期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Response characteristics of an ascending auditory neuron AN3 and its projections in the brain of the bushcricket Gampsocleis grationsa 被引量:3
1
作者 GAO Panpan and SHEN Jun -Xian(Institute of Biophysics, Academia Sinica, Beijing 100080)The phonotaxis of bushcrickets demonstrates that they have good capability of recognizing conspecific songs and locating the sound source, which bases on complicated auditory mechanisms of the central nervous system (CNS). This article describes the response characteristics of AN3, an auditory ascending neuron in the prothoracic ganglion, and its projections within the brain. The AN3 , with a quasi-tonic discharge pattern, has high sensitivity, directionality and ability to encode sound intensity. Therefore, it plays an important role in auditory information processing of CNS. Its projections in the brain are mainly concentrated in the lateral zone of the deutencephalon, where synaptically connecting local auditory interneurons in the brain. 《Chinese Journal of Acoustics》 1992年第1期84-88,共5页
The phonotaxis of bushcrickets demonstrates that they have goodcapability of recognizing conspecific songs and locating the sound source,which bases on complicated auditory mechanisms of the central nervoussystem(CNS)... The phonotaxis of bushcrickets demonstrates that they have goodcapability of recognizing conspecific songs and locating the sound source,which bases on complicated auditory mechanisms of the central nervoussystem(CNS).This article describes the response characteristics of AN3,an auditory ascending neuron in the prothoracic ganglion,and its projec-tions within the brain.The AN3,with a quasi-tonic discharge pattern,has high sensitivity,directionality and ability to encode sound intensity.Therefore,it plays an important role in auditory information processingof CNS.Its projections in the brain are mainly concentrated in the lateralzone of the deutencephalon,where synaptically connecting local auditoryinterneurons in the brain. 展开更多
关键词 Response characteristics of an ascending auditory neuron AN3 and its projections in the brain of the bushcricket Gampsocleis grationsa
原文传递
PRELIMINARY STUDY OF GREEN DESIGN AND PROJECT DELIVERY METHODS IN THE PUBLIC SECTOR
2
作者 Melissa Bilec Robert Ries 《Journal of Green Building》 2007年第2期151-160,共10页
The selection of the project delivery method(PDM)for any project is critical—it establishes the communication,coordination,and contractual interfaces between the owner,contractor,and designer.With an increase in the ... The selection of the project delivery method(PDM)for any project is critical—it establishes the communication,coordination,and contractual interfaces between the owner,contractor,and designer.With an increase in the number of green design projects,understanding the relationship between the PDM and green design is paramount to project and contract management.While it is reasonable to assume that a relationship between green design and design-build(DB)exists since both theoretically are intended to foster an integrated,holistic,team-based collaborative project;it is also appropriate to understand the relationship between green design and other PDMs.This preliminary research examined possible relationships between design-bid-build(DBB),construction management(CM),and DB PDMs and green design with the goal of beginning to identify potential positive correspondence between them.To develop an initial understanding,two main tasks were completed.First,existing published research was evaluated to reveal aspects of projects and PDMs independent of green design.Second,the research collected primarily qualitative information by conducting structured interviews with approximately twenty-five individuals,including owners,contractors,and designers involved in completed green design projects,mainly in the public sector.Upon completion of the structured interviews,responses from the interviews were reviewed for green design project characteristics.Additionally,the interviews provided insight on the initial understanding of the current state of knowledge and experience in green design and PDMs.After the two main tasks were completed,both were evaluated for commonalities.Preliminary results found that seven green design project characteristics emerged that in some cases related to a specific PDM,but in other cases were independent of a PDM.Future research will quantitatively investigate the relationship between green design projects,PDMs,and success factors. 展开更多
关键词 green design project delivery methods project characteristics
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部