Unexpected delays in train operations can cause a cascade of negative consequences in a high-speed railway system.In such cases,train timetables need to be rescheduled.However,timely and efficient train timetable resc...Unexpected delays in train operations can cause a cascade of negative consequences in a high-speed railway system.In such cases,train timetables need to be rescheduled.However,timely and efficient train timetable rescheduling is still a challenging problem due to its modeling difficulties and low optimization efficiency.This paper presents a Transformer-based macroscopic regulation approach which consists of two stages including Transformer-based modeling and policy-based decisionmaking.Firstly,the relationship between various train schedules and operations is described by creating a macroscopic model with the Transformer,providing the better understanding of overall operation in the high-speed railway system.Then,a policy-based approach is used to solve a continuous decision problem after macro-modeling for fast convergence.Extensive experiments on various delay scenarios are conducted.The results demonstrate the effectiveness of the proposed method in comparison to other popular methods.展开更多
Purpose-This study aims to improve the passenger accessibility of passenger demands in the end-ofoperation period.Design/methodology/approach-A mixed integer nonlinear programming model for last train timetable optim...Purpose-This study aims to improve the passenger accessibility of passenger demands in the end-ofoperation period.Design/methodology/approach-A mixed integer nonlinear programming model for last train timetable optimization of the metro was proposed considering the constraints such as the maximum headway,the minimum headway and the latest end-of-operation time.The objective of the model is to maximize the number of reachable passengers in the end-of-operation period.A solution method based on a preset train service is proposed,which significantly reduces the variables of deciding train services in the original model and reformulates it into a mixed integer linear programming model.Findings-The results of the case study of Wuhan Metro show that the solution method can obtain highquality solutions in a shorter time;and the shorter the time interval of passenger flow data,the more obvious the advantage of solution speed;after optimization,the number of passengers reaching the destination among the passengers who need to take the last train during the end-of-operation period can be increased by 10%.Originality/value-Existing research results only consider the passengers who take the last train.Compared with previous research,considering the overall passenger demand during the end-of-operation period can make more passengers arrive at their destination.Appropriately delaying the end-of-operation time can increase the proportion of passengers who can reach the destination in the metro network,but due to the decrease in passenger demand,postponing the end-of-operation time has a bottleneck in increasing the proportion of passengers who can reach the destination.展开更多
Purpose–This paper aims to propose a train timetable rescheduling(TTR)approach from the perspective of multi-train tracking optimization based on the mutual spatiotemporal information in the high-speed railway signal...Purpose–This paper aims to propose a train timetable rescheduling(TTR)approach from the perspective of multi-train tracking optimization based on the mutual spatiotemporal information in the high-speed railway signaling system.Design/methodology/approach–Firstly,a single-train trajectory optimization(STTO)model is constructed based on train dynamics and operating conditions.The train kinematics parameters,including acceleration,speed and time at each position,are calculated to predict the arrival times in the train timetable.A STTO algorithm is developed to optimize a single-train time-efficient driving strategy.Then,a TTR approach based on multi-train tracking optimization(TTR-MTTO)is proposed with mutual information.The constraints of temporary speed restriction(TSR)and end of authority are decoupled to calculate the tracking trajectory of the backward tracking train.The multi-train trajectories at each position are optimized to generate a timeefficient train timetable.Findings–The numerical experiment is performed on the Beijing-Tianjin high-speed railway line and CR400AF.The STTO algorithm predicts the train’s planned arrival time to calculate the total train delay(TTD).As for the TSR scenario,the proposed TTR-MTTO can reduce TTD by 60.60%compared with the traditional TTR approach with dispatchers’experience.Moreover,TTR-MTTO can optimize a time-efficient train timetable to help dispatchers reschedule trains more reasonably.Originality/value–With the cooperative relationship and mutual information between train rescheduling and control,the proposed TTR-MTTO approach can automatically generate a time-efficient train timetable to reduce the total train delay and the work intensity of dispatchers.展开更多
