Isolated operation of hydropower stations on Wujinag River was seen disadvantages of low rate of water utilization and much loss of electricity caused by abandoned water during low load periods. To tackle the problem,...Isolated operation of hydropower stations on Wujinag River was seen disadvantages of low rate of water utilization and much loss of electricity caused by abandoned water during low load periods. To tackle the problem, centralized control over cascade hydropower stations is practiced with a considerable economic benef it gained.展开更多
This study presents a centralized control scheme that coordinates parallel operations of power conditioning system(PCS)for the grid interactions of electric vehicles(EVs)in EV charge-discharge and storage integration ...This study presents a centralized control scheme that coordinates parallel operations of power conditioning system(PCS)for the grid interactions of electric vehicles(EVs)in EV charge-discharge and storage integration station.Key issues for the control and operation of PCS under various operation modes are discussed,including vehicle to grid(V2G)mode,stand-alone mode and seamless transfer mode.The intelligent multi-mode charge-discharge method is utilized for the V2G mode,and the parallel control method based on communication network is adopted for the standalone mode.In addition,a novel seamless transfer strategy is proposed,which is able to implement PCS transition between V2G mode and stand-alone mode.The detailed process of the seamless transfer between the two modes is illustrated.Experimental results are presented to show the performance and feasibility of this strategy.展开更多
With the explosive increasing number of connecting devices such as smart phones, vehicles,drones, and satellites in the wireless networks, how to manage and control such a huge number of networking nodes has become a ...With the explosive increasing number of connecting devices such as smart phones, vehicles,drones, and satellites in the wireless networks, how to manage and control such a huge number of networking nodes has become a great challenge. In this paper, we combine the advantages of centralized networks and distributed networks approaches for vehicular networks with the aid of Unmanned Aerial Vehicle(UAV), and propose a Center-controlled Multihop Wireless(CMW) networking scheme consisting of data transmission plane performed by vehicles and the network control plane implemented by the UAV.Besides, we jointly explore the advantages of Medium Access Control(MAC) protocols in the link layer and routing schemes in the network layer to facilitate the multi-hop data transmission for the ground vehicles.Particularly, the network control plane in the UAV can manage the whole network effectively via fully exploiting the acquired network topology information and traffic requests from each vehicle, and implements various kinds of control based on different traffic demands, which can enhance the networking flexibility and scalability significantly in vehicular networks.Simulation results validate the advantages of the proposed scheme compared with existing methods.展开更多
We study afresh how the glucose control system anomalies impact the organicity of the glucose homeostasis and build up events of persistent hyperglycemia and diabetes mellitus. We have used critically the state of art...We study afresh how the glucose control system anomalies impact the organicity of the glucose homeostasis and build up events of persistent hyperglycemia and diabetes mellitus. We have used critically the state of art literature related to the subject, in order to cross, to compare, and to organize the relevant contents to create a logical and consistent support to the finds. We show that it is consistent to assume that persistent hyperglycemia and diabetes mellitus can have precursors not only in pancreas, but also in brain, mainly induced by noxious dysfunctions of hypothalamus sensor neurons circuits and external noxious elements, causing pancreas overload, and the consequent exhaustion—overburden.展开更多
Coordinated taxiing planning for multiple aircraft on flight deck is of vital importance which can dramatically improve the dispatching efficiency.In this paper,first,the coordinated taxiing path planning problem is t...Coordinated taxiing planning for multiple aircraft on flight deck is of vital importance which can dramatically improve the dispatching efficiency.In this paper,first,the coordinated taxiing path planning problem is transformed into a centralized optimal control problem where collision-free conditions and mechanical limits are considered.Since the formulated optimal control problem is of large state space and highly nonlinear,an efficient hierarchical initialization technique based on the Dubins-curve method is proposed.Then,a model predictive controller is designed to track the obtained reference trajectory in the presence of initial state error and external disturbances.Numerical experiments demonstrate that the proposed“offline planningþonline tracking”framework can achieve efficient and robust coordinated taxiing planning and tracking even in the presence of initial state error and continuous external disturbances.展开更多
