To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of re...To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of residual wind power.By studying the mathematical model of wind power output and calculating surplus wind power,as well as considering the hydrogen production/storage characteristics of the electrolyzer and hydrogen storage tank,an innovative capacity optimization allocation model was established.The objective of the model was to achieve the lowest total net present value over the entire life cycle.The model took into account the cost-benefit breakdown of equipment end-of-life cost,replacement cost,residual value gain,wind abandonment penalty,hydrogen transportation,and environmental value.The MATLAB-based platform invoked the CPLEX commercial solver to solve the model.Combined with the analysis of the annual average wind speed data from an offshore wind farm in Guangdong Province,the optimal capacity configuration results and the actual operation of the hydrogen production system were obtained.Under the calculation scenario,this hydrogen production system could consume 3,800 MWh of residual electricity from offshore wind power each year.It could achieve complete consumption of residual electricity from wind power without incurring the penalty cost of wind power.Additionally,it could produce 66,500 kg of green hydrogen from wind power,resulting in hydrogen sales revenue of 3.63 million RMB.It would also reduce pollutant emissions from coal-based hydrogen production by 1.5 tons and realize an environmental value of 4.83 million RMB.The annual net operating income exceeded 6 million RMB and the whole life cycle NPV income exceeded 50 million RMB.These results verified the feasibility and rationality of the established capacity optimization allocation model.The model could help advance power system planning and operation research and assist offshore wind farm operators in improving economic and environmental benefits.展开更多
In electrified railways,traction load not only fluctuates between peaks and valleys,but also has a situation of low utilization rate of average load throughout the day and short overload.The traction transformer selec...In electrified railways,traction load not only fluctuates between peaks and valleys,but also has a situation of low utilization rate of average load throughout the day and short overload.The traction transformer selects the capacity with the peak load as the demand boundary,which will cause the capacity utilization rate to be low and even lead to the economic decline of the traction power supply system.This article summarizes the existing configuration methods for capacity optimization of traction transformer.Then under the conditions of energy storage and new energy access to traction power supply system,the three aspects are described as follows.Firstly,the energy storage device is connected to the system,which can pull the capacity of traction transformer to achieve peak shifting and valley filling.Then,the possibility of integrated configuration of new energy and traction power supply system to optimize the capacity of traction transformer and the methods of optimal configuration of traction transformer capacity by using new energy such as wind and light are summarized.Finally,this paper discusses the current structure of new energy access to traction power supply system,and it looks forward to the feasibility of new energy access to traction power supply system cooperating with energy storage devices to optimize the capacity of traction transformer.展开更多
Using Genetic Algorithms (GAs) is a powerful tool to get solution to large scale design optimization problems. This paper used GA to solve complicated design optimization problems in two different applications. The ai...Using Genetic Algorithms (GAs) is a powerful tool to get solution to large scale design optimization problems. This paper used GA to solve complicated design optimization problems in two different applications. The aims are to implement the genetic algorithm to solve these two different (nested) problems, and to get the best or optimization solutions.展开更多
The development of anode materials with high rate capability and long charge-discharge plateau is the key to improve per-formance of lithium-ion capacitors(LICs).Herein,the porous graphitic carbon(PGC-1300)derived fro...The development of anode materials with high rate capability and long charge-discharge plateau is the key to improve per-formance of lithium-ion capacitors(LICs).Herein,the porous graphitic carbon(PGC-1300)derived from a new triply interpenetrated co-balt metal-organic framework(Co-MOF)was prepared through the facile and robust carbonization at 1300°C and washing by HCl solu-tion.The as-prepared PGC-1300 featured an optimized graphitization degree and porous framework,which not only contributes to high plateau capacity(105.0 mAh·g^(−1)below 0.2 V at 0.05 A·g^(−1)),but also supplies more convenient pathways for ions and increases the rate capability(128.5 mAh·g^(−1)at 3.2 A·g^(−1)).According to the kinetics analyses,it can be found that diffusion regulated surface induced capa-citive process and Li-ions intercalation process are coexisted for lithium-ion storage.Additionally,LIC PGC-1300//AC constructed with pre-lithiated PGC-1300 anode and activated carbon(AC)cathode exhibited an increased energy density of 102.8 Wh·kg^(−1),a power dens-ity of 6017.1 W·kg^(−1),together with the excellent cyclic stability(91.6%retention after 10000 cycles at 1.0 A·g^(−1)).展开更多
