The water Cherenkov detector array(WCDA) is an important part of the large high-altitude air shower observatory(LHAASO),which is in a research and development phase.The central scientific goal of LHAASO is to explore ...The water Cherenkov detector array(WCDA) is an important part of the large high-altitude air shower observatory(LHAASO),which is in a research and development phase.The central scientific goal of LHAASO is to explore the origin of high-energy cosmic rays of the universe and to push forward the frontier of new physics.To simplify the WCDA's readout electronics,a prototype of a front-end readout for an application-specific integrated circuit(ASIC) is designed based on the timeover-threshold method to achieve charge-to-time conversion.High-precision time measurement and charge measurement are necessary over a full dynamic range[1-4000photoelectrons(P.E.)].To evaluate the performance of this ASIC,a test system is designed that includes the front-end ASIC test module,digitization module,and test software.The first module needs to be customized for different ASIC versions,whereas the digitization module and test software are tested for general-purpose use.In the digitization module,a field programmable gate array-based time-todigital converter is designed with a bin size of 333 ps,which also integrates an inter-integrated circuit to configure the ASIC test module,and a universal serial bus interface is designed to transfer data to the remote computer.Test results indicate that the time resolution is better than 0.5 ns,and the charge resolution is better than 30%root mean square(RMS) at 1 P.E.and 3%RMS at 4000 P.E.,which are beyond the application requirements.展开更多
This paper analyzed the reliability and put forward the reliability index of overload protection for moulded case circuit breaker. The success rate was adopted as its reliability index of overload protection. Based on...This paper analyzed the reliability and put forward the reliability index of overload protection for moulded case circuit breaker. The success rate was adopted as its reliability index of overload protection. Based on the reliability index and the reli- ability level, the reliability examination plan was analyzed and a test device for the overload protection of moulded case cir- cuit-breaker was developed. In the reliability test of overload protection, two power sources were used, which reduced the time of conversion and regulation between two different test currents in the overload protection test, which made the characteristic test more accurate. The test device was designed on the base of a Windows system, which made its operation simple and friendly.展开更多
Lithium iron phosphate batteries have been increasingly utilized in recent years because their higher safety performance can improve the increasing trend of recurring thermal runaway accidents.However,the safety perfo...Lithium iron phosphate batteries have been increasingly utilized in recent years because their higher safety performance can improve the increasing trend of recurring thermal runaway accidents.However,the safety performance and mechanism of high-capacity lithium iron phosphate batteries under internal short-circuit challenges remain to be explored.This work analyzes the thermal runaway evolution of high-capacity LiFePO_(4) batteries under different internal heat transfer modes,which are controlled by different penetration modes.Two penetration cases involving complete penetration and incomplete penetration were detected during the test,and two modes were performed incorporating nails that either remained or were removed after penetration to comprehensively reveal the thermal runaway mechanism.A theoretical model of microcircuits and internal heat conduction is also established.The results indicated three thermal runaway evolution processes for high-capacity batteries,which corresponded to the experimental results of thermal equilibrium,single thermal runaway,and two thermal runaway events.The difference in heat distribution in the three phenomena is determined based on the microstructure and material structure near the pinhole.By controlling the heat dissipation conditions,the time interval between two thermal runaway events can be delayed from 558 to 1417 s,accompanied by a decrease in the concentration of in-situ gas production during the second thermal runaway event.展开更多
With the growth of capacity of high voltage direct current(HVDC) transmission lines,the ratings of thyristor valves,which are one of the most critical equipments,are getting higher and higher.Verification of performan...With the growth of capacity of high voltage direct current(HVDC) transmission lines,the ratings of thyristor valves,which are one of the most critical equipments,are getting higher and higher.Verification of performance of thyristor valves particularly designed for HVDC project plays an important role in the handover of products between the manufacturer and the client.Conventional test facilities based on philosophy of direct test cannot meet the requirements for modern thyristor valves.New test facilities with high ratings are necessarily built based on philosophy of synthetic test.Over the conventional direct test circuit,the later is an economical and feasible solution with less financial investment and higher test capability.However,the equivalency between the synthetic test and the direct test should be analyzed technically in order to make sure that the condition of verification test in a synthetic test circuit should satisfy the actual operation condition of thyristor valves existing in a real HVDC project,just as in a direct test circuit.Equivalency analysis is focused in this paper,covering the scope of thyristor valves' steady state,and transient state.On the basis of the results achieved,a synthetic test circuit of 6 500 A/50 kV for operational tests of thyristor valves used for up to UHVDC project has newly been set up and already put into service in Xi'an High Voltage Apparatus Research Institute Co.,Ltd.(XIHARI),China.Some of the results have been adopted also by a new national standard of China.展开更多
An important means for digital circuit analysis, design. maintenance and production is the IC chip test and analysis. With digital circuit application prevailing today, the automatic test and analysis of digital circu...An important means for digital circuit analysis, design. maintenance and production is the IC chip test and analysis. With digital circuit application prevailing today, the automatic test and analysis of digital circuits is going to play a more important role. It can save a great deal of time and cost for the maintenance of equipment and can also provide correst analytical data for designers.展开更多
In the Paper,the author introduces an embedded design verification test based on specific chips to solve the technical problems of microwave circuit test and fault diagnosis.The author explains embedded design of micr...In the Paper,the author introduces an embedded design verification test based on specific chips to solve the technical problems of microwave circuit test and fault diagnosis.The author explains embedded design of microwave circuit modules and approach of hardware design and software design,and finally verifies the embedded design of microwave circuit modules based on specific chips.展开更多
We review the short-circuit testing of distribution and power transformers, and include a list of 110-220kV power transformers tested up to February 2002.
