The paper gives an insight into the behaviour of large underground caverns which are subjected to blast loads. Caverns are generally constructed in hard rock formation which compels us to use blasting methods for the ...The paper gives an insight into the behaviour of large underground caverns which are subjected to blast loads. Caverns are generally constructed in hard rock formation which compels us to use blasting methods for the excavation works. Comparative study was done between models with intact rock mass and discontinuities to assess the stability of cavern as a result of blast loads. Numerical modelling was performed with 3 dimensional distinct element code(3 DEC) to analyse the performance of cavern walls in terms of displacement and to compute peak particle velocities(PPV) both around the cavern periphery and at surface of models. Results showed that the velocity wave with higher frequency exhibited large displacements around the periphery of cavern. Computation of PPV showed that model with horizontal joint sets showed lower PPV in comparison to model with intact rock mass. PPV values were also analysed on the surface for model consisting vertical joints spaced at 4 m intervals. Comparative study of PPV on surface vertically above the blast location between models with horizontal joints spaced at 4 m and vertical joints at 4 m intervals were conducted. Results depicted higher magnitudes of PPV for model with vertical joints in comparison to model with horizontal joints.展开更多
【目的】明晰地下储气库的热力学过程是压缩空气储能(compressed air energy storage,CAES)电站安全设计与运行调度的重要基础。【方法】现有地下储气库热力学模型在计算热量交换时,存在高压储气阶段热损失偏大和低压储气库阶段补热过...【目的】明晰地下储气库的热力学过程是压缩空气储能(compressed air energy storage,CAES)电站安全设计与运行调度的重要基础。【方法】现有地下储气库热力学模型在计算热量交换时,存在高压储气阶段热损失偏大和低压储气库阶段补热过多的不足。本文在全面分析地下储气库热力学模型理论基础合理性的前提下,先分析储气库热量计算偏差的形成根源;再提出改进模型。【结果】研究结果表明:现有的热力学计算解析模型忽略了CAES地下储气库在运行过程中温度分布的不均匀性,这种温度分布的不均匀导致储气室洞壁与压缩空气之间的对流换热模型失真,导致温度计算结果偏差大。考虑混合对流换热的改进模型二可以较好地解决储气阶段温度计算结果与真实结果之间偏差过大的问题。算例分析证明了改进模型二的合理性。【结论】本文的改进模型二可为CAES地下储气库容积优化设计与效率分析提供计算依据。展开更多
An artificial water curtain system is composed of a network of underground galleries and horizontal boreholes drilled from these galleries.Pre-grouting measures are introduced to keep the bedrock saturated all the tim...An artificial water curtain system is composed of a network of underground galleries and horizontal boreholes drilled from these galleries.Pre-grouting measures are introduced to keep the bedrock saturated all the time.This system is deployed over an artificial or natural underground cavern used for the storage of gas(or some other fluids) to prevent the gas from escaping through leakage paths in the rock mass.An experimental physical modeling system has been constructed to evaluate the performance of artificial water curtain systems under various conditions.These conditions include different spacings of caverns and cavern radii located below the natural groundwater level.The principles of the experiment,devices,design of the physical model,calculation of gas leakage,and evaluation of the critical gas pressure are presented in this paper.Experimental result shows that gas leakage is strongly affected by the spacing of water curtain boreholes,the critical gas pressure,and the number and proximity of storage caverns.The hydraulic connection between boreholes is observed to vary with depth or location,which suggests that the distribution of water-conducting joint sets along the boreholes is also variable.When designing the drainage system for a cavern,drainage holes should be orientated to maximize the frequency at which they encounter major joint sets and permeable intervals studying in order to maintain the seal on the cavern through water pressure.Our experimental results provide a significant contribution to the theoretical controls on water curtains,and they can be used to guide the design and construction of practical storage caverns.展开更多
Three-dimensional(3 D) numerical simulation of Shiobara hydropower cavern was attempted with the developed practical equivalent approach. This simple equivalent approach integrates the effect of joints and correspondi...Three-dimensional(3 D) numerical simulation of Shiobara hydropower cavern was attempted with the developed practical equivalent approach. This simple equivalent approach integrates the effect of joints and corresponding nonlinearity in the rock and predicts its deformation behaviour. The model requires minimum inputs from field or laboratory tests and is efficient to capture the nonlinear stress-strain responses associated with the jointed rock mass. In this study, the applicability of the model was demonstrated with the 3 D analysis of Shiobara hydropower cavern. The numerical results were also compared with those of six other computational models to analyse the same cavern. The 3 D modelling of powerhouse cavern shows that the present approach, though simple, can be applied to large-scale field problems. The model can precisely predict the deformation values well, and this study confirmed the effectiveness of the approach for simulation of underground structures in jointed rocks.展开更多
文摘The paper gives an insight into the behaviour of large underground caverns which are subjected to blast loads. Caverns are generally constructed in hard rock formation which compels us to use blasting methods for the excavation works. Comparative study was done between models with intact rock mass and discontinuities to assess the stability of cavern as a result of blast loads. Numerical modelling was performed with 3 dimensional distinct element code(3 DEC) to analyse the performance of cavern walls in terms of displacement and to compute peak particle velocities(PPV) both around the cavern periphery and at surface of models. Results showed that the velocity wave with higher frequency exhibited large displacements around the periphery of cavern. Computation of PPV showed that model with horizontal joint sets showed lower PPV in comparison to model with intact rock mass. PPV values were also analysed on the surface for model consisting vertical joints spaced at 4 m intervals. Comparative study of PPV on surface vertically above the blast location between models with horizontal joints spaced at 4 m and vertical joints at 4 m intervals were conducted. Results depicted higher magnitudes of PPV for model with vertical joints in comparison to model with horizontal joints.
