Through careful study, it found that the key and difficult points of affecting and restricting Xi'an to reach the model city construction standards in provincial and national levels were "urban air environment quali...Through careful study, it found that the key and difficult points of affecting and restricting Xi'an to reach the model city construction standards in provincial and national levels were "urban air environment quality standards" and "water qualification rate of urban water environment function area". In order to tackle with the weak links, highlight the important points and focus on the difficult points to strengthen scientific and technological innovation, we actively explored new ideas and ways to resolve the dilemma in meeting the two standards of model city construction, and we managed to put forward the countermeasures to resolve the dilemma through innovating system and mechanism. "Place master system" should be carded out quickly to meet the "urban air environment quality standards", while "river master system" should be implemented as soon as possible to reach the "water qualification rate of urban water environment function area". The aim of this study was to enhance the qualification rates of the indicators for model city construction to make Xi'an successfully pass the provincial and national assessment of model city construction through dealing with the weak links to accelerate the realization of becoming model environmental protection city.展开更多
文摘Through careful study, it found that the key and difficult points of affecting and restricting Xi'an to reach the model city construction standards in provincial and national levels were "urban air environment quality standards" and "water qualification rate of urban water environment function area". In order to tackle with the weak links, highlight the important points and focus on the difficult points to strengthen scientific and technological innovation, we actively explored new ideas and ways to resolve the dilemma in meeting the two standards of model city construction, and we managed to put forward the countermeasures to resolve the dilemma through innovating system and mechanism. "Place master system" should be carded out quickly to meet the "urban air environment quality standards", while "river master system" should be implemented as soon as possible to reach the "water qualification rate of urban water environment function area". The aim of this study was to enhance the qualification rates of the indicators for model city construction to make Xi'an successfully pass the provincial and national assessment of model city construction through dealing with the weak links to accelerate the realization of becoming model environmental protection city.