The suitable cement concrete pavement for mountainous areas is a form of low-cost cement concrete pavement that uses unconventional graded stones in different proportions in ordinary concrete,allowing the concrete to ...The suitable cement concrete pavement for mountainous areas is a form of low-cost cement concrete pavement that uses unconventional graded stones in different proportions in ordinary concrete,allowing the concrete to fully contact the stones and form a stable and well-bonded slab with large particle stones.As large particle stones replace a certain volume of cement concrete,they have good economic performance and are a low-cost form of cement concrete pavement.This study researches the use of ANSYS tools to analyze the influence of geometric dimensions and material properties of rigid pavement structural layers on the mechanical properties of pavement structures.展开更多
To improve the prediction accuracy of the International Roughness Index(IRI)of Jointed PlainConcrete Pavements(JPCP)and Continuously Reinforced Concrete Pavements(CRCP),a machine learning approach is developed in this...To improve the prediction accuracy of the International Roughness Index(IRI)of Jointed PlainConcrete Pavements(JPCP)and Continuously Reinforced Concrete Pavements(CRCP),a machine learning approach is developed in this study for the modelling,combining an improved Beetle Antennae Search(MBAS)algorithm and Random Forest(RF)model.The 10-fold cross-validation was applied to verify the reliability and accuracy of the model proposed in this study.The importance scores of all input variables on the IRI of JPCP and CRCP were analysed as well.The results by the comparative analysis showed the prediction accuracy of the IRI of the newly developed MBAS and RF hybrid machine learning model(RF-MBAS)in this study is higher,indicated by the RMSE and R values of 0.2732 and 0.9476 for the JPCP as well as the RMSE and R values of 0.1863 and 0.9182 for the CRCP.The accuracy of this obtained result far exceeds that of the IRI prediction model used in the traditional Mechanistic-Empirical Pavement Design Guide(MEPDG),indicating the great potential of this developed model.The importance analysis showed that the IRI of JPCP and CRCP was proportional to the corresponding input variables in this study,including the total joint faulting cumulated per KM(TFAULT),percent subgrade material passing the 0.075-mm Sieve(P_(200))and pavement surface area with flexible and rigid patching(all Severities)(PATCH)which scored higher.展开更多
Premature stress of cement concrete pavements i the coupled action of construction technique,structural ma-terial and environmental action.It is quite diffiault to accurately get the actual stress distribution merely ...Premature stress of cement concrete pavements i the coupled action of construction technique,structural ma-terial and environmental action.It is quite diffiault to accurately get the actual stress distribution merely based on the theoretical or simulation analysis.Ther efore,in-situ health monitoring is particularly si gnificant to obtain the stress or strain information for the assessment on structural perfor mance of cement concrete pavements.To contribute this topic,different kinds of FBG based sensors have been specially designed to measure the tem-perature,pressure and deformation in cement concrete pavements.A relatively long-term monitoring has been aonducted to collect the effective data after the solidification of the pavement lasts for about 15 d.Data analysis indicates that the temperature variation inside the pavement was very stable,with maximum ampltude smaller than 2.25°C in Sep.2020.The longitudinal,transverse and ver tical deformations of the pavement behaved in non-umniform distribution,and partial me asuring points suffered from large tensile force.The concrete course had better deformation resi stance than that of the soil base,and local interfacial micro void defects existed in the soil base.The preliminary results can help to understand the actual structural performance of cement concrete pavements based on the optical fiber sensing sys tem.展开更多
The Portland cement concrete pavement(PCCP)often suffers from different environmental distresses and vehicle load failure,resulting in slab corner fractures,potholes,and other diseases.Rapid repair has become one of t...The Portland cement concrete pavement(PCCP)often suffers from different environmental distresses and vehicle load failure,resulting in slab corner fractures,potholes,and other diseases.Rapid repair has become one of the effective ways to open traffic rapidly.In this study,a novel type of rapid repair material,basalt fiber reinforced polymer modified magnesium phosphate cement(BFPMPC),is used to rapidly repair PCCP.Notably,the mechanical properties and characteristics of the repair interfaces which are named interfacial transition zones(ITZs)formed by BFPMPC and cement concrete are focused on as a decisive factor for the performance of the rapid repair.The changing trend of the elastic moduli was studied by nanoindentation experiments in the ITZs with the deconvolution analysis that the elastic moduli of certain kinds of substances can be determined.The experimental results show that the elastic modulus of ITZ-1 with a width of about20μm can be regarded as 0.098 times of the aggregate,and 0.51 times of the ordinary Portland cement(OPC)mortar.The BFPMPC-OPC mortar ITZ has roughly the same mechanical properties as the ITZ between aggregate and BFPMPC.A multi-scale representative two-dimensional model was established by random aggregate and a two-dimensional extended finite element method(XFEM)to study the mechanical properties of the repair interface.The simulation results show that the ITZ formed by the interface of BFPMPC and OPC mortar and basalt aggregate is the most vulnerable to failure,which is consistent with the nano-indentation experimental results.展开更多
文摘The suitable cement concrete pavement for mountainous areas is a form of low-cost cement concrete pavement that uses unconventional graded stones in different proportions in ordinary concrete,allowing the concrete to fully contact the stones and form a stable and well-bonded slab with large particle stones.As large particle stones replace a certain volume of cement concrete,they have good economic performance and are a low-cost form of cement concrete pavement.This study researches the use of ANSYS tools to analyze the influence of geometric dimensions and material properties of rigid pavement structural layers on the mechanical properties of pavement structures.