In response to the growing complexity and performance of integrated circuit(IC),there is an urgent need to enhance the testing and stability of IC test equipment.A method was proposed to predict equipment stability us...In response to the growing complexity and performance of integrated circuit(IC),there is an urgent need to enhance the testing and stability of IC test equipment.A method was proposed to predict equipment stability using the upper side boundary value of normal distribution.Initially,the K-means clustering algorithm classifies and analyzes sample data.The accuracy of this boundary value is compared under two common confidence levels to select the optimal threshold.A range is then defined to categorize unqualified test data.Through experimental verification,the method achieves the purpose of measuring the stability of qualitative IC equipment through a deterministic threshold value and judging the stability of the equipment by comparing the number of unqualified data with the threshold value,which realizes the goal of long-term operation monitoring and stability analysis of IC test equipment.展开更多
In order to deal with the limitations during the register transfer level verification, a new functional verification method based on the random testing for the system-level of system-on-chip is proposed.The validity o...In order to deal with the limitations during the register transfer level verification, a new functional verification method based on the random testing for the system-level of system-on-chip is proposed.The validity of this method is proven theoretically.Specifically, testcases are generated according to many approaches of randomization.Moreover, the testbench for the system-level verification according to the proposed method is designed by using advanced modeling language.Therefore, under the circumstances that the testbench generates testcases quickly, the hardware/software co-simulation and co-verification can be implemented and the hardware/software partitioning planning can be evaluated easily.The comparison method is put to use in the evaluation approach of the testing validity.The evaluation result indicates that the efficiency of the partition testing is better than that of the random testing only when one or more subdomains are covered over with the area of errors, although the efficiency of the random testing is generally better than that of the partition testing.The experimental result indicates that this method has a good performance in the functional coverage and the cost of testing and can discover the functional errors as soon as possible.展开更多
In this paper, to simulate the arc motion in an air circuit breaker (ACB), a three- dimensional magneto-hydrodynamic (MHD) model is developed, considering the influence of ther- mal radiation, the change of physic...In this paper, to simulate the arc motion in an air circuit breaker (ACB), a three- dimensional magneto-hydrodynamic (MHD) model is developed, considering the influence of ther- mal radiation, the change of physical parameters of arc plasma and the nonlinear characteristic of ferromagnetic material. The distributions of pressure, temperature, gas flow and current density of arc plasma in the arc region are calculated. The simulation results show some phenomena which discourage arc interruption, such as back commutation and arc burning at the back of the splitter plate. To verify the simulation model, the arc motion is studied experimentally. The influences of the material and position of the innermost barrier plate are analyzed mainly. It proved that the model developed in this paper can efficiently simulate the arc motion. The results indicate that the insulation barrier plate close to the top of the splitter plate is conducive to the arc splitting, which leads to the significant increase of the arc voltage, so it is better for arc interruption. The research can provide methods and references to the optimization of ACB design.展开更多
Firstly, relevant stress properties of millisecond level breaking process and microsecond level commutation process of hybrid HVDC circuit breaker are studied in detail on the basis of the analysis for the application...Firstly, relevant stress properties of millisecond level breaking process and microsecond level commutation process of hybrid HVDC circuit breaker are studied in detail on the basis of the analysis for the application environment and topological structure and operating principles of hybrid circuit breakers, and key stress parameters in transient state process of two time dimensions are extracted. The established digital simulation circuit for PSCAD/EMTDC device-level operation of the circuit breaker has verified the stress properties of millisecond level breaking process and microsecond level commutation process. Then, equivalent test method, circuits and parameters based on LC power supply are proposed on the basis of stress extraction. Finally, the results of implemented breaking tests for complete 200 kV circuit breaker, 100 kV and 50 kV circuit breaker units, as well as single power electronic module have verified the accuracy of the simulation circuit and mathematical analysis. The result of this paper can be a guide to electrical structure and test system design of hybrid HVDC circuit breaker.展开更多