Trains are prone to delays and deviations from train operation plans during their operation because of internal or external disturbances. Delays may develop into operational conflicts between adjacent trains as a resu...Trains are prone to delays and deviations from train operation plans during their operation because of internal or external disturbances. Delays may develop into operational conflicts between adjacent trains as a result of delay propagation, which may disturb the arrangement of the train operation plan and threaten the operational safety of trains. Therefore, reliable conflict prediction results can be valuable references for dispatchers in making more efficient train operation adjustments when conflicts occur. In contrast to the traditional approach to conflict prediction that involves introducing random disturbances, this study addresses the issue of the fuzzification of time intervals in a train timetable based on historical statistics and the modeling of a high-speed railway train timetable based on the concept of a timed Petri net. To measure conflict prediction results more comprehensively, we divided conflicts into potential conflicts and certain conflicts and defined the judgment conditions for both. Two evaluation indexes, one for the deviation of a single train and one for the possibility of conflicts between adjacent train operations, were developed using a formalized computation method. Based on the temporal fuzzy reasoning method, with some adjustment, a new conflict prediction method is proposed, and the results of a simulation example for two scenarios are presented. The results prove that conflict prediction after fuzzy processing of the time intervals of a train timetable is more reliable and practical and can provide helpful information for use in train operation adjustment, train timetable improvement, and other purposes.展开更多
According to the pathological process of ischemic apoplexy, which involves its onset and development, this paper expounds the great significance of adopting various active and effective measures within the therapeutic...According to the pathological process of ischemic apoplexy, which involves its onset and development, this paper expounds the great significance of adopting various active and effective measures within the therapeutic timetable for favorable prognosis and improvement of apoplexy. The author’s viewpoints differ from the conventional thinking towards the management of apoplexy, stressing super early intervention with acupuncture.展开更多
This paper presents a parallel composite local search algorithm based on multiple search neighborhoods to solve a special kind of timetable problem. The new algorithm can also effectively solve those problems that can...This paper presents a parallel composite local search algorithm based on multiple search neighborhoods to solve a special kind of timetable problem. The new algorithm can also effectively solve those problems that can be solved by general local search algorithms. Experimental results show that the new algorithm can generate better solutions than general local search algorithms.展开更多
University timetabling problems are a yearly challenging task and are faced repeatedly each semester.The problems are considered nonpolynomial time(NP)and combinatorial optimization problems(COP),which means that they...University timetabling problems are a yearly challenging task and are faced repeatedly each semester.The problems are considered nonpolynomial time(NP)and combinatorial optimization problems(COP),which means that they can be solved through optimization algorithms to produce the aspired optimal timetable.Several techniques have been used to solve university timetabling problems,and most of them use optimization techniques.This paper provides a comprehensive review of the most recent studies dealing with concepts,methodologies,optimization,benchmarks,and open issues of university timetabling problems.The comprehensive review starts by presenting the essence of university timetabling as NP-COP,defining and clarifying the two formed classes of university timetabling:University Course Timetabling and University Examination Timetabling,illustrating the adopted algorithms for solving such a problem,elaborating the university timetabling constraints to be considered achieving the optimal timetable,and explaining how to analyze and measure the performance of the optimization algorithms by demonstrating the commonly used benchmark datasets for the evaluation.It is noted that meta-heuristic methodologies are widely used in the literature.Additionally,recently,multi-objective optimization has been increasingly used in solving such a problem that can identify robust university timetabling solutions.Finally,trends and future directions in university timetabling problems are provided.This paper provides good information for students,researchers,and specialists interested in this area of research.The challenges and possibilities for future research prospects are also explored.展开更多
