期刊文献+
共找到9篇文章
< 1 >
每页显示 20 50 100
Establishment and evaluation of operation function model for cascade hydropower station 被引量:2
1
作者 Chang-ming JI Ting ZHOU Hai-tao HUANO 《Water Science and Engineering》 EI CAS 2010年第4期443-453,共11页
Toward solving the actual operation problems of cascade hydropower stations under hydrologic uncertainty, this paper presents the process of extraction of statistical characteristics from long-term optimal cascade ope... Toward solving the actual operation problems of cascade hydropower stations under hydrologic uncertainty, this paper presents the process of extraction of statistical characteristics from long-term optimal cascade operation, and proposes a monthly operation function algorithm for the actual operation of cascade hydropower stations through the identification, processing, and screening of available information during long-term optimal operation. Applying the operation function to the cascade hydropower stations on the Jinshajiang-Yangtze River system, the modeled long-term electric generation is shown to have high precision and provide benefits. Through comparison with optimal operation, the simulation results show that the operation function proposed retains the characteristics of optimal operation. Also, the inadequacies and attribution of the algorithm are discussed based on case study, providing decision support and reference information for research on large-scale cascade operation work. 展开更多
关键词 actual operation independent variable multiple stepwise regression attribution analysis cascade hydropower station
下载PDF
Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm 被引量:2
2
作者 Wei XIE Chang-ming JI +1 位作者 Zi-jun YANG Xiao-xing ZHANG 《Water Science and Engineering》 EI CAS 2012年第1期46-58,共13页
Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity... Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity of optimal scheduling processes were obtained by calculating the daily runoff process within three typical years, and a large number of simulated daily runoff processes were obtained using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA). After analyzing the optimal scheduling processes, the corresponding scheduling rules were determined, and the practical formulas were obtained. These rules can make full use of the rolling runoff forecast and carry out the rolling scheduling. Compared with the optimized results, the maximum relative difference of the annual power generation obtained by the scheduling rules is no more than 1%. The effectiveness and practical applicability of the scheduling rules are demonstrated by a case study. This study provides a new perspective for formulating the rules of power generation dispatching. 展开更多
关键词 scheduling rule short-time power generation dispatching hybrid algorithm cascade hydropower station
下载PDF
Decision-making model for risk management of cascade hydropower stations
3
作者 Pan, Bangchuan Chi, Hong +1 位作者 Xu, Jianguo Qi, Mingliang 《Journal of Southeast University(English Edition)》 EI CAS 2008年第S1期22-26,共5页
In a medium-term electricity market,in order to reduce the risks of price and inflow uncertainties, the cascade hydropower stations may use the options contract with electricity supply companies. A profit-based model ... In a medium-term electricity market,in order to reduce the risks of price and inflow uncertainties, the cascade hydropower stations may use the options contract with electricity supply companies. A profit-based model for risk management of cascade hydropower stations in the medium-term electricity market is presented. The objective function is profit maximization of cascade hydropower stations. In order to avoid the risks of price and inflow uncertainties, two different risk-aversion constraints: a minimum profit constraint and a minimum conditional value-at-risk, are introduced in the model. In addition, the model takes into account technology constraints of the generating units, which includes reservoir flow balance, reservoir capacity limits, water discharge constraints, etc. The model is formulated as a mixed integer nonlinear programming problem. Because the search space of the solution is very large, a genetic algorithm is used to deal with the problem. 展开更多
关键词 cascade hydropower station mixed integer nonlinear programming risk management medium-term electricity market
下载PDF
TianshengqiaoⅠcascade and Ⅱ cascade hydropower stations completely built up
4
《Electricity》 2001年第1期50-50,共1页
关键词 cascade hydropower stations completely built up Tianshengqiao cascade and
下载PDF
Practice of Centralized Control over Cascade Hydropower Stations
5
作者 Jin Zehua General Manager, Guizhou Wujiang Hydropower Development Ltd. 《Electricity》 2010年第1期44-47,共4页
Isolated operation of hydropower stations on Wujinag River was seen disadvantages of low rate of water utilization and much loss of electricity caused by abandoned water during low load periods. To tackle the problem,... Isolated operation of hydropower stations on Wujinag River was seen disadvantages of low rate of water utilization and much loss of electricity caused by abandoned water during low load periods. To tackle the problem, centralized control over cascade hydropower stations is practiced with a considerable economic benef it gained. 展开更多
关键词 RATE Practice of Centralized Control over cascade hydropower Stations OVER
下载PDF
Effects of Mountain Rivers Cascade Hydropower Stations on Water Ecosystems
6
作者 Mengtian Sun Kai Huang +2 位作者 Jinhua Shao Weixiong Wu Xinyue Liang 《Research in Ecology》 2022年第1期17-26,共10页