Dear Editor: There is accumulating evidence that human blood electronic circuit components and their application circuits become more and more important to cyborg implant/engineering, man-machine interface, hu- man ...Dear Editor: There is accumulating evidence that human blood electronic circuit components and their application circuits become more and more important to cyborg implant/engineering, man-machine interface, hu- man disease detection and healing, and artificial brain evolutionusl. Here, we report the first development of human plasma-based amplifier circuit in the dis- crete as well as integrated circuit (IC) configuration mode. Electrolytes in the human blood contain an enormous number of charge carriers such as positive and negative molecule/atom ions, which are electri- cally conducting media and therefore can be utilized for developing electronic circuit components and their application circuits. These electronic circuits obvi- ously have very high application impact potential towards bio-medical engineering and medical science and technology.展开更多
The problem of ice induced vibration is common to ocean engineering of cold region countries. To study the ice induced vibration of a compliant conical structure, a series of model tests have been performed and some b...The problem of ice induced vibration is common to ocean engineering of cold region countries. To study the ice induced vibration of a compliant conical structure, a series of model tests have been performed and some breakthrough progresses made. The ice sheet before the compliant conical structure is found to fail by two-time breaking in the tests. The process of two-time breaking behaves in two modes, and the general control of the ice and structural conditions determine the mode in which the ice force would behave. Two dynamic ice force functions are established respectively for the two modes of two-time breaking process in this paper. The numerical simulation results are in good agreement with the measured results, indicating that the dynamic ice force functions given in this paper can fully reflect the real situation of the dynamic ice force on a compliant conical structure.展开更多
To study ice-induced vibration of a compliant conical structure, a series of model tests were performed from 2004 to 2005. In the tests, the ice sheet before the compliant conical structure was found to fail in two-ti...To study ice-induced vibration of a compliant conical structure, a series of model tests were performed from 2004 to 2005. In the tests, the ice sheet before the compliant conical structure was found to fail in two-time breaking. From 2005 to 2006, this type of ice failure was studied through more groups of tests. The tests show that two-time breaking is the typical failure of ice before steep conical structures, and is controlled by other factors at the same time, such as ice speed and the angle of the cone.展开更多
A heavy-ion irradiation experiment is studied in digital storage cells with different design approaches in 130?nm CMOS bulk Si and silicon-on-insulator (SOI) technologies. The effectiveness of linear energy transf...A heavy-ion irradiation experiment is studied in digital storage cells with different design approaches in 130?nm CMOS bulk Si and silicon-on-insulator (SOI) technologies. The effectiveness of linear energy transfer (LET) with a tilted ion beam at the 130?nm technology node is obtained. Tests of tilted angles θ=0 ° , 30 ° and 60 ° with respect to the normal direction are performed under heavy-ion Kr with certain power whose LET is about 40?MeVcm 2 /mg at normal incidence. Error numbers in D flip-flop chains are used to determine their upset sensitivity at different incidence angles. It is indicated that the effective LETs for SOI and bulk Si are not exactly in inverse proportion to cosθ , furthermore the effective LET for SOI is more closely in inverse proportion to cosθ compared to bulk Si, which are also the well known behavior. It is interesting that, if we design the sample in the dual interlocked storage cell approach, the effective LET in bulk Si will look like inversely proportional to cosθ very well, which is also specifically explained.展开更多
For the study on the ice-induced vibration of a compliant mono-cone structure,a series of model tests were performed from 2004 to 2006.In these tests,the ice sheet before the compliant conical structure was found to b...For the study on the ice-induced vibration of a compliant mono-cone structure,a series of model tests were performed from 2004 to 2006.In these tests,the ice sheet before the compliant conical structure was found to be failed in two-time breaking.Based on this important finding,model tests study of the ice force on a compliant multi-cone structure were performed from 2006 to 2007.In these tests,the ice sheet broke before each single cone non-simultaneously.The exciting energy of the total ice force was found to be in a wide range of frequencies,and the structure can be easily excited with nonlinear resonance.展开更多
基金supported by the Knowledge Innovation Program of the Chinese Academy of Sciences(KJCX2-YW-N27)the CAS Center for Excellence in Particle Physics(CCEPP)