文摘【目的】明晰地下储气库的热力学过程是压缩空气储能(compressed air energy storage,CAES)电站安全设计与运行调度的重要基础。【方法】现有地下储气库热力学模型在计算热量交换时,存在高压储气阶段热损失偏大和低压储气库阶段补热过多的不足。本文在全面分析地下储气库热力学模型理论基础合理性的前提下,先分析储气库热量计算偏差的形成根源;再提出改进模型。【结果】研究结果表明:现有的热力学计算解析模型忽略了CAES地下储气库在运行过程中温度分布的不均匀性,这种温度分布的不均匀导致储气室洞壁与压缩空气之间的对流换热模型失真,导致温度计算结果偏差大。考虑混合对流换热的改进模型二可以较好地解决储气阶段温度计算结果与真实结果之间偏差过大的问题。算例分析证明了改进模型二的合理性。【结论】本文的改进模型二可为CAES地下储气库容积优化设计与效率分析提供计算依据。
基金Supported by the National Natural Science Foundation of China (50779025,50539090)the Open Research Foundation of State Key Laboratory of Hydroscience and Engineering of Tsinghua University (200805331143)
文摘An artificial water curtain system is composed of a network of underground galleries and horizontal boreholes drilled from these galleries.Pre-grouting measures are introduced to keep the bedrock saturated all the time.This system is deployed over an artificial or natural underground cavern used for the storage of gas(or some other fluids) to prevent the gas from escaping through leakage paths in the rock mass.An experimental physical modeling system has been constructed to evaluate the performance of artificial water curtain systems under various conditions.These conditions include different spacings of caverns and cavern radii located below the natural groundwater level.The principles of the experiment,devices,design of the physical model,calculation of gas leakage,and evaluation of the critical gas pressure are presented in this paper.Experimental result shows that gas leakage is strongly affected by the spacing of water curtain boreholes,the critical gas pressure,and the number and proximity of storage caverns.The hydraulic connection between boreholes is observed to vary with depth or location,which suggests that the distribution of water-conducting joint sets along the boreholes is also variable.When designing the drainage system for a cavern,drainage holes should be orientated to maximize the frequency at which they encounter major joint sets and permeable intervals studying in order to maintain the seal on the cavern through water pressure.Our experimental results provide a significant contribution to the theoretical controls on water curtains,and they can be used to guide the design and construction of practical storage caverns.
文摘Three-dimensional(3 D) numerical simulation of Shiobara hydropower cavern was attempted with the developed practical equivalent approach. This simple equivalent approach integrates the effect of joints and corresponding nonlinearity in the rock and predicts its deformation behaviour. The model requires minimum inputs from field or laboratory tests and is efficient to capture the nonlinear stress-strain responses associated with the jointed rock mass. In this study, the applicability of the model was demonstrated with the 3 D analysis of Shiobara hydropower cavern. The numerical results were also compared with those of six other computational models to analyse the same cavern. The 3 D modelling of powerhouse cavern shows that the present approach, though simple, can be applied to large-scale field problems. The model can precisely predict the deformation values well, and this study confirmed the effectiveness of the approach for simulation of underground structures in jointed rocks.