Mr.Jiang Zcmin,Gencral-Seerctary of the Cen-tral Committee of the Chincse Communist Party and.Chairman of the People's Republic of China,in a rC-ccnt spcech cm phasized that the family planning pro-gramme should b...Mr.Jiang Zcmin,Gencral-Seerctary of the Cen-tral Committee of the Chincse Communist Party and.Chairman of the People's Republic of China,in a rC-ccnt spcech cm phasized that the family planning pro-gramme should be strictly and effectively im plemented in 1994,a year of crucial importance for promoting re-form and opening and thc drive lowards.modernization.To makc continucd contributions to the sociocconomic development in the country,we must fulfil the plan for controlling population growth..The spcech was delivcred at the anua!National Fo-rum on Family Planning Work convened jointly by the Party's Central Committcc and the Statc Council.展开更多
Purpose–The intelligent Central Traffic Control(CTC)system plays a vital role in establishing an intelligent high-speed railway(HSR)system.As the core of HSR transportation command,the intelligent CTC system is a new...Purpose–The intelligent Central Traffic Control(CTC)system plays a vital role in establishing an intelligent high-speed railway(HSR)system.As the core of HSR transportation command,the intelligent CTC system is a new HSR dispatching command system that integrates the widely used CTC in China with the practical service requirements of intelligent dispatching.This paper aims to propose key technologies and applications for intelligent dispatching command in HSR in China.Design/methodology/approach–This paper first briefly introduces the functions and configuration of the intelligent CTC system.Some new servers,terminals and interfaces are introduced,which are plan adjustment server/terminal,interface for automatic train operation(ATO),interface for Dynamic Monitoring System of Train Control Equipment(DMS),interface for Power Supervisory Control and Data Acquisition(PSCADA),interface for Disaster Monitoring,etc.Findings–The key technologies applied in the intelligent CTC system include automatic adjustment of train operation plans,safety control of train routes and commands,traffic information data platform,integrated simulation of traffic dispatching and ATO function.These technologies have been applied in the Beijing-Zhangjiakou HSR,which commenced operations at the end of 2019.Implementing these key intelligent functions has improved the train dispatching command capacity,ensured the safe operation of intelligent HSR,reduced the labor intensity of dispatching operators and enhanced the intelligence level of China’s dispatching system.Originality/value–This paper provides further challenges and research directions for the intelligent dispatching command of HSR.To achieve the objectives,new measures need to be conducted,including the development of advanced technologies for intelligent dispatching command,coping with new requirements with the development of China’s railway signaling system,the integration of traffic dispatching and train control and the application of AI and data-driven modeling and methods.展开更多
A microgrid(MG)refers to a set of loads,generation resources and energy storage systems acting as a controllable load or a generator to supply power and heating to a local area.The MG-generated power management is a c...A microgrid(MG)refers to a set of loads,generation resources and energy storage systems acting as a controllable load or a generator to supply power and heating to a local area.The MG-generated power management is a central topic for MG design and operation.The existence of dispersed generation(DG)resources has faced MG management with new issues.Depending on the level of exchanges between an MG and the main grid,the MG operation states can be divided into independent or grid-connected ones.Energy management in MGs aims to supply power at the lowest cost for optimal load response.This study examines MG energy management in two operational modes of islanded and grid-connected,and proposes a structure with two control layers(primary and secondary)for energy management.At the principal level of control,the energy management system is determined individually for all MG by taking into consideration the probability constraints and RES uncertainty by the Weibull the probability density function(PDF),generation resources’power as well as the generation surplus and deficit of each MG.Then,the information of the power surplus and deficit of each MG must be sent to the central energy management system.To confirm the proposed structure,a case system with two MGs and a condensive load is simulated by using a multi-time harmony search algorithm.Several scenarios are applied to evaluate the performance of this algorithm.The findings clearly show the effectiveness of the proposed system in the energy management of several MGs,leading to the optimal performance of the resources per MG.Moreover,the proposed control scheme properly controls the MG and grid’s performance in their interactions and offers a high level of robustness,stable behavior under different conditions and high quality of power supply.展开更多
