥主桥为(84+144+228+240+300+120+60)m非对称、多跨、不等高、矮塔钢桁梁斜拉桥,采用塔梁固结、塔墩分离的结构体系。主梁采用N形双主桁、双层桥面布置,上层通行6车道公路,下层通行双线铁路。主墩桩基利用黄河枯... 济阳黄河公铁两用特大桥主桥为(84+144+228+240+300+120+60)m非对称、多跨、不等高、矮塔钢桁梁斜拉桥,采用塔梁固结、塔墩分离的结构体系。主梁采用N形双主桁、双层桥面布置,上层通行6车道公路,下层通行双线铁路。主墩桩基利用黄河枯水期采用大型旋挖钻机成孔,位于黄河主河槽的主墩承台采用锁口钢管桩围堰成套施工技术,其余主墩采用钢板桩围堰施工。主墩承台大体积混凝土结构采用自动测温及内部循环冷却水控制的智能化温度控制系统,承台混凝土未出现有害裂纹。钢桁梁利用门吊吊装杆件,设置墩旁托架和临时墩,采用双悬臂拼装+单侧悬臂拼装方式架设,结合钢塔两侧跨度不对称及跨黄河险工河段、施工条件受限等特点,通过定点精确配重+移动配重+索力调整,确保了钢桁梁线形满足设计要求、架设过程安全稳定。钢塔利用组合起重设备和定位工装分节组拼,钢横梁利用塔顶吊架整体提升,保证了钢塔安装精度。 展开更多
关键词 公路铁路两用桥 矮塔斜拉桥 钢围堰 智能化温度控制系统 不等跨悬臂架设 移动配重 塔顶吊架 施工技术
下载PDF
基于零位移与无应力状态控制的斜拉扣挂施工扣索力确定方法 被引量:4
18
作者 余玉洁 罗永琪 +1 位作者 周文 蒋丽忠 《工程科学与技术》 EI CAS CSCD 北大核心 2024年第3期83-89,共7页
大跨度拱桥常采用斜拉扣挂法开展拱肋施工,但在节段拼装过程中扣索索力和拱肋空间位形之间互相影响,索力优化计算以及扣索状态控制问题复杂。提出改进零位移法结合无应力状态控制法的复合扣索力计算方法:基于改进型零位移法快速得到满... 大跨度拱桥常采用斜拉扣挂法开展拱肋施工,但在节段拼装过程中扣索索力和拱肋空间位形之间互相影响,索力优化计算以及扣索状态控制问题复杂。提出改进零位移法结合无应力状态控制法的复合扣索力计算方法:基于改进型零位移法快速得到满足成拱线形要求的扣索力大小,基于成拱索力采用无应力状态法反推各施工阶段扣索索力。该复合方法可避免传统零位移法扣索力不准和反复迭代计算的缺陷,施工中扣索可实现一次张拉,后续节段拼装中无需对扣索进行索力调整。以某跨径430 m大跨度钢管混凝土拱桥缆扣合一施工为工程应用背景,采用的零位移法结合无应力状态法对大跨度非对称式钢结构拱肋进行斜拉扣挂拼装的扣索力求解和施工模拟。分析拼装过程中扣索力变化规律,并对比验证实际线形与目标线形偏差,以及拱肋应力与设计应力之间偏差程度。结果表明,所提出的复合算法理论简单且索力求解计算便捷。所求的扣索力可有效保证拱肋拼装完成及松索后拱肋线形和受力均满足要求。 展开更多
关键词 钢管混凝土拱桥 斜拉扣挂法 扣索力计算 零位移法 无应力状态法
下载PDF
大跨度钢底板-波形钢腹板组合箱梁桥设计
19
作者 胡志红 赵鹏磊 +1 位作者 刘建 丁德豪 《桥梁建设》 EI CSCD 北大核心 2024年第6期117-124,共8页
