Organic rich dark shale of Q Formation can be found in many areas(e.g.,in the North of S Basin).The shale target stratum is easy to hydrate and often undergoes spallation.Therefore,centering the casing in the horizont...Organic rich dark shale of Q Formation can be found in many areas(e.g.,in the North of S Basin).The shale target stratum is easy to hydrate and often undergoes spallation.Therefore,centering the casing in the horizontal section of the irregular borehole is relatively difficult.Similarly,achieving a good cementflushing efficiency under complex borehole conditions is a complex task.Through technologies such as centralizer,efficient preflushing,multi-stageflushing and ductile cement slurry,better performances can be achieved.In this study,it is shown that the cementing rate in the DY2H horizontal section is 97.8%,which is more than 34%higher than that of adjacent wells.This cementing matching technology for sidetracking horizontal wells can be used to improve the cementing quality of continental shale and provides a reference for future applications in thisfield.展开更多
For the engineering geology conditions of bad mine roadway roof and floor lithology in extremely weak cemented strata, the best section shape of the roadway is determined from the study of tunnel surrounding rock disp...For the engineering geology conditions of bad mine roadway roof and floor lithology in extremely weak cemented strata, the best section shape of the roadway is determined from the study of tunnel surrounding rock displacement, plastic zone and stress distribution in rectangular, circle arch and arch wall sections, respectively. Based on the mining depth and thickness of the coal seam, roadway support technology solutions with different buried depth and thickness of coal seam are proposed. Support schemes are amended and optimized in time through monitoring data of the deformation of roadway, roof separation, l-beam bracket, bolt and anchor cable force to ensure the long-term stability and security of the roadway surrounding rock and support structure. The monitoring results show that mine roadway support schemes for different buried depth and section can be adapted to the characteristics of ground pressure and deformation of the surrounding rock in different depth well, effectively control the roadway surrounding rock deformation and the floor heave and guarantee the safety of construction and basic stability of surrounding rock and support structure.展开更多
Through the comparison of calcination conditions between cement preclinkering technology and cement precalcining technology,we studied the characteristics of temperature field distribution of cement preclinkering tech...Through the comparison of calcination conditions between cement preclinkering technology and cement precalcining technology,we studied the characteristics of temperature field distribution of cement preclinkering technology systems including cyclone preheater,preclinkering furnace,and rotary kiln.We used numericalsimulation method to obtain data of temperature field distribution.Some results are found by system study.The ratio of tailcoalof cement preclinkering technology is about 70%,and raw mealtemperature can reach 1070 ℃.Shorter L/D kiln type of preclinkering technology can obtain more stable calcining zone temperature.The highest solid temperature of cement preclinkering technology is higher than 80 ℃,and high temperature region(〉1450 ℃)length is 2 times,which is beneficialfor calcining clinker and higher clinker quality.So cement preclinkering technology can obtain more performance temperature filed,which improves both the solid-phase reaction and liquid-phase reaction.展开更多
The simplified mechanical model and finite element model are established on the basis of the measured results and analysis of the grouting pile deformation monitoring,surface horizontal displacement and vertical displ...The simplified mechanical model and finite element model are established on the basis of the measured results and analysis of the grouting pile deformation monitoring,surface horizontal displacement and vertical displacement monitoring,deep horizontal displacement(inclinometer)monitoring,soil pressure monitoring and seepage pressure monitoring in the lower reaches of Wuan River regulation project in Shishi,Fujian Province.The mechanical behavior and deformation performance of mould-bag pile retaining wall formed after controlled cement grouting in the silty stratum of the test section are analyzed and compared.The results show that the use of controlled cement grouting mould-bag pile technology is to strengthen the soft stratum for sealing water and reinforcement,so that it can rock into a retaining wall,which can both retain soil and seal water with excellent effect.The control of cement grouting technology not only makes the soft soil rock in the range of retaining wall of mould-bag pile,but also makes a wide range of soil around the mould-bag pile squeeze and embed to compaction;and its cohesion and internal friction angle increased,so as to achieve the purpose of reducing soil pressure and improving mechanical and deformation properties of retaining wall.展开更多
基金funded by the CNPC Science and Technology Department Project(2021ZZ10-03)。
文摘Organic rich dark shale of Q Formation can be found in many areas(e.g.,in the North of S Basin).The shale target stratum is easy to hydrate and often undergoes spallation.Therefore,centering the casing in the horizontal section of the irregular borehole is relatively difficult.Similarly,achieving a good cementflushing efficiency under complex borehole conditions is a complex task.Through technologies such as centralizer,efficient preflushing,multi-stageflushing and ductile cement slurry,better performances can be achieved.In this study,it is shown that the cementing rate in the DY2H horizontal section is 97.8%,which is more than 34%higher than that of adjacent wells.This cementing matching technology for sidetracking horizontal wells can be used to improve the cementing quality of continental shale and provides a reference for future applications in thisfield.