To improve the operation efficiency of the photovoltaic power station complementary power generation system,an optimal allocation model of the photovoltaic power station complementary power generation capacity based o...To improve the operation efficiency of the photovoltaic power station complementary power generation system,an optimal allocation model of the photovoltaic power station complementary power generation capacity based on PSO-BP is proposed.Particle Swarm Optimization and BP neural network are used to establish the forecasting model,the Markov chain model is used to correct the forecasting error of the model,and the weighted fitting method is used to forecast the annual load curve,to complete the optimal allocation of complementary generating capacity of photovoltaic power stations.The experimental results show that thismethod reduces the average loss of photovoltaic output prediction,improves the prediction accuracy and recall rate of photovoltaic output prediction,and ensures the effective operation of the power system.展开更多
Wireless statistic division multiplexing (WSDM) is a multiplexing scheme that transmits multiple signals simultaneously in the same frequency band over wireless channels. Based on the Shannon capacity of band-limited ...Wireless statistic division multiplexing (WSDM) is a multiplexing scheme that transmits multiple signals simultaneously in the same frequency band over wireless channels. Based on the Shannon capacity of band-limited waveform AWGN channel with input power constraint, we obtain channel capacity of WSDM. Compared to time division multiplexing (TDM), frequency division multiplexing (FDM), and code division multiplexing (CDM), WSDM is more effective in raising spectrum efficiency. What’s more, we propose information optimization method to separate time-frequency mixed signals. Computer simulations also verify that the proposed method is feasible and performs better than traditional algorithms.展开更多
Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we p...Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.展开更多
A unified power flow controller(UPFC)combines the advantages of various flexible alternating current transmission system(FACTS)devices into a powerful format.Using a 500 kV power grid,this study evaluates the selectio...A unified power flow controller(UPFC)combines the advantages of various flexible alternating current transmission system(FACTS)devices into a powerful format.Using a 500 kV power grid,this study evaluates the selection and use of a UPFC to improve transmission capacity.The"UPFC unit capacity control proportionality coefficient"is introduced to quantify the control effect of the UPFC,and an optimal calculation method for the UPFC capacity is presented.Following the proposal of a UPFC site selection process,the data of an existing power grid is used to conduct simulations.The simulation results show that the UPFC has a strong ability to improve transmission capacity,and its use is greatly advantageous.Additionally,by applying the proposed selection method,the control effect and economic benefits of the UPFC can be comprehensively considered during project site selection.These findings have a guiding significance for UPFC site selection in ultra-high voltage power grids.展开更多
The integrated energy system(IES)is an important energy supply method for mitigating the energy crisis.A station-and-network–coordinated planning method for the IES,which considers the integrated demand responses(IDR...The integrated energy system(IES)is an important energy supply method for mitigating the energy crisis.A station-and-network–coordinated planning method for the IES,which considers the integrated demand responses(IDRs)of flexible loads,electric vehicles,and energy storage is proposed in this work.First,based on load substitution at the user side,an energy-station model considering the IDR is established.Then,based on the characteristics of the energy network,a collaborative planning model is established for the energy station and energy network of the IES,considering the comprehensive system investment,operation and maintenance,and clean energy shortage penalty costs,to minimize the total cost.This can help optimize the locations of the power lines and natural gas pipelines and the capacities of the equipment in an energy station.Finally,simulations are performed to demonstrate that the proposed planning method can help delay or reduce the construction of new lines and energy-station equipment,thereby reducing the investment required and improving the planning economics of the IES.展开更多
Air route network optimization,one of the essential parts of the airspace planning,is an effective way to optimize airspace resources,increase airspace capacity,and alleviate air traffic congestion.However,little has ...Air route network optimization,one of the essential parts of the airspace planning,is an effective way to optimize airspace resources,increase airspace capacity,and alleviate air traffic congestion.However,little has been done on the optimization of air route network in the fragmented airspace caused by prohibited,restricted,and dangerous areas(PRDs).In this paper,an air route network optimization model is developed with the total operational cost as the objective function while airspace restriction,air route network capacity,and non-straight-line factors(NSLF) are taken as major constraints.A square