Contracts for importing 1st phase project equipment of Yangcheng Power Plant signed Building power plant at coal pit-head, sending power to load center province
1
《Electricity》 1996年第4期49-49,共1页
The contracts worth $ 720 million for importing 1st phase project equipment of Yangcheng Coal-fired Power Plant were signed on August 22, 1996 in Beijing between the China Electric Power Technology Import & Export... The contracts worth $ 720 million for importing 1st phase project equipment of Yangcheng Coal-fired Power Plant were signed on August 22, 1996 in Beijing between the China Electric Power Technology Import & Export Corp., Shanxi’s Yangcheng International Power Generating Co. Ltd, Shanxi Provincial Power Corp., Germany’s Siemens and the US firm Foster Wheeler Energy Corp. 展开更多
关键词 sending power to load center province HEAD LOAD
下载PDF
Design of Power Supply Network Based on 500/110 kV for Load Center and Comprehensive Accessibility Evaluation
2
作者 Yixin Zhuo Jingyou Xu +3 位作者 Fanrong Wei Lvyang Xu Xiangning Lin Zhengtian Li 《CSEE Journal of Power and Energy Systems》 SCIE 2016年第1期30-39,共10页
Growing electric power demand and the consumption of large-scale renewable energy require a more efficient power supply network,with less occupied areas in load centers.In this paper,application principles of power su... Growing electric power demand and the consumption of large-scale renewable energy require a more efficient power supply network,with less occupied areas in load centers.In this paper,application principles of power supply network based on 500/110 kV direct transformation are proposed.An in-depth analysis of the grid structure and substation design is presented along with an application scenario.An accessibility index based on power flow tracing for network evaluation is also proposed.The index is able to present the inner connectivity and power transferability of a power network.A comprehensive evaluation of traditional short circuit,load flow,N-1,economic calculation,and the accessibility index are conducted on the power grid planning of a high-tech industrial park in Wuhan,China.Finally,electric feasibility and reliability are validated,and accessibility and construction investments compared. 展开更多
关键词 500/110 kV direct transformation ACCESSIBILITY economic analysis load center voltage level simplification