China is rich in hydropower resources,and mountain rivers have abundant water resources and huge development potential,which have a profound impact on the pattern of water resources allocation in China.As the main way... China is rich in hydropower resources,and mountain rivers have abundant water resources and huge development potential,which have a profound impact on the pattern of water resources allocation in China.As the main way of water resources and hydropower development,the construction of cascade hydropower stations,while meeting the requirements of water resources utilization for social development,has also brought adverse effects on river ecosystems.Therefore,the impact of the construction of cascade hydropower stations on mountainous river ecosystems,where the minimum ecological flow of rivers must be ensured and reviewed.In addition,this paper proposed the deficiencies and outlooks for cascade hydropower stations based on previous research results. 展开更多
关键词 Mountain rivers cascade hydropower stations Development and operations Ecological flow Water ecosystems Effects and countermeasures
下载PDF
Present Situation and Future Trends of River-Basin Cascade Hydropower Dispatch in China
7
作者 Cao Guangjing, Cai Zhiguo China Thnee Gorges Corporation 《Electricity》 2010年第1期18-23,33,共7页
Hydropower resources in river basins are typically developed in a cascade manner. The cascade hydropower stations use water from the same river; in a sense, they form a cluster of hydropower stations which are linked ... Hydropower resources in river basins are typically developed in a cascade manner. The cascade hydropower stations use water from the same river; in a sense, they form a cluster of hydropower stations which are linked together by the river stream. The dispatch and management of the cascade hydropower stations in a river basin differ from those of an ordinary single hydropower station. Without doubt, unified dispatch can facilitate the full harnessing of hydraulic resources and is in a better position to fulfill the objectives in the development of river basin. As a result, more and more river-basin cascade power stations around the world implement unif ied dispatching. 展开更多
关键词 Present Situation and Future Trends of River-Basin cascade hydropower Dispatch in China
下载PDF
The scheme optimization on construction diversion with discharge control feature of upstream operational reservoir
8
作者 Liu Quan Hu Zhigen +2 位作者 Fan Wuyi Ni Jinchu Li Qinjun 《Engineering Sciences》 EI 2012年第4期61-67,82,共8页
There is a discharge control feature of construction diversion system with the upstream operational reservoir. The risk evaluation model of construction diversion is established by taking into consideration the risk f... There is a discharge control feature of construction diversion system with the upstream operational reservoir. The risk evaluation model of construction diversion is established by taking into consideration the risk factors of construction diversion system with discharge control feature as well as their composition. And the risk factors include the upstream operational reservoir discharge control, the interval flood and branch flood and the diversion system itself. And then based on analyzing of the conversion relation between risk index and investment index of diversion scheme, the risk control and conversion principals of diversion system are put forward, and the feasible diversion scheme model is built. At last, the risk and economic evaluation and scheme economic feasibility analysis method of diversion scheme are shown by an example of construction diversion scheme optimization with the discharge control condition of upstream hydropower station. The study is valuable for establishment and optimization of construction diversion scheme with upstream reservoir discharge control. 展开更多
关键词 construction diversion cascade hydropower development risk analysis scheme optimization
下载PDF
Evaluation of optimization operation models for cascaded hydropower reservoirs to utilize medium range forecasting inflow 被引量:11
9
作者 XU Wei PENG Yong WANG BenDe 《Science China(Technological Sciences)》 SCIE EI CAS 2013年第10期2540-2552,共13页
This paper evaluates the performances of the models that incorporate forecasting inflow for cascaded hydropower reservoirs operation. These models are constructed separately on the concepts of explicit stochastic opti... This paper evaluates the performances of the models that incorporate forecasting inflow for cascaded hydropower reservoirs operation. These models are constructed separately on the concepts of explicit stochastic optimization (ESO) and implicit sto- chastic optimization (ISO) as well as parametefization-simulation-optimization (PSO). Firstly, the aggregation-disaggregation method is implemented in ESO models to reduce the complexity of stochastic dynamic programming (SDP). And the aggre- gate flow SDP (AF-SDP) and aggregation-disaggregation SDP (AD-SDP) are constructed respectively. Secondly, in ISO mod- el, decision tree is the well-known and widespread algorithm. The algorithm C 5.0 is selected to extract the if-then-else rules for reservoir operation. Thirdly, based on the PSO model, the hedging rule curves (HRCs) are pre-defined by fusing the storage and inflow as state variable. The parameters of the HRCs are determined by using the simulation-optimization model. Finally, China's Hun River cascade hydropower reservoirs system is taken as an example to illustrate the efficiency and reliability of the models. In addition, the values of quantitative precipitation forecasts of the global forecast system (10 days lead-time) are implemented to forecast the 10 days inflow. 展开更多
关键词 cascaded hydropower reservoirs forecasting inflow stochastic dynamic programming decision tree hedging rule
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部