grid cellular space,Moore neighbors,a fixed boundary,together with a set of rules for solving the route network optimization model are designed based on cellular automata.The empirical traffic of airports with the largest traffic volume in each of the 9 flight information regions in China's Mainland is collected as the origin-destination(OD) airport pair demands.Based on traffic patterns,the model generates 35 air routes which successfully avoids 144 PRDs.Compared with the current air route network structure,the number of nodes decreases by 41.67%,while the total length of flight segments and air routes drop by 32.03% and 5.82% respectively.The NSLF decreases by 5.82% with changes in the total length of the air route network.More importantly,the total operational cost of the whole network decreases by 6.22%.The computational results show the potential benefits of the model and the advantage of the algorithm.Optimization of air route network can significantly reduce operational cost while ensuring operation safety.展开更多
Quantum secure direct communication provides a direct means of conveying secret information via quantum states among legitimate users.The past two decades have witnessed its great strides both theoretically and experi...Quantum secure direct communication provides a direct means of conveying secret information via quantum states among legitimate users.The past two decades have witnessed its great strides both theoretically and experimentally.However,the security analysis of it still stays in its infant.Some practical problems in this field to be solved urgently,such as detector efficiency mismatch,side-channel effect and source imperfection,are propelling the birth of a more impeccable solution.In this paper,we establish a new framework of the security analysis driven by numerics where all the practical problems may be taken into account naturally.We apply this framework to several variations of the DL04 protocol considering real-world experimental conditions.Also,we propose two optimizing methods to process the numerical part of the framework so as to meet different requirements in practice.With these properties considered,we predict the robust framework would open up a broad avenue of the development in the field.展开更多
A hybrid energy storage system(HESS)plays an important role in balancing the cost with the performance in terms of stabilizing the fluctuant power of wind farms and photovoltaic(PV)stations.To further bring down the c...A hybrid energy storage system(HESS)plays an important role in balancing the cost with the performance in terms of stabilizing the fluctuant power of wind farms and photovoltaic(PV)stations.To further bring down the cost and actually implement the dispatchability of wind/PV plants,there is a need to penetrate into the major factors that contribute to the cost of the any HESS.This paper first discusses hybrid energy storage systems,as well as chemical properties in different medium,deeming the ramp rate as one of the determinants that must be observed in the cost calculation.Then,a mathematical tool,Copula,is explained in details for the purpose of unscrambling the dependences between the power of wind and PV plants.To lower the cost,the basic rule for allocation of buffered power is also put forward,with the minimum energy capacities of the battery ESS(BESS)and the supercapacitor ESS(SC-ESS)simultaneously determined by integration.And the paper introduces the probability method to analyze how power and energy is compensated in certain confidence level.After that,two definitions of coefficients are set up,separately describing energy storage status and wind curtailment level.Finally,the paper gives a numerical example stemmed from real data acquired in wind farms and PV stations in Belgium.The conclusion presents that the cost of a hybrid energy storage system is greatly affected by ramp-rate and dependence between the power of wind farms and photovoltaic stations,in which dependence can easily be determined by Copulas.展开更多
To achieve economical compensation for the huge-capacity negative sequence currents generated by high-speed railway load, an electromagnetic hybrid compensation system(EHCS) and control strategy is proposed.The EHCS i...To achieve economical compensation for the huge-capacity negative sequence currents generated by high-speed railway load, an electromagnetic hybrid compensation system(EHCS) and control strategy is proposed.The EHCS is made up of a small-capacity railway static power conditioner(RPC) and a large-capacity magnetic static var compensator(MSVC). Compared with traditional compensation methods, the EHCS makes full use of the SVC’s advantages of economy and reliability and of RPC’s advantages of technical capability and flexibility. Based on the idea of injecting a negative sequence, the compensation principle of the EHCS is analyzed in detail. Then the minimum installation capacity of an EHCS is theoretically deduced. Furthermore, a constraint optimization compensation strategy that meets national standards, which reduces compensation capacity further, is proposed. An experimental platform based on a digital signal processor(DSP) and a programmable logic controller(PLC) is built to verify the analysis. Simulated and experimental results are given to demonstrate the effectiveness and feasibility of the proposed method.展开更多
基金supported by Manage Innovation Project of China Southern Power Grid Co.,Ltd.(No.GZHKJXM20210232).