基金Financial support for this work, provided by the Major Program of the National Natural Science Foundation of China (Nos. 51174196 and 51204168)the Program for New Century Excellent Talents in University by Ministry of Education of China (No. NCET-07-0519)
文摘For the engineering geology conditions of bad mine roadway roof and floor lithology in extremely weak cemented strata, the best section shape of the roadway is determined from the study of tunnel surrounding rock displacement, plastic zone and stress distribution in rectangular, circle arch and arch wall sections, respectively. Based on the mining depth and thickness of the coal seam, roadway support technology solutions with different buried depth and thickness of coal seam are proposed. Support schemes are amended and optimized in time through monitoring data of the deformation of roadway, roof separation, l-beam bracket, bolt and anchor cable force to ensure the long-term stability and security of the roadway surrounding rock and support structure. The monitoring results show that mine roadway support schemes for different buried depth and section can be adapted to the characteristics of ground pressure and deformation of the surrounding rock in different depth well, effectively control the roadway surrounding rock deformation and the floor heave and guarantee the safety of construction and basic stability of surrounding rock and support structure.
基金Funded by the Major State Basic Research Perelopment Program of China(973 Program)(No.2009CB623102)the Key Fund Project of Sichuan Provincial Department of Education(No.14ZA0086)the Key Fund Project of Professional Scientific Research Innovation Team of Southwest University of Science and Technology(No.14tdfk01)
文摘Through the comparison of calcination conditions between cement preclinkering technology and cement precalcining technology,we studied the characteristics of temperature field distribution of cement preclinkering technology systems including cyclone preheater,preclinkering furnace,and rotary kiln.We used numericalsimulation method to obtain data of temperature field distribution.Some results are found by system study.The ratio of tailcoalof cement preclinkering technology is about 70%,and raw mealtemperature can reach 1070 ℃.Shorter L/D kiln type of preclinkering technology can obtain more stable calcining zone temperature.The highest solid temperature of cement preclinkering technology is higher than 80 ℃,and high temperature region(〉1450 ℃)length is 2 times,which is beneficialfor calcining clinker and higher clinker quality.So cement preclinkering technology can obtain more performance temperature filed,which improves both the solid-phase reaction and liquid-phase reaction.
基金The work is supported by the National Natural Science Foundation of China(No.51578253)Scientific and Technological Planning Project of Xiamen City(Nos.3502Z20172011 and 3502Z20172014)+1 种基金Scientific and Technological Planning Project of Quanzhou City(No.2018C083R)Reform study of graduate education and teaching of Huaqiao University in 2018(No.18YJG55).
文摘The simplified mechanical model and finite element model are established on the basis of the measured results and analysis of the grouting pile deformation monitoring,surface horizontal displacement and vertical displacement monitoring,deep horizontal displacement(inclinometer)monitoring,soil pressure monitoring and seepage pressure monitoring in the lower reaches of Wuan River regulation project in Shishi,Fujian Province.The mechanical behavior and deformation performance of mould-bag pile retaining wall formed after controlled cement grouting in the silty stratum of the test section are analyzed and compared.The results show that the use of controlled cement grouting mould-bag pile technology is to strengthen the soft stratum for sealing water and reinforcement,so that it can rock into a retaining wall,which can both retain soil and seal water with excellent effect.The control of cement grouting technology not only makes the soft soil rock in the range of retaining wall of mould-bag pile,but also makes a wide range of soil around the mould-bag pile squeeze and embed to compaction;and its cohesion and internal friction angle increased,so as to achieve the purpose of reducing soil pressure and improving mechanical and deformation properties of retaining wall.