通过优化地铁时刻表可有效降低地铁牵引能耗。为解决客流波动和车辆延误对实际节能率影响的问题,提出列车牵引和供电系统实时潮流计算分析模型和基于Dueling Deep Q Network(Dueling DQN)深度强化学习算法相结合的运行图节能优化方法,...通过优化地铁时刻表可有效降低地铁牵引能耗。为解决客流波动和车辆延误对实际节能率影响的问题,提出列车牵引和供电系统实时潮流计算分析模型和基于Dueling Deep Q Network(Dueling DQN)深度强化学习算法相结合的运行图节能优化方法,建立基于区间动态客流概率统计的时刻表迭代优化模型,降低动态客流变化对节能率的影响。对预测Q网络和目标Q网络分别选取自适应时刻估计和均方根反向传播方法,提高模型收敛快速性,同时以时刻表优化前、后总运行时间不变、乘客换乘时间和等待时间最小为优化目标,实现节能时刻表无感切换。以苏州轨道交通4号线为例验证方法的有效性,节能对比试验结果表明:在到达换乘站时刻偏差不超过2 s和列车全周转运行时间不变的前提下,列车牵引节能率达5.27%,车公里能耗下降4.99%。展开更多
基金supported partially by the National Natural Science Foundation of China(61790573,61790575)the Center of National Railway Intelligent Transportation System Engineering and Technology(RITS2019KF03)+3 种基金China Academy of Railway Sciences Corporation LimitedChina Railway Project(N2019G020)China Railway Project(L2022X002)the Key Project of Science and Technology Research Plan of China Academy of Railway Sciences Group Co.Ltd.(2022YJ326)。
文摘Unexpected delays in train operations can cause a cascade of negative consequences in a high-speed railway system.In such cases,train timetables need to be rescheduled.However,timely and efficient train timetable rescheduling is still a challenging problem due to its modeling difficulties and low optimization efficiency.This paper presents a Transformer-based macroscopic regulation approach which consists of two stages including Transformer-based modeling and policy-based decisionmaking.Firstly,the relationship between various train schedules and operations is described by creating a macroscopic model with the Transformer,providing the better understanding of overall operation in the high-speed railway system.Then,a policy-based approach is used to solve a continuous decision problem after macro-modeling for fast convergence.Extensive experiments on various delay scenarios are conducted.The results demonstrate the effectiveness of the proposed method in comparison to other popular methods.
基金supported by Talents Funds for Basic Scientific Research Business Expenses of Central Colleges and Universities (Grant No.2021RC228)Special Funds for Basic Scientific Research Business Expenses of Central Colleges and Universities (Grant No.2021YJS103).
文摘Purpose-This study aims to improve the passenger accessibility of passenger demands in the end-ofoperation period.Design/methodology/approach-A mixed integer nonlinear programming model for last train timetable optimization of the metro was proposed considering the constraints such as the maximum headway,the minimum headway and the latest end-of-operation time.The objective of the model is to maximize the number of reachable passengers in the end-of-operation period.A solution method based on a preset train service is proposed,which significantly reduces the variables of deciding train services in the original model and reformulates it into a mixed integer linear programming model.Findings-The results of the case study of Wuhan Metro show that the solution method can obtain highquality solutions in a shorter time;and the shorter the time interval of passenger flow data,the more obvious the advantage of solution speed;after optimization,the number of passengers reaching the destination among the passengers who need to take the last train during the end-of-operation period can be increased by 10%.Originality/value-Existing research results only consider the passengers who take the last train.Compared with previous research,considering the overall passenger demand during the end-of-operation period can make more passengers arrive at their destination.Appropriately delaying the end-of-operation time can increase the proportion of passengers who can reach the destination in the metro network,but due to the decrease in passenger demand,postponing the end-of-operation time has a bottleneck in increasing the proportion of passengers who can reach the destination.
基金This research was jointly supported by the National Natural Science Foundation of China[Grant 62203468]the Young Elite Scientist Sponsorship Program by China Association for Science and Technology(CAST)[Grant 2022QNRC001]+1 种基金the Technological Research and Development Program of China Railway Corporation Limited[Grant K2021X001]by the Foundation of China Academy of Railway Sciences Corporation Limited[Grant 2021YJ043].On behalf all authors,the corresponding author states that there is no conflict of interest.