文摘To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of residual wind power.By studying the mathematical model of wind power output and calculating surplus wind power,as well as considering the hydrogen production/storage characteristics of the electrolyzer and hydrogen storage tank,an innovative capacity optimization allocation model was established.The objective of the model was to achieve the lowest total net present value over the entire life cycle.The model took into account the cost-benefit breakdown of equipment end-of-life cost,replacement cost,residual value gain,wind abandonment penalty,hydrogen transportation,and environmental value.The MATLAB-based platform invoked the CPLEX commercial solver to solve the model.Combined with the analysis of the annual average wind speed data from an offshore wind farm in Guangdong Province,the optimal capacity configuration results and the actual operation of the hydrogen production system were obtained.Under the calculation scenario,this hydrogen production system could consume 3,800 MWh of residual electricity from offshore wind power each year.It could achieve complete consumption of residual electricity from wind power without incurring the penalty cost of wind power.Additionally,it could produce 66,500 kg of green hydrogen from wind power,resulting in hydrogen sales revenue of 3.63 million RMB.It would also reduce pollutant emissions from coal-based hydrogen production by 1.5 tons and realize an environmental value of 4.83 million RMB.The annual net operating income exceeded 6 million RMB and the whole life cycle NPV income exceeded 50 million RMB.These results verified the feasibility and rationality of the established capacity optimization allocation model.The model could help advance power system planning and operation research and assist offshore wind farm operators in improving economic and environmental benefits.
基金supported in part by the National Natural Science Foundation of China(Project No.51767015)Lanzhou Jiaotong University-Tianjin University Joint Innovation Fund Project(Project No.2019051)the Tianyou Innovation Team Support Program of Lanzhou Jiaotong University(No.TY202009).
文摘In electrified railways,traction load not only fluctuates between peaks and valleys,but also has a situation of low utilization rate of average load throughout the day and short overload.The traction transformer selects the capacity with the peak load as the demand boundary,which will cause the capacity utilization rate to be low and even lead to the economic decline of the traction power supply system.This article summarizes the existing configuration methods for capacity optimization of traction transformer.Then under the conditions of energy storage and new energy access to traction power supply system,the three aspects are described as follows.Firstly,the energy storage device is connected to the system,which can pull the capacity of traction transformer to achieve peak shifting and valley filling.Then,the possibility of integrated configuration of new energy and traction power supply system to optimize the capacity of traction transformer and the methods of optimal configuration of traction transformer capacity by using new energy such as wind and light are summarized.Finally,this paper discusses the current structure of new energy access to traction power supply system,and it looks forward to the feasibility of new energy access to traction power supply system cooperating with energy storage devices to optimize the capacity of traction transformer.
文摘Using Genetic Algorithms (GAs) is a powerful tool to get solution to large scale design optimization problems. This paper used GA to solve complicated design optimization problems in two different applications. The aims are to implement the genetic algorithm to solve these two different (nested) problems, and to get the best or optimization solutions.
基金the National Natural Science Foundation of China(No.52004179)the Natural Nat-ural Science Foundation of Guangxi Province,China(No.2020GXNSFAA159015)Shanxi Water and Wood New Carbon Materials Technology Co.,Ltd.,China,and Shanxi Wote Haimer New Materials Technology Co.,Ltd,China.
文摘The development of anode materials with high rate capability and long charge-discharge plateau is the key to improve per-formance of lithium-ion capacitors(LICs).Herein,the porous graphitic carbon(PGC-1300)derived from a new triply interpenetrated co-balt metal-organic framework(Co-MOF)was prepared through the facile and robust carbonization at 1300°C and washing by HCl solu-tion.The as-prepared PGC-1300 featured an optimized graphitization degree and porous framework,which not only contributes to high plateau capacity(105.0 mAh·g^(−1)below 0.2 V at 0.05 A·g^(−1)),but also supplies more convenient pathways for ions and increases the rate capability(128.5 mAh·g^(−1)at 3.2 A·g^(−1)).According to the kinetics analyses,it can be found that diffusion regulated surface induced capa-citive process and Li-ions intercalation process are coexisted for lithium-ion storage.Additionally,LIC PGC-1300//AC constructed with pre-lithiated PGC-1300 anode and activated carbon(AC)cathode exhibited an increased energy density of 102.8 Wh·kg^(−1),a power dens-ity of 6017.1 W·kg^(−1),together with the excellent cyclic stability(91.6%retention after 10000 cycles at 1.0 A·g^(−1)).
