A series of triaxial laboratory experiments are performed on thick-walled hollow cylindrical samples of boom clay.The aim of this testing program is to better understand the anisotropic deformation during the excavati...A series of triaxial laboratory experiments are performed on thick-walled hollow cylindrical samples of boom clay.The aim of this testing program is to better understand the anisotropic deformation during the excavation.The testing conditions are similar to those to be experienced by host rocks around disposal galleries for radioactive waste.X-ray computed tomography is performed at different steps for each test with the samples remaining inside the loading cell.Initial analysis of the tomography images allows of the observation of the deformation of the central hole.In addition,particles manual tracking and 3D volumetric digital image correlation processing methods are considered being used to analyze the particles displacements and the boundary deformation of the sample quantitatively.An unsymmetrical damaged zone is induced around the hole,with a reverse deformation trend being found at the boundary after unloading,which indicates that the significant anisotropic deformation of boom clay can be induced by mechanical unloading.展开更多
Based on back analysis of lateral displacements measured in situ by using the analytical solution, a useful method for estimating stress concentration ratio of geosynthetic-reinforced and pile-supported(GRPS) embankme...Based on back analysis of lateral displacements measured in situ by using the analytical solution, a useful method for estimating stress concentration ratio of geosynthetic-reinforced and pile-supported(GRPS) embankments was proposed. In order to validate the proposed method, a full-scale high-speed railway embankment(HSRE) with four instrumented subsections over medium compressibility silty clay was constructed in three stages. The soil profile, construction procedure and monitoring of settlements and lateral displacements of the four test sections were described. The field deformation analysis results show that 1) the combined reinforcement of CFG piles and geosynthetic layer perform well in terms of reducing lateral displacements; 2) the development of lateral displacements lags behind the increase of fill load, which can be attributed to the vertical load transfer mechanism of the pile foundation; and 3) pile length has a dominant effect on the stress distribution proportion between piles and surrounding soils. The comparison between predicted and experimental results suggests that the proposed analytical solution and the back analysis-based method are capable of reasonably estimating the lateral deformation and the stress concentration ratio, respectively, if the appropriate soil elastic modulus is chosen.展开更多
The main objective of this study was to determine the consolidation behaviour of clay slurries.A finegrained clay with high consistency limits(W_L = 180%,w_P= 120%) was investigated using conventional oedometer and be...The main objective of this study was to determine the consolidation behaviour of clay slurries.A finegrained clay with high consistency limits(W_L = 180%,w_P= 120%) was investigated using conventional oedometer and bench-top centrifuge tests.Results indicated that the slurry had an apparent preconsolidation(due to initial conditions,electrochemical interactions,tortuous drainage,and thixotropic strength) from e = 5.7 to e = 5.5 followed by virgin compression.Likewise,the low hydraulic conductivity(10^(-10)-10^(-12) m/s) was due to low porosity(small pore throats) and high tortuosity(long flow paths).Unlike consolidation of soils,the c_v and m_v decreased with increasing σ' but increased with increasing e and k.The data from the two tests correlated well in the range of σ' = 10-65 kPa,e = 5.5-3.86,k= 1.7 × 10^(-10)-5×10^(-11) m/s,F_c = 1-40 MN.New equations were developed to correlate the consolidation parameters(e,σ',k) with F_c.The deviation of k beyond 40 MN(e = 4.65) was due to deviation from the initial straight line portion of the settlement curve in the centrifuge test.展开更多
A series of water absorption tests on dried soft rock have been conducted by the intelligent testing system for water absorption tests in deep soft rock, including tests of water absorption with and without pres- sure...A series of water absorption tests on dried soft rock have been conducted by the intelligent testing system for water absorption tests in deep soft rock, including tests of water absorption with and without pres- sure. The results show that the water absorbing capacity of rock with a certain pressure is larger than that of rock without pressure: however, the relationship between the water absorbing percentage and the time can be expressed by w(t) = a(l - e^-bt). In hi-logarithmic coordinates, the hydrophilic relationship with time in tests with pressure could be characterized by linearity, while they present concave or convex in tests without pressure. Based on the hypothesis that each influential factor is irrelevant and they have a linear correlation with the water absorbing capacity, we calculated the weight coefficient of each factor according to experimental results under different conditions. The calculations demonstrate that the effec- tive porosity, content of smectite and kaolinite are all positively correlated with the water absorption capacity of rock; meanwhile, the fractal dimension of the effective pores presents a negative correlation with the water absorption capacity of rock. The water absorption capacity with pressure increases with increasing illite, chlorite and chlorite/smectite formation and a decrease in illite/smectite formation and the fractal dimension of the effective pores, while it is opposite in tests without pressure. The weight coefficient of smectite is smallest among positive factors, and the fractal dimension of the effective pores is the smallest amongst the negative factors.展开更多
基金supported by Fundamental Research Funds for the Central Universities (No.FRF-TP-14-033A1)TIMODAZ project as part of the sixth EURATOM framework programme for nuclear research and training activities (2002–2006)The Department of Diagnostic and Interventional Radiology of the CHUV and the collaboration with Laboratoire 3S-R,Grenoble are gratefully acknowledged
文摘A series of triaxial laboratory experiments are performed on thick-walled hollow cylindrical samples of boom clay.The aim of this testing program is to better understand the anisotropic deformation during the excavation.The testing conditions are similar to those to be experienced by host rocks around disposal galleries for radioactive waste.X-ray computed tomography is performed at different steps for each test with the samples remaining inside the loading cell.Initial analysis of the tomography images allows of the observation of the deformation of the central hole.In addition,particles manual tracking and 3D volumetric digital image correlation processing methods are considered being used to analyze the particles displacements and the boundary deformation of the sample quantitatively.An unsymmetrical damaged zone is induced around the hole,with a reverse deformation trend being found at the boundary after unloading,which indicates that the significant anisotropic deformation of boom clay can be induced by mechanical unloading.