The intelligent product of traditional fuel vehicles in electric vehicle region is the large screen of central control panel, which is the subversive innovative design of electric vehicles and the intelligent symbol u...The intelligent product of traditional fuel vehicles in electric vehicle region is the large screen of central control panel, which is the subversive innovative design of electric vehicles and the intelligent symbol under the Internet innovative thinking. Through the specific analysis of large screen innovative design, target customers, communication channel and communication effect of electric vehicle products, the comprehensive management of large screen communication of electric vehicles can be realized.展开更多
In view of the practical application of centralized traffic control(CTC)system of the Beijing-Shanghai HSR and in combination with the line conditions and user requirements,the system is optimized in terms of route se...In view of the practical application of centralized traffic control(CTC)system of the Beijing-Shanghai HSR and in combination with the line conditions and user requirements,the system is optimized in terms of route self-triggering polling frequency,train receiving route self-triggering timing,train departure route section processing,route self-triggering between yards,wireless route forecasting and automatic train number conversion,which improves the efficiency of automatic route setting of CTC system and the adaptability of high-density and long-major lines.At the same time,according to the intelligent development requirements of railways,the paper proposes the expectation for the centralized traffic control system of the Beijing-Shanghai HSR in terms of intelligent adjustment of TWD,information sharing with traction power supply supervisory control and data acquisition(SCADA)system/disaster monitoring system,intelligent linkage of posts,etc.展开更多
Severe disturbances in a power network can cause the system frequency to exceed the safe operating range.As the last defensive line for system emergency control,under frequency load shedding(UFLS)is an important metho...Severe disturbances in a power network can cause the system frequency to exceed the safe operating range.As the last defensive line for system emergency control,under frequency load shedding(UFLS)is an important method for preventing a wide range of frequency excursions.This paper proposes a hierarchical UFLS scheme of“centralized real-time decision-making and decentralized real-time control”for inter-connected systems.The centralized decision-layer of the scheme takes into account the importance of the load based on the equivalent transformation of kinetic energy(KE)and potential energy(PE)in the transient energy function(TEF),while the load PE is used to determine the load shedding amount(LSA)allocation in different loads after faults in real-time.At the same time,the influence of inertia loss is considered in the calculation of unbalanced power,and the decentralized control center is used to implement the one-stage UFLS process to compensate for the unbalanced power.Simulations are carried out on the modified New England 10-generator 39-bus system and 197-bus system in China to verify the performance of the proposed scheme.The results show that,compared with other LSA allocation indicators,the proposed alloca-tion indicators can achieve better fnadir and td.At the same time,compared with other multi-stage UFLS schemes,the proposed scheme can obtain the maximum fnadir with a smaller LSA in scenarios with high renewable energy sources(RES)penetration.展开更多
文摘Isolated operation of hydropower stations on Wujinag River was seen disadvantages of low rate of water utilization and much loss of electricity caused by abandoned water during low load periods. To tackle the problem, centralized control over cascade hydropower stations is practiced with a considerable economic benef it gained.
基金This work was supported in part by the National Natural science Foundation of China under Grant 51361130150 and Grant 51477067in part by the Fundamental Research Funds for the Central Universities under Grant 2014QN219.
文摘This study presents a centralized control scheme that coordinates parallel operations of power conditioning system(PCS)for the grid interactions of electric vehicles(EVs)in EV charge-discharge and storage integration station.Key issues for the control and operation of PCS under various operation modes are discussed,including vehicle to grid(V2G)mode,stand-alone mode and seamless transfer mode.The intelligent multi-mode charge-discharge method is utilized for the V2G mode,and the parallel control method based on communication network is adopted for the standalone mode.In addition,a novel seamless transfer strategy is proposed,which is able to implement PCS transition between V2G mode and stand-alone mode.The detailed process of the seamless transfer between the two modes is illustrated.Experimental results are presented to show the performance and feasibility of this strategy.