文摘To improve the operation efficiency of the photovoltaic power station complementary power generation system,an optimal allocation model of the photovoltaic power station complementary power generation capacity based on PSO-BP is proposed.Particle Swarm Optimization and BP neural network are used to establish the forecasting model,the Markov chain model is used to correct the forecasting error of the model,and the weighted fitting method is used to forecast the annual load curve,to complete the optimal allocation of complementary generating capacity of photovoltaic power stations.The experimental results show that thismethod reduces the average loss of photovoltaic output prediction,improves the prediction accuracy and recall rate of photovoltaic output prediction,and ensures the effective operation of the power system.
文摘Wireless statistic division multiplexing (WSDM) is a multiplexing scheme that transmits multiple signals simultaneously in the same frequency band over wireless channels. Based on the Shannon capacity of band-limited waveform AWGN channel with input power constraint, we obtain channel capacity of WSDM. Compared to time division multiplexing (TDM), frequency division multiplexing (FDM), and code division multiplexing (CDM), WSDM is more effective in raising spectrum efficiency. What’s more, we propose information optimization method to separate time-frequency mixed signals. Computer simulations also verify that the proposed method is feasible and performs better than traditional algorithms.
基金funded by Major Science and Technology Projects in Gansu Province(19ZD2GA003).
文摘Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.
基金supported by State Grid Corporation’s Science and Technology Project“Research and Demonstration of Technical Measures for Improving Voltage Supporting Capacity of Large-scale Urban Power Grid”(52094016000Y)
文摘A unified power flow controller(UPFC)combines the advantages of various flexible alternating current transmission system(FACTS)devices into a powerful format.Using a 500 kV power grid,this study evaluates the selection and use of a UPFC to improve transmission capacity.The"UPFC unit capacity control proportionality coefficient"is introduced to quantify the control effect of the UPFC,and an optimal calculation method for the UPFC capacity is presented.Following the proposal of a UPFC site selection process,the data of an existing power grid is used to conduct simulations.The simulation results show that the UPFC has a strong ability to improve transmission capacity,and its use is greatly advantageous.Additionally,by applying the proposed selection method,the control effect and economic benefits of the UPFC can be comprehensively considered during project site selection.These findings have a guiding significance for UPFC site selection in ultra-high voltage power grids.
基金supported in part by the National Key R&D Program of China(2018YFB0905000)the Science and Technology Project of the State Grid Corporation of China(SGTJDK00DWJS1800232)
文摘The integrated energy system(IES)is an important energy supply method for mitigating the energy crisis.A station-and-network–coordinated planning method for the IES,which considers the integrated demand responses(IDRs)of flexible loads,electric vehicles,and energy storage is proposed in this work.First,based on load substitution at the user side,an energy-station model considering the IDR is established.Then,based on the characteristics of the energy network,a collaborative planning model is established for the energy station and energy network of the IES,considering the comprehensive system investment,operation and maintenance,and clean energy shortage penalty costs,to minimize the total cost.This can help optimize the locations of the power lines and natural gas pipelines and the capacities of the equipment in an energy station.Finally,simulations are performed to demonstrate that the proposed planning method can help delay or reduce the construction of new lines and energy-station equipment,thereby reducing the investment required and improving the planning economics of the IES.
基金co-supported by the National Natural Science Foundation of China(No.61304190)the Natural Science Foundation of Jiangsu Province(No.BK20130818)the Fundamental Research Funds for the Central Universities of China(No.NJ20150030)
文摘Air route network optimization,one of the essential parts of the airspace planning,is an effective way to optimize airspace resources,increase airspace capacity,and alleviate air traffic congestion.However,little has been done on the optimization of air route network in the fragmented airspace caused by prohibited,restricted,and dangerous areas(PRDs).In this paper,an air route network optimization model is developed with the total operational cost as the objective function while airspace restriction,air route network capacity,and non-straight-line factors(NSLF) are taken as major constraints.A square grid cellular space,Moore neighbors,a fixed boundary,together with a set of rules for solving the route network optimization model are designed based on cellular automata.The empirical traffic of airports with the largest traffic volume in each of the 9 flight information regions in China's Mainland is collected as the origin-destination(OD) airport pair demands.Based on traffic patterns,the model generates 35 air routes which successfully avoids 144 PRDs.Compared with the current air route network structure,the number of nodes decreases by 41.67%,while the total length of flight segments and air routes drop by 32.03% and 5.82% respectively.The NSLF decreases by 5.82% with changes in the total length of the air route network.More importantly,the total operational cost of the whole network decreases by 6.22%.The computational results show the potential benefits of the model and the advantage of the algorithm.Optimization of air route network can significantly reduce operational cost while ensuring operation safety.