基金Project(2010G003-F)supported by Technological Research and Development Programs of the Ministry of Railways,China
文摘Based on back analysis of lateral displacements measured in situ by using the analytical solution, a useful method for estimating stress concentration ratio of geosynthetic-reinforced and pile-supported(GRPS) embankments was proposed. In order to validate the proposed method, a full-scale high-speed railway embankment(HSRE) with four instrumented subsections over medium compressibility silty clay was constructed in three stages. The soil profile, construction procedure and monitoring of settlements and lateral displacements of the four test sections were described. The field deformation analysis results show that 1) the combined reinforcement of CFG piles and geosynthetic layer perform well in terms of reducing lateral displacements; 2) the development of lateral displacements lags behind the increase of fill load, which can be attributed to the vertical load transfer mechanism of the pile foundation; and 3) pile length has a dominant effect on the stress distribution proportion between piles and surrounding soils. The comparison between predicted and experimental results suggests that the proposed analytical solution and the back analysis-based method are capable of reasonably estimating the lateral deformation and the stress concentration ratio, respectively, if the appropriate soil elastic modulus is chosen.
基金the University of Regina for providing laboratory space and the Natural Science and Engineering Research Council of Canada for financial assistance
文摘The main objective of this study was to determine the consolidation behaviour of clay slurries.A finegrained clay with high consistency limits(W_L = 180%,w_P= 120%) was investigated using conventional oedometer and bench-top centrifuge tests.Results indicated that the slurry had an apparent preconsolidation(due to initial conditions,electrochemical interactions,tortuous drainage,and thixotropic strength) from e = 5.7 to e = 5.5 followed by virgin compression.Likewise,the low hydraulic conductivity(10^(-10)-10^(-12) m/s) was due to low porosity(small pore throats) and high tortuosity(long flow paths).Unlike consolidation of soils,the c_v and m_v decreased with increasing σ' but increased with increasing e and k.The data from the two tests correlated well in the range of σ' = 10-65 kPa,e = 5.5-3.86,k= 1.7 × 10^(-10)-5×10^(-11) m/s,F_c = 1-40 MN.New equations were developed to correlate the consolidation parameters(e,σ',k) with F_c.The deviation of k beyond 40 MN(e = 4.65) was due to deviation from the initial straight line portion of the settlement curve in the centrifuge test.
文摘A series of water absorption tests on dried soft rock have been conducted by the intelligent testing system for water absorption tests in deep soft rock, including tests of water absorption with and without pres- sure. The results show that the water absorbing capacity of rock with a certain pressure is larger than that of rock without pressure: however, the relationship between the water absorbing percentage and the time can be expressed by w(t) = a(l - e^-bt). In hi-logarithmic coordinates, the hydrophilic relationship with time in tests with pressure could be characterized by linearity, while they present concave or convex in tests without pressure. Based on the hypothesis that each influential factor is irrelevant and they have a linear correlation with the water absorbing capacity, we calculated the weight coefficient of each factor according to experimental results under different conditions. The calculations demonstrate that the effec- tive porosity, content of smectite and kaolinite are all positively correlated with the water absorption capacity of rock; meanwhile, the fractal dimension of the effective pores presents a negative correlation with the water absorption capacity of rock. The water absorption capacity with pressure increases with increasing illite, chlorite and chlorite/smectite formation and a decrease in illite/smectite formation and the fractal dimension of the effective pores, while it is opposite in tests without pressure. The weight coefficient of smectite is smallest among positive factors, and the fractal dimension of the effective pores is the smallest amongst the negative factors.