Recent research on deterministic methods for circulating cooling water systems optimization has been well developed. However, the actual operating conditions of the system are mostly variable, so the system obtained u...Recent research on deterministic methods for circulating cooling water systems optimization has been well developed. However, the actual operating conditions of the system are mostly variable, so the system obtained under deterministic conditions may not be stable and economical. This paper studies the optimization of circulating cooling water systems under uncertain circumstance. To improve the reliability of the system and reduce the water and energy consumption, the influence of different uncertain parameters is taken into consideration. The chance constrained programming method is used to build a model under uncertain conditions, where the confidence level indicates the degree of constraint violation. Probability distribution functions are used to describe the form of uncertain parameters. The objective is to minimize the total cost and obtain the optimal cooling network configuration simultaneously.An algorithm based on Monte Carlo method is proposed, and GAMS software is used to solve the mixed integer nonlinear programming model. A case is optimized to verify the validity of the model. Compared with the deterministic optimization method, the results show that when considering the different types of uncertain parameters, a system with better economy and reliability can be obtained(total cost can be reduced at least 2%).展开更多
The volatile wind power generation brings a full spectrum of problems to power system operation and management, ranging from transient system frequency fluctuation to steady state supply and demand balancing issue. In...The volatile wind power generation brings a full spectrum of problems to power system operation and management, ranging from transient system frequency fluctuation to steady state supply and demand balancing issue. In this paper, a novel wind integrated power system day-ahead economic dispatch model, with the consideration of generation and reserve cost is modelled and investigated. The proposed problem is first formulated as a chance constrained stochastic nonlinear programming(CCSNLP), and then transformed into a deterministic nonlinear programming(NLP). To tackle this NLP problem, a three-stage framework consists of particle swarm optimization(PSO), sequential quadratic programming(SQP) and Monte Carlo simulation(MCS) is proposed. The PSO is employed to heuristically search the line power flow limits, which are used by the SQP as constraints to solve the NLP problem. Then the solution from SQP is verified on benchmark system by using MCS. Finally, the verified results are feedback to the PSO as fitness value to update the particles. Simulation study on IEEE30-bus system with wind power penetration is carried out, and the results demonstrate that the proposed dispatch model could be effectively solved by the proposed three-stage approach.展开更多
Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we p...Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.展开更多
Unit commitment (UC) problem is one of the most important decision making problems in power system. In this paper the UC problem is solved by considering it as a real time problem by adding stochasticity in the gene...Unit commitment (UC) problem is one of the most important decision making problems in power system. In this paper the UC problem is solved by considering it as a real time problem by adding stochasticity in the generation side because of wind-thermal co-ordination system as well as stochasticity in the load side by incorporating the randomness of the load. The most important issue that needs to be addressed is the achievement of an economic unit commitment solution after solving UC as a real time problem. This paper proposes a hybrid approach to solve the stochastic UC problem considering the volatile nature of wind and formulating the UC problem as a chance constrained problem in which the load is met with high probability over the entire time period.展开更多
To manage a large amount of flexible distributed energy resources(DERs)in the distribution networks,the virtual power plant(VPP)is introduced into the industry.The VPP can optimally dispatch these resources in a clust...To manage a large amount of flexible distributed energy resources(DERs)in the distribution networks,the virtual power plant(VPP)is introduced into the industry.The VPP can optimally dispatch these resources in a cluster manner and provide flexibility for the power system operation as a whole.Most existing studies formulate the equivalent power flexibility of the aggregating DERs as deterministic optimization models without considering their uncertainties.In this paper,we introduce the stochastic power flexibility range(PFR)and timecoupling flexibility(TCF)to describe the power flexibility of VPP.In this model,both operational constraints and the randomness of the DERs’output are incorporated,and a combined model and data-driven solution is proposed to obtain the stochastic PFR,TCF,and cost function of VPP.The aggregating model can be easily incorporated into the optimization model for the power system operator or market bidding,considering uncertainties.Finally,a numerical test is performed.The results show that the proposed model not only has higher computational efficiency than the scenario-based methods but also achieves more economic benefits.展开更多
基金Financial support from the National Natural Science Foundation of China (22022816, 22078358)。
文摘Recent research on deterministic methods for circulating cooling water systems optimization has been well developed. However, the actual operating conditions of the system are mostly variable, so the system obtained under deterministic conditions may not be stable and economical. This paper studies the optimization of circulating cooling water systems under uncertain circumstance. To improve the reliability of the system and reduce the water and energy consumption, the influence of different uncertain parameters is taken into consideration. The chance constrained programming method is used to build a model under uncertain conditions, where the confidence level indicates the degree of constraint violation. Probability distribution functions are used to describe the form of uncertain parameters. The objective is to minimize the total cost and obtain the optimal cooling network configuration simultaneously.An algorithm based on Monte Carlo method is proposed, and GAMS software is used to solve the mixed integer nonlinear programming model. A case is optimized to verify the validity of the model. Compared with the deterministic optimization method, the results show that when considering the different types of uncertain parameters, a system with better economy and reliability can be obtained(total cost can be reduced at least 2%).