基金supported in part by the National Natural Science Foundation of China under Grant 62071283,Grant 61771296,Grant 61872228 and Grant 62271513in part by the Natural Science Basic Research Plan in Shaanxi Province of China under Grant 2018JQ6048 and Grant 2018JZ6006+3 种基金in part by Shaanxi Key Industrial Innovation Chain Project in Industrial Domain under Grant 2020ZDLGY15-09in part by Guang Dong Basic and Applied Basic Research Foundation under Grant 2021A1515012631in part by China Postdoctoral Science Foundation under Grant 2016M600761in part by the Fundamental Research Funds for the Central Universities under Grant GK202003075 and Grant GK202103016。
文摘With the explosive increasing number of connecting devices such as smart phones, vehicles,drones, and satellites in the wireless networks, how to manage and control such a huge number of networking nodes has become a great challenge. In this paper, we combine the advantages of centralized networks and distributed networks approaches for vehicular networks with the aid of Unmanned Aerial Vehicle(UAV), and propose a Center-controlled Multihop Wireless(CMW) networking scheme consisting of data transmission plane performed by vehicles and the network control plane implemented by the UAV.Besides, we jointly explore the advantages of Medium Access Control(MAC) protocols in the link layer and routing schemes in the network layer to facilitate the multi-hop data transmission for the ground vehicles.Particularly, the network control plane in the UAV can manage the whole network effectively via fully exploiting the acquired network topology information and traffic requests from each vehicle, and implements various kinds of control based on different traffic demands, which can enhance the networking flexibility and scalability significantly in vehicular networks.Simulation results validate the advantages of the proposed scheme compared with existing methods.
文摘We study afresh how the glucose control system anomalies impact the organicity of the glucose homeostasis and build up events of persistent hyperglycemia and diabetes mellitus. We have used critically the state of art literature related to the subject, in order to cross, to compare, and to organize the relevant contents to create a logical and consistent support to the finds. We show that it is consistent to assume that persistent hyperglycemia and diabetes mellitus can have precursors not only in pancreas, but also in brain, mainly induced by noxious dysfunctions of hypothalamus sensor neurons circuits and external noxious elements, causing pancreas overload, and the consequent exhaustion—overburden.
文摘Coordinated taxiing planning for multiple aircraft on flight deck is of vital importance which can dramatically improve the dispatching efficiency.In this paper,first,the coordinated taxiing path planning problem is transformed into a centralized optimal control problem where collision-free conditions and mechanical limits are considered.Since the formulated optimal control problem is of large state space and highly nonlinear,an efficient hierarchical initialization technique based on the Dubins-curve method is proposed.Then,a model predictive controller is designed to track the obtained reference trajectory in the presence of initial state error and external disturbances.Numerical experiments demonstrate that the proposed“offline planningþonline tracking”framework can achieve efficient and robust coordinated taxiing planning and tracking even in the presence of initial state error and continuous external disturbances.
文摘Mr.Jiang Zcmin,Gencral-Seerctary of the Cen-tral Committee of the Chincse Communist Party and.Chairman of the People's Republic of China,in a rC-ccnt spcech cm phasized that the family planning pro-gramme should be strictly and effectively im plemented in 1994,a year of crucial importance for promoting re-form and opening and thc drive lowards.modernization.To makc continucd contributions to the sociocconomic development in the country,we must fulfil the plan for controlling population growth..The spcech was delivcred at the anua!National Fo-rum on Family Planning Work convened jointly by the Party's Central Committcc and the Statc Council.
基金This work was supported in part by the National Natural Science Foundation of China under Grant 62203468Young Elite Scientist Sponsorship Program by CAST under Grant 2022QNRC001+1 种基金Foundation of China State Railway Group Co.,Ltd.under Grant K2021X001Foundation of China Academy of Railway Sciences Corporation Limited under Grant 2021YJ315.
文摘Purpose–The intelligent Central Traffic Control(CTC)system plays a vital role in establishing an intelligent high-speed railway(HSR)system.As the core of HSR transportation command,the intelligent CTC system is a new HSR dispatching command system that integrates the widely used CTC in China with the practical service requirements of intelligent dispatching.This paper aims to propose key technologies and applications for intelligent dispatching command in HSR in China.Design/methodology/approach–This paper first briefly introduces the functions and configuration of the intelligent CTC system.Some new servers,terminals and interfaces are introduced,which are plan adjustment server/terminal,interface for automatic train operation(ATO),interface for Dynamic Monitoring System of Train Control Equipment(DMS),interface for Power Supervisory Control and Data Acquisition(PSCADA),interface for Disaster Monitoring,etc.Findings–The key technologies applied in the intelligent CTC system include automatic adjustment of train operation plans,safety control of train routes and commands,traffic information data platform,integrated simulation of traffic dispatching and ATO function.These technologies have been applied in the Beijing-Zhangjiakou HSR,which commenced operations at the end of 2019.Implementing these key intelligent functions has improved the train dispatching command capacity,ensured the safe operation of intelligent HSR,reduced the labor intensity of dispatching operators and enhanced the intelligence level of China’s dispatching system.Originality/value–This paper provides further challenges and research directions for the intelligent dispatching command of HSR.To achieve the objectives,new measures need to be conducted,including the development of advanced technologies for intelligent dispatching command,coping with new requirements with the development of China’s railway signaling system,the integration of traffic dispatching and train control and the application of AI and data-driven modeling and methods.