文摘The water Cherenkov detector array(WCDA) is an important part of the large high-altitude air shower observatory(LHAASO),which is in a research and development phase.The central scientific goal of LHAASO is to explore the origin of high-energy cosmic rays of the universe and to push forward the frontier of new physics.To simplify the WCDA's readout electronics,a prototype of a front-end readout for an application-specific integrated circuit(ASIC) is designed based on the timeover-threshold method to achieve charge-to-time conversion.High-precision time measurement and charge measurement are necessary over a full dynamic range[1-4000photoelectrons(P.E.)].To evaluate the performance of this ASIC,a test system is designed that includes the front-end ASIC test module,digitization module,and test software.The first module needs to be customized for different ASIC versions,whereas the digitization module and test software are tested for general-purpose use.In the digitization module,a field programmable gate array-based time-todigital converter is designed with a bin size of 333 ps,which also integrates an inter-integrated circuit to configure the ASIC test module,and a universal serial bus interface is designed to transfer data to the remote computer.Test results indicate that the time resolution is better than 0.5 ns,and the charge resolution is better than 30%root mean square(RMS) at 1 P.E.and 3%RMS at 4000 P.E.,which are beyond the application requirements.
基金Project (No. E2005000039) supported by the Natural Science Foun-dation of Hebei Province, China
文摘This paper analyzed the reliability and put forward the reliability index of overload protection for moulded case circuit breaker. The success rate was adopted as its reliability index of overload protection. Based on the reliability index and the reli- ability level, the reliability examination plan was analyzed and a test device for the overload protection of moulded case cir- cuit-breaker was developed. In the reliability test of overload protection, two power sources were used, which reduced the time of conversion and regulation between two different test currents in the overload protection test, which made the characteristic test more accurate. The test device was designed on the base of a Windows system, which made its operation simple and friendly.
基金supported by the National Key R&D Program of China(2021YFB2402001)the China National Postdoctoral Program for Innovative Talents(BX20220286)+1 种基金the China Postdoctoral Science Foundation(2022T150615)supported by the Youth Innovation Promotion Association CAS(Y201768)。
文摘Lithium iron phosphate batteries have been increasingly utilized in recent years because their higher safety performance can improve the increasing trend of recurring thermal runaway accidents.However,the safety performance and mechanism of high-capacity lithium iron phosphate batteries under internal short-circuit challenges remain to be explored.This work analyzes the thermal runaway evolution of high-capacity LiFePO_(4) batteries under different internal heat transfer modes,which are controlled by different penetration modes.Two penetration cases involving complete penetration and incomplete penetration were detected during the test,and two modes were performed incorporating nails that either remained or were removed after penetration to comprehensively reveal the thermal runaway mechanism.A theoretical model of microcircuits and internal heat conduction is also established.The results indicated three thermal runaway evolution processes for high-capacity batteries,which corresponded to the experimental results of thermal equilibrium,single thermal runaway,and two thermal runaway events.The difference in heat distribution in the three phenomena is determined based on the microstructure and material structure near the pinhole.By controlling the heat dissipation conditions,the time interval between two thermal runaway events can be delayed from 558 to 1417 s,accompanied by a decrease in the concentration of in-situ gas production during the second thermal runaway event.
基金Project Supported by National Development and Reform Commission(No.[2006]2709)
文摘With the growth of capacity of high voltage direct current(HVDC) transmission lines,the ratings of thyristor valves,which are one of the most critical equipments,are getting higher and higher.Verification of performance of thyristor valves particularly designed for HVDC project plays an important role in the handover of products between the manufacturer and the client.Conventional test facilities based on philosophy of direct test cannot meet the requirements for modern thyristor valves.New test facilities with high ratings are necessarily built based on philosophy of synthetic test.Over the conventional direct test circuit,the later is an economical and feasible solution with less financial investment and higher test capability.However,the equivalency between the synthetic test and the direct test should be analyzed technically in order to make sure that the condition of verification test in a synthetic test circuit should satisfy the actual operation condition of thyristor valves existing in a real HVDC project,just as in a direct test circuit.Equivalency analysis is focused in this paper,covering the scope of thyristor valves' steady state,and transient state.On the basis of the results achieved,a synthetic test circuit of 6 500 A/50 kV for operational tests of thyristor valves used for up to UHVDC project has newly been set up and already put into service in Xi'an High Voltage Apparatus Research Institute Co.,Ltd.(XIHARI),China.Some of the results have been adopted also by a new national standard of China.