基金supported in part by the National Science Foundation(ECCS1053717,CNS 1117314)the National Science Foundation of China(51529701,51277135)
文摘The volatile wind power generation brings a full spectrum of problems to power system operation and management, ranging from transient system frequency fluctuation to steady state supply and demand balancing issue. In this paper, a novel wind integrated power system day-ahead economic dispatch model, with the consideration of generation and reserve cost is modelled and investigated. The proposed problem is first formulated as a chance constrained stochastic nonlinear programming(CCSNLP), and then transformed into a deterministic nonlinear programming(NLP). To tackle this NLP problem, a three-stage framework consists of particle swarm optimization(PSO), sequential quadratic programming(SQP) and Monte Carlo simulation(MCS) is proposed. The PSO is employed to heuristically search the line power flow limits, which are used by the SQP as constraints to solve the NLP problem. Then the solution from SQP is verified on benchmark system by using MCS. Finally, the verified results are feedback to the PSO as fitness value to update the particles. Simulation study on IEEE30-bus system with wind power penetration is carried out, and the results demonstrate that the proposed dispatch model could be effectively solved by the proposed three-stage approach.
基金funded by Major Science and Technology Projects in Gansu Province(19ZD2GA003).
文摘Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.
文摘Unit commitment (UC) problem is one of the most important decision making problems in power system. In this paper the UC problem is solved by considering it as a real time problem by adding stochasticity in the generation side because of wind-thermal co-ordination system as well as stochasticity in the load side by incorporating the randomness of the load. The most important issue that needs to be addressed is the achievement of an economic unit commitment solution after solving UC as a real time problem. This paper proposes a hybrid approach to solve the stochastic UC problem considering the volatile nature of wind and formulating the UC problem as a chance constrained problem in which the load is met with high probability over the entire time period.
基金supported in part by the National Natural Science Foundation of China under Grant U2066601,51725703Southern Power Grid Technical Project GDKJXM20185069(032000KK52180069).
文摘To manage a large amount of flexible distributed energy resources(DERs)in the distribution networks,the virtual power plant(VPP)is introduced into the industry.The VPP can optimally dispatch these resources in a cluster manner and provide flexibility for the power system operation as a whole.Most existing studies formulate the equivalent power flexibility of the aggregating DERs as deterministic optimization models without considering their uncertainties.In this paper,we introduce the stochastic power flexibility range(PFR)and timecoupling flexibility(TCF)to describe the power flexibility of VPP.In this model,both operational constraints and the randomness of the DERs’output are incorporated,and a combined model and data-driven solution is proposed to obtain the stochastic PFR,TCF,and cost function of VPP.The aggregating model can be easily incorporated into the optimization model for the power system operator or market bidding,considering uncertainties.Finally,a numerical test is performed.The results show that the proposed model not only has higher computational efficiency than the scenario-based methods but also achieves more economic benefits.