基金supported by the Fundamental Research Funds for the Central Universities(Grant No.2021QN1006)Natural Science Foundation of Hunan(Grant No.2023JJ50418)Hunan Provincial Transportation Technology Project(Grant No.202109).
文摘To improve the prediction accuracy of the International Roughness Index(IRI)of Jointed PlainConcrete Pavements(JPCP)and Continuously Reinforced Concrete Pavements(CRCP),a machine learning approach is developed in this study for the modelling,combining an improved Beetle Antennae Search(MBAS)algorithm and Random Forest(RF)model.The 10-fold cross-validation was applied to verify the reliability and accuracy of the model proposed in this study.The importance scores of all input variables on the IRI of JPCP and CRCP were analysed as well.The results by the comparative analysis showed the prediction accuracy of the IRI of the newly developed MBAS and RF hybrid machine learning model(RF-MBAS)in this study is higher,indicated by the RMSE and R values of 0.2732 and 0.9476 for the JPCP as well as the RMSE and R values of 0.1863 and 0.9182 for the CRCP.The accuracy of this obtained result far exceeds that of the IRI prediction model used in the traditional Mechanistic-Empirical Pavement Design Guide(MEPDG),indicating the great potential of this developed model.The importance analysis showed that the IRI of JPCP and CRCP was proportional to the corresponding input variables in this study,including the total joint faulting cumulated per KM(TFAULT),percent subgrade material passing the 0.075-mm Sieve(P_(200))and pavement surface area with flexible and rigid patching(all Severities)(PATCH)which scored higher.
基金supported by the National Natural Science Foundation of China(Grant No.51908263,11932008,DL2021175003L and G2021175026L)Provincial Projects(2020-0624-RCC-0013 and JK2021-18)。
文摘Premature stress of cement concrete pavements i the coupled action of construction technique,structural ma-terial and environmental action.It is quite diffiault to accurately get the actual stress distribution merely based on the theoretical or simulation analysis.Ther efore,in-situ health monitoring is particularly si gnificant to obtain the stress or strain information for the assessment on structural perfor mance of cement concrete pavements.To contribute this topic,different kinds of FBG based sensors have been specially designed to measure the tem-perature,pressure and deformation in cement concrete pavements.A relatively long-term monitoring has been aonducted to collect the effective data after the solidification of the pavement lasts for about 15 d.Data analysis indicates that the temperature variation inside the pavement was very stable,with maximum ampltude smaller than 2.25°C in Sep.2020.The longitudinal,transverse and ver tical deformations of the pavement behaved in non-umniform distribution,and partial me asuring points suffered from large tensile force.The concrete course had better deformation resi stance than that of the soil base,and local interfacial micro void defects existed in the soil base.The preliminary results can help to understand the actual structural performance of cement concrete pavements based on the optical fiber sensing sys tem.
基金financially supported by the Fundamental Research Funds for the Central Universities(DUT20JC50,DUT17RC(3)006)the National Natural Science Foundation of China(51508137)the Research Center of Civil Aviation Airport Safety and Operation Engineering Technology(KFKT2021-01)。
文摘The Portland cement concrete pavement(PCCP)often suffers from different environmental distresses and vehicle load failure,resulting in slab corner fractures,potholes,and other diseases.Rapid repair has become one of the effective ways to open traffic rapidly.In this study,a novel type of rapid repair material,basalt fiber reinforced polymer modified magnesium phosphate cement(BFPMPC),is used to rapidly repair PCCP.Notably,the mechanical properties and characteristics of the repair interfaces which are named interfacial transition zones(ITZs)formed by BFPMPC and cement concrete are focused on as a decisive factor for the performance of the rapid repair.The changing trend of the elastic moduli was studied by nanoindentation experiments in the ITZs with the deconvolution analysis that the elastic moduli of certain kinds of substances can be determined.The experimental results show that the elastic modulus of ITZ-1 with a width of about20μm can be regarded as 0.098 times of the aggregate,and 0.51 times of the ordinary Portland cement(OPC)mortar.The BFPMPC-OPC mortar ITZ has roughly the same mechanical properties as the ITZ between aggregate and BFPMPC.A multi-scale representative two-dimensional model was established by random aggregate and a two-dimensional extended finite element method(XFEM)to study the mechanical properties of the repair interface.The simulation results show that the ITZ formed by the interface of BFPMPC and OPC mortar and basalt aggregate is the most vulnerable to failure,which is consistent with the nano-indentation experimental results.