武松高速武汉段通顺河3号特大桥主桥采用(95+170+95)m连续组合箱梁桥,左、右幅错孔布置。主梁采用单箱单室钢底板-波形钢腹板组合箱梁(墩顶主梁为钢-混结合段),由混凝土顶板和钢主梁通过双PBL剪力键组合而成,单幅顶板宽16.75 m,中墩支... 武松高速武汉段通顺河3号特大桥主桥采用(95+170+95)m连续组合箱梁桥,左、右幅错孔布置。主梁采用单箱单室钢底板-波形钢腹板组合箱梁(墩顶主梁为钢-混结合段),由混凝土顶板和钢主梁通过双PBL剪力键组合而成,单幅顶板宽16.75 m,中墩支点梁高9.2 m,边墩支点及跨中梁高3.8 m。钢主梁由上翼缘板、波形钢腹板、钢底板和横隔板组成,标准节段长4.8 m,波形钢腹板采用1600型,顶部设置带双PBL剪力键的上翼缘板,钢底板加劲采用板肋和T肋,钢梁节段内设置实腹式和桁架式2种形式的横隔板。混凝土顶板厚32 cm,采用C60高性能混凝土,在箱梁顶板内设置体内预应力体系,并在箱室内设置体外预应力体系。钢-混结合段波形钢腹板采用埋入的连接方式伸入到混凝土腹板内,底板钢-混结合构造中墩处采用“钢格室+剪力键+后承压板”的形式,边墩处采用钢底板上设置剪力键并外包混凝土底板的形式。单幅主墩采用门式框架墩,基础为整体式承台及直径2.2 m钻孔灌注桩。上部结构0号块和边跨现浇段采用支架现浇法施工,悬臂段采用异步挂篮拼装(浇筑)施工,按先边跨后中跨的顺序合龙。采用有限元软件建立主桥杆系模型和边跨实体模型进行结构分析,结果表明该桥各项指标均满足规范要求。 展开更多
关键词 连续梁桥 组合箱梁 波形钢腹板 钢底板 预应力 异步悬臂施工 桥梁设计
下载PDF
宜宾临港长江公铁大桥主桥超宽钢箱梁施工关键技术 被引量:4
20
作者 杨如刚 陈正 +2 位作者 于志兵 陈博 化苏文 《桥梁建设》 EI CSCD 北大核心 2024年第1期16-22,共7页
宜宾临港长江公铁大桥主桥为主跨522 m的公铁同层双塔双索面钢箱梁斜拉桥,主桥钢箱梁宽63.9 m、高5 m,节段最大重量519.6 t。钢箱梁采用分部件加工、节段整体制作、场内预拼装方案制造。南岸钢箱梁采用边跨顶推+中跨单悬臂施工;北岸钢... 宜宾临港长江公铁大桥主桥为主跨522 m的公铁同层双塔双索面钢箱梁斜拉桥,主桥钢箱梁宽63.9 m、高5 m,节段最大重量519.6 t。钢箱梁采用分部件加工、节段整体制作、场内预拼装方案制造。南岸钢箱梁采用边跨顶推+中跨单悬臂施工;北岸钢箱梁采用边跨存梁+双悬臂施工;中跨合龙段采用配切+顶推合龙。采用钢箱梁顶板与底板单元两拼工艺、钢箱梁锚固块体多工序组拼、预设反变形量的长线法总拼等制造技术,有效解决了超宽钢箱梁焊接变形量大的问题,大大提高了钢箱梁制造精度;南岸边跨钢箱梁利用中跨侧来梁进行顶推施工,解决了边跨运梁、吊梁施工难的问题,且避免了占用既有道路;北岸边跨钢箱梁利用枯水期预先存梁,解决了浅滩区钢箱梁施工受季节性水文影响大的问题,为双悬臂施工提供了先决条件;中跨合龙段采用现场配切+顶推施工,实现主跨钢箱梁精确合龙。 展开更多
关键词 公路铁路两用桥 斜拉桥 钢箱梁 顶推施工 悬臂架设 存梁 合龙 施工技术