文摘Purpose–This paper aims to propose a train timetable rescheduling(TTR)approach from the perspective of multi-train tracking optimization based on the mutual spatiotemporal information in the high-speed railway signaling system.Design/methodology/approach–Firstly,a single-train trajectory optimization(STTO)model is constructed based on train dynamics and operating conditions.The train kinematics parameters,including acceleration,speed and time at each position,are calculated to predict the arrival times in the train timetable.A STTO algorithm is developed to optimize a single-train time-efficient driving strategy.Then,a TTR approach based on multi-train tracking optimization(TTR-MTTO)is proposed with mutual information.The constraints of temporary speed restriction(TSR)and end of authority are decoupled to calculate the tracking trajectory of the backward tracking train.The multi-train trajectories at each position are optimized to generate a timeefficient train timetable.Findings–The numerical experiment is performed on the Beijing-Tianjin high-speed railway line and CR400AF.The STTO algorithm predicts the train’s planned arrival time to calculate the total train delay(TTD).As for the TSR scenario,the proposed TTR-MTTO can reduce TTD by 60.60%compared with the traditional TTR approach with dispatchers’experience.Moreover,TTR-MTTO can optimize a time-efficient train timetable to help dispatchers reschedule trains more reasonably.Originality/value–With the cooperative relationship and mutual information between train rescheduling and control,the proposed TTR-MTTO approach can automatically generate a time-efficient train timetable to reduce the total train delay and the work intensity of dispatchers.
文摘Trains are prone to delays and deviations from train operation plans during their operation because of internal or external disturbances. Delays may develop into operational conflicts between adjacent trains as a result of delay propagation, which may disturb the arrangement of the train operation plan and threaten the operational safety of trains. Therefore, reliable conflict prediction results can be valuable references for dispatchers in making more efficient train operation adjustments when conflicts occur. In contrast to the traditional approach to conflict prediction that involves introducing random disturbances, this study addresses the issue of the fuzzification of time intervals in a train timetable based on historical statistics and the modeling of a high-speed railway train timetable based on the concept of a timed Petri net. To measure conflict prediction results more comprehensively, we divided conflicts into potential conflicts and certain conflicts and defined the judgment conditions for both. Two evaluation indexes, one for the deviation of a single train and one for the possibility of conflicts between adjacent train operations, were developed using a formalized computation method. Based on the temporal fuzzy reasoning method, with some adjustment, a new conflict prediction method is proposed, and the results of a simulation example for two scenarios are presented. The results prove that conflict prediction after fuzzy processing of the time intervals of a train timetable is more reliable and practical and can provide helpful information for use in train operation adjustment, train timetable improvement, and other purposes.
文摘According to the pathological process of ischemic apoplexy, which involves its onset and development, this paper expounds the great significance of adopting various active and effective measures within the therapeutic timetable for favorable prognosis and improvement of apoplexy. The author’s viewpoints differ from the conventional thinking towards the management of apoplexy, stressing super early intervention with acupuncture.
文摘This paper presents a parallel composite local search algorithm based on multiple search neighborhoods to solve a special kind of timetable problem. The new algorithm can also effectively solve those problems that can be solved by general local search algorithms. Experimental results show that the new algorithm can generate better solutions than general local search algorithms.
基金This research work was supported by the University Malaysia Sabah,Malaysia.
文摘University timetabling problems are a yearly challenging task and are faced repeatedly each semester.The problems are considered nonpolynomial time(NP)and combinatorial optimization problems(COP),which means that they can be solved through optimization algorithms to produce the aspired optimal timetable.Several techniques have been used to solve university timetabling problems,and most of them use optimization techniques.This paper provides a comprehensive review of the most recent studies dealing with concepts,methodologies,optimization,benchmarks,and open issues of university timetabling problems.The comprehensive review starts by presenting the essence of university timetabling as NP-COP,defining and clarifying the two formed classes of university timetabling:University Course Timetabling and University Examination Timetabling,illustrating the adopted algorithms for solving such a problem,elaborating the university timetabling constraints to be considered achieving the optimal timetable,and explaining how to analyze and measure the performance of the optimization algorithms by demonstrating the commonly used benchmark datasets for the evaluation.It is noted that meta-heuristic methodologies are widely used in the literature.Additionally,recently,multi-objective optimization has been increasingly used in solving such a problem that can identify robust university timetabling solutions.Finally,trends and future directions in university timetabling problems are provided.This paper provides good information for students,researchers,and specialists interested in this area of research.The challenges and possibilities for future research prospects are also explored.