Abstract On the basis of analyzing floor strata mechanical circumstance of the roadway, the mechanical model was established. The relative displacement of roadway floor, narrow pillar floor coal mass and floor strata ...Abstract On the basis of analyzing floor strata mechanical circumstance of the roadway, the mechanical model was established. The relative displacement of roadway floor, narrow pillar floor coal mass and floor strata was calculated, the results showed that the high abutment pressure on coal mass beside the roadway was the main reason to lead to relative displacement of floor strata. And the roadway floor heave come mainly from three aspects. Firstly, the roadway floor strata is easily fractured by the stretch stress. Secondly, because the high abutment pressure is greater than the uniaxial compressive strength of floor strata, when the roadway floor strata are fractured, the coal mass floor strata at the same depth will be fractured, and broken rock will fluid into the open roadway. Thirdly, comparing with the coal mass floor, the roadway floor is relative ascending.展开更多
Combined with a digital bored photography system and in-situ statistics concerning the joints and fissures of both ore-body and surrounding rock,a 2D discrete model was constructed using UDEC.The stress field and disp...Combined with a digital bored photography system and in-situ statistics concerning the joints and fissures of both ore-body and surrounding rock,a 2D discrete model was constructed using UDEC.The stress field and displacement field changes of different sublevel stoping systems were also studied.Changes in the overlying rock strata settlement pattern has been analyzed and validated by in-situ monitoring data.The results show that:in the caving process,there exists an obvious delay and jump for the overlying rock strata displacement over time,and a stable arch can be formed in the process of caving,which leads to hidden goafs.Disturbed by the mining activity,a stress increase occurred in both the hanging wall and the foot wall,demonstrating a hump-shaped distribution pattern.From the comparison between simulation results and in-situ monitoring results,land subsidence shows a slow-development,suddenfailure,slow-development cycle pattern,which leads eventually to a stable state.This pattern validates the existence of balanced arch and hidden goafs.展开更多
文摘Abstract On the basis of analyzing floor strata mechanical circumstance of the roadway, the mechanical model was established. The relative displacement of roadway floor, narrow pillar floor coal mass and floor strata was calculated, the results showed that the high abutment pressure on coal mass beside the roadway was the main reason to lead to relative displacement of floor strata. And the roadway floor heave come mainly from three aspects. Firstly, the roadway floor strata is easily fractured by the stretch stress. Secondly, because the high abutment pressure is greater than the uniaxial compressive strength of floor strata, when the roadway floor strata are fractured, the coal mass floor strata at the same depth will be fractured, and broken rock will fluid into the open roadway. Thirdly, comparing with the coal mass floor, the roadway floor is relative ascending.
基金financially supported by the National Natural Science Foundation of China(No.51374033)the Doctoral Program of Higher Education Research Fund(No.20120006110022)the Chenchao Iron Mine and the technical support of Itasca
文摘Combined with a digital bored photography system and in-situ statistics concerning the joints and fissures of both ore-body and surrounding rock,a 2D discrete model was constructed using UDEC.The stress field and displacement field changes of different sublevel stoping systems were also studied.Changes in the overlying rock strata settlement pattern has been analyzed and validated by in-situ monitoring data.The results show that:in the caving process,there exists an obvious delay and jump for the overlying rock strata displacement over time,and a stable arch can be formed in the process of caving,which leads to hidden goafs.Disturbed by the mining activity,a stress increase occurred in both the hanging wall and the foot wall,demonstrating a hump-shaped distribution pattern.From the comparison between simulation results and in-situ monitoring results,land subsidence shows a slow-development,suddenfailure,slow-development cycle pattern,which leads eventually to a stable state.This pattern validates the existence of balanced arch and hidden goafs.