文摘A microgrid(MG)refers to a set of loads,generation resources and energy storage systems acting as a controllable load or a generator to supply power and heating to a local area.The MG-generated power management is a central topic for MG design and operation.The existence of dispersed generation(DG)resources has faced MG management with new issues.Depending on the level of exchanges between an MG and the main grid,the MG operation states can be divided into independent or grid-connected ones.Energy management in MGs aims to supply power at the lowest cost for optimal load response.This study examines MG energy management in two operational modes of islanded and grid-connected,and proposes a structure with two control layers(primary and secondary)for energy management.At the principal level of control,the energy management system is determined individually for all MG by taking into consideration the probability constraints and RES uncertainty by the Weibull the probability density function(PDF),generation resources’power as well as the generation surplus and deficit of each MG.Then,the information of the power surplus and deficit of each MG must be sent to the central energy management system.To confirm the proposed structure,a case system with two MGs and a condensive load is simulated by using a multi-time harmony search algorithm.Several scenarios are applied to evaluate the performance of this algorithm.The findings clearly show the effectiveness of the proposed system in the energy management of several MGs,leading to the optimal performance of the resources per MG.Moreover,the proposed control scheme properly controls the MG and grid’s performance in their interactions and offers a high level of robustness,stable behavior under different conditions and high quality of power supply.
文摘The intelligent product of traditional fuel vehicles in electric vehicle region is the large screen of central control panel, which is the subversive innovative design of electric vehicles and the intelligent symbol under the Internet innovative thinking. Through the specific analysis of large screen innovative design, target customers, communication channel and communication effect of electric vehicle products, the comprehensive management of large screen communication of electric vehicles can be realized.
文摘In view of the practical application of centralized traffic control(CTC)system of the Beijing-Shanghai HSR and in combination with the line conditions and user requirements,the system is optimized in terms of route self-triggering polling frequency,train receiving route self-triggering timing,train departure route section processing,route self-triggering between yards,wireless route forecasting and automatic train number conversion,which improves the efficiency of automatic route setting of CTC system and the adaptability of high-density and long-major lines.At the same time,according to the intelligent development requirements of railways,the paper proposes the expectation for the centralized traffic control system of the Beijing-Shanghai HSR in terms of intelligent adjustment of TWD,information sharing with traction power supply supervisory control and data acquisition(SCADA)system/disaster monitoring system,intelligent linkage of posts,etc.
基金supported in part by the National Key R&D Program of China“Response-driven intelligent enhanced analysis and control for bulk power system stability”under Grant 2021YFB2400800.
文摘Severe disturbances in a power network can cause the system frequency to exceed the safe operating range.As the last defensive line for system emergency control,under frequency load shedding(UFLS)is an important method for preventing a wide range of frequency excursions.This paper proposes a hierarchical UFLS scheme of“centralized real-time decision-making and decentralized real-time control”for inter-connected systems.The centralized decision-layer of the scheme takes into account the importance of the load based on the equivalent transformation of kinetic energy(KE)and potential energy(PE)in the transient energy function(TEF),while the load PE is used to determine the load shedding amount(LSA)allocation in different loads after faults in real-time.At the same time,the influence of inertia loss is considered in the calculation of unbalanced power,and the decentralized control center is used to implement the one-stage UFLS process to compensate for the unbalanced power.Simulations are carried out on the modified New England 10-generator 39-bus system and 197-bus system in China to verify the performance of the proposed scheme.The results show that,compared with other LSA allocation indicators,the proposed alloca-tion indicators can achieve better fnadir and td.At the same time,compared with other multi-stage UFLS schemes,the proposed scheme can obtain the maximum fnadir with a smaller LSA in scenarios with high renewable energy sources(RES)penetration.