基金This work was supported by the National Key Research and Development Program of China under Grant No.2017YFA0303700the Key Research and Development Program of Guangdong province under Grant No.2018B030325002+1 种基金the National Natural Science Foundation of China under Grant No.11974205Beijing Advanced Innovation Center for Future Chip(ICFC).
文摘Quantum secure direct communication provides a direct means of conveying secret information via quantum states among legitimate users.The past two decades have witnessed its great strides both theoretically and experimentally.However,the security analysis of it still stays in its infant.Some practical problems in this field to be solved urgently,such as detector efficiency mismatch,side-channel effect and source imperfection,are propelling the birth of a more impeccable solution.In this paper,we establish a new framework of the security analysis driven by numerics where all the practical problems may be taken into account naturally.We apply this framework to several variations of the DL04 protocol considering real-world experimental conditions.Also,we propose two optimizing methods to process the numerical part of the framework so as to meet different requirements in practice.With these properties considered,we predict the robust framework would open up a broad avenue of the development in the field.
基金supported by Shanghai Science and Technology Committee(13231204002)National Key Technology R&D Program of China(2015BAA01B02).
文摘A hybrid energy storage system(HESS)plays an important role in balancing the cost with the performance in terms of stabilizing the fluctuant power of wind farms and photovoltaic(PV)stations.To further bring down the cost and actually implement the dispatchability of wind/PV plants,there is a need to penetrate into the major factors that contribute to the cost of the any HESS.This paper first discusses hybrid energy storage systems,as well as chemical properties in different medium,deeming the ramp rate as one of the determinants that must be observed in the cost calculation.Then,a mathematical tool,Copula,is explained in details for the purpose of unscrambling the dependences between the power of wind and PV plants.To lower the cost,the basic rule for allocation of buffered power is also put forward,with the minimum energy capacities of the battery ESS(BESS)and the supercapacitor ESS(SC-ESS)simultaneously determined by integration.And the paper introduces the probability method to analyze how power and energy is compensated in certain confidence level.After that,two definitions of coefficients are set up,separately describing energy storage status and wind curtailment level.Finally,the paper gives a numerical example stemmed from real data acquired in wind farms and PV stations in Belgium.The conclusion presents that the cost of a hybrid energy storage system is greatly affected by ramp-rate and dependence between the power of wind farms and photovoltaic stations,in which dependence can easily be determined by Copulas.
基金supported by National Key Technology Support Program(No.2013BAA02B00)National Natural Science Foundation of China(No.50807041)+3 种基金Asia Pacific Economic Cooperation FundHubei province science and technology support program(No.2014BAA013)the Fundamental Research Funds for the Central Universities(No.2042014kf0233)the Fundamental Research Funds for the Central Universities(No.2014207020202)
文摘To achieve economical compensation for the huge-capacity negative sequence currents generated by high-speed railway load, an electromagnetic hybrid compensation system(EHCS) and control strategy is proposed.The EHCS is made up of a small-capacity railway static power conditioner(RPC) and a large-capacity magnetic static var compensator(MSVC). Compared with traditional compensation methods, the EHCS makes full use of the SVC’s advantages of economy and reliability and of RPC’s advantages of technical capability and flexibility. Based on the idea of injecting a negative sequence, the compensation principle of the EHCS is analyzed in detail. Then the minimum installation capacity of an EHCS is theoretically deduced. Furthermore, a constraint optimization compensation strategy that meets national standards, which reduces compensation capacity further, is proposed. An experimental platform based on a digital signal processor(DSP) and a programmable logic controller(PLC) is built to verify the analysis. Simulated and experimental results are given to demonstrate the effectiveness and feasibility of the proposed method.