文摘An important means for digital circuit analysis, design. maintenance and production is the IC chip test and analysis. With digital circuit application prevailing today, the automatic test and analysis of digital circuits is going to play a more important role. It can save a great deal of time and cost for the maintenance of equipment and can also provide correst analytical data for designers.
文摘In the Paper,the author introduces an embedded design verification test based on specific chips to solve the technical problems of microwave circuit test and fault diagnosis.The author explains embedded design of microwave circuit modules and approach of hardware design and software design,and finally verifies the embedded design of microwave circuit modules based on specific chips.
文摘We review the short-circuit testing of distribution and power transformers, and include a list of 110-220kV power transformers tested up to February 2002.
基金the National Natural Science Foundation of China(61306046,61640421)the Yicheng Elite Project(202371)+3 种基金the Open Project of National Local Joint Engineering Laboratory of RF Integration and Micro-assembly Technology(KFJJ20230101)the National Key Laboratory of Integrated Chips and Systems Project(SLICS-K202316)the Anhui University Research Project(2023AH050481)the Research on Testing Methods and Accuracy of High Frequency Signal Chips(2023AH050500)。
文摘In response to the growing complexity and performance of integrated circuit(IC),there is an urgent need to enhance the testing and stability of IC test equipment.A method was proposed to predict equipment stability using the upper side boundary value of normal distribution.Initially,the K-means clustering algorithm classifies and analyzes sample data.The accuracy of this boundary value is compared under two common confidence levels to select the optimal threshold.A range is then defined to categorize unqualified test data.Through experimental verification,the method achieves the purpose of measuring the stability of qualitative IC equipment through a deterministic threshold value and judging the stability of the equipment by comparing the number of unqualified data with the threshold value,which realizes the goal of long-term operation monitoring and stability analysis of IC test equipment.
基金supported by the National High Technology Research and Development Program of China (863 Program) (2002AA1Z1490)Specialized Research Fund for the Doctoral Program of Higher Education (20040486049)the University Cooperative Research Fund of Huawei Technology Co., Ltd
文摘In order to deal with the limitations during the register transfer level verification, a new functional verification method based on the random testing for the system-level of system-on-chip is proposed.The validity of this method is proven theoretically.Specifically, testcases are generated according to many approaches of randomization.Moreover, the testbench for the system-level verification according to the proposed method is designed by using advanced modeling language.Therefore, under the circumstances that the testbench generates testcases quickly, the hardware/software co-simulation and co-verification can be implemented and the hardware/software partitioning planning can be evaluated easily.The comparison method is put to use in the evaluation approach of the testing validity.The evaluation result indicates that the efficiency of the partition testing is better than that of the random testing only when one or more subdomains are covered over with the area of errors, although the efficiency of the random testing is generally better than that of the partition testing.The experimental result indicates that this method has a good performance in the functional coverage and the cost of testing and can discover the functional errors as soon as possible.
基金supported by National Key Basic Research Program of China (973 Program) (Nos.2015CB251002,6132620303)National Natural Science Foundation of China (Nos.51221005,51377128,51577144)the Fundamental Research Funds for the Central Universities,China
文摘In this paper, to simulate the arc motion in an air circuit breaker (ACB), a three- dimensional magneto-hydrodynamic (MHD) model is developed, considering the influence of ther- mal radiation, the change of physical parameters of arc plasma and the nonlinear characteristic of ferromagnetic material. The distributions of pressure, temperature, gas flow and current density of arc plasma in the arc region are calculated. The simulation results show some phenomena which discourage arc interruption, such as back commutation and arc burning at the back of the splitter plate. To verify the simulation model, the arc motion is studied experimentally. The influences of the material and position of the innermost barrier plate are analyzed mainly. It proved that the model developed in this paper can efficiently simulate the arc motion. The results indicate that the insulation barrier plate close to the top of the splitter plate is conducive to the arc splitting, which leads to the significant increase of the arc voltage, so it is better for arc interruption. The research can provide methods and references to the optimization of ACB design.
基金supported by SGCC Scientific and Technological Project(52110116004W)
文摘Firstly, relevant stress properties of millisecond level breaking process and microsecond level commutation process of hybrid HVDC circuit breaker are studied in detail on the basis of the analysis for the application environment and topological structure and operating principles of hybrid circuit breakers, and key stress parameters in transient state process of two time dimensions are extracted. The established digital simulation circuit for PSCAD/EMTDC device-level operation of the circuit breaker has verified the stress properties of millisecond level breaking process and microsecond level commutation process. Then, equivalent test method, circuits and parameters based on LC power supply are proposed on the basis of stress extraction. Finally, the results of implemented breaking tests for complete 200 kV circuit breaker, 100 kV and 50 kV circuit breaker units, as well as single power electronic module have verified the accuracy of the simulation circuit and mathematical analysis. The result of this paper can be a guide to electrical structure and test system design of hybrid HVDC circuit breaker.
文摘Dear Editor: There is accumulating evidence that human blood electronic circuit components and their application circuits become more and more important to cyborg implant/engineering, man-machine interface, hu- man disease detection and healing, and artificial brain evolutionusl. Here, we report the first development of human plasma-based amplifier circuit in the dis- crete as well as integrated circuit (IC) configuration mode. Electrolytes in the human blood contain an enormous number of charge carriers such as positive and negative molecule/atom ions, which are electri- cally conducting media and therefore can be utilized for developing electronic circuit components and their application circuits. These electronic circuits obvi- ously have very high application impact potential towards bio-medical engineering and medical science and technology.
文摘The problem of ice induced vibration is common to ocean engineering of cold region countries. To study the ice induced vibration of a compliant conical structure, a series of model tests have been performed and some breakthrough progresses made. The ice sheet before the compliant conical structure is found to fail by two-time breaking in the tests. The process of two-time breaking behaves in two modes, and the general control of the ice and structural conditions determine the mode in which the ice force would behave. Two dynamic ice force functions are established respectively for the two modes of two-time breaking process in this paper. The numerical simulation results are in good agreement with the measured results, indicating that the dynamic ice force functions given in this paper can fully reflect the real situation of the dynamic ice force on a compliant conical structure.
基金This project is financially supported by the National High Technology Research Development Program of China(863Program) by the National Natural Science Foundation of China(Grant No.50609015)
文摘To study ice-induced vibration of a compliant conical structure, a series of model tests were performed from 2004 to 2005. In the tests, the ice sheet before the compliant conical structure was found to fail in two-time breaking. From 2005 to 2006, this type of ice failure was studied through more groups of tests. The tests show that two-time breaking is the typical failure of ice before steep conical structures, and is controlled by other factors at the same time, such as ice speed and the angle of the cone.
基金Supported by the Key Laboratory of Microsatellites,Chinese Academy of Sciences
文摘A heavy-ion irradiation experiment is studied in digital storage cells with different design approaches in 130?nm CMOS bulk Si and silicon-on-insulator (SOI) technologies. The effectiveness of linear energy transfer (LET) with a tilted ion beam at the 130?nm technology node is obtained. Tests of tilted angles θ=0 ° , 30 ° and 60 ° with respect to the normal direction are performed under heavy-ion Kr with certain power whose LET is about 40?MeVcm 2 /mg at normal incidence. Error numbers in D flip-flop chains are used to determine their upset sensitivity at different incidence angles. It is indicated that the effective LETs for SOI and bulk Si are not exactly in inverse proportion to cosθ , furthermore the effective LET for SOI is more closely in inverse proportion to cosθ compared to bulk Si, which are also the well known behavior. It is interesting that, if we design the sample in the dual interlocked storage cell approach, the effective LET in bulk Si will look like inversely proportional to cosθ very well, which is also specifically explained.
基金supported bythe National High Technology Research and Development Program of China(863Program,Grant No.2003AA602150-3)the National Natural Science Foundation of China(Grant No.50609015)
文摘For the study on the ice-induced vibration of a compliant mono-cone structure,a series of model tests were performed from 2004 to 2006.In these tests,the ice sheet before the compliant conical structure was found to be failed in two-time breaking.Based on this important finding,model tests study of the ice force on a compliant multi-cone structure were performed from 2006 to 2007.In these tests,the ice sheet broke before each single cone non-simultaneously.The exciting energy of the total ice force was found to be in a wide range of frequencies,and the structure can be easily excited with nonlinear resonance.