期刊文献+
共找到3,597篇文章
< 1 2 180 >
每页显示 20 50 100
Back-and-forth mining for hard and thick coal seams—research about the mining technology for fully mechanized caving working face of Datong Mine
1
作者 金智新 于红 +1 位作者 于斌 宋华岭 《Journal of Coal Science & Engineering(China)》 2005年第2期1-4,共4页
The article introduced the key technology, mining process, and back-and-forth mining method for the caving working face of hard-thick coal seams in Datong mine, and researched this innovations process, optimized the s... The article introduced the key technology, mining process, and back-and-forth mining method for the caving working face of hard-thick coal seams in Datong mine, and researched this innovations process, optimized the systemic design and working face out-play, tried to perfect the caving mining technology of hard-thick coal seams further. 展开更多
关键词 崩落开采法 机械化 采煤 厚大煤层 采矿技术
下载PDF
Development and prospect on fully mechanized mining in Chinese coal mines 被引量:103
2
作者 Jinhua Wang 《International Journal of Coal Science & Technology》 EI CAS 2014年第3期253-260,共8页
Fully mechanized mining(FMM)technology has been applied in Chinese coal mines for more than 40 years.At present,the output of a FMM face has reached 10-million tons with Chinese-made equipment.In this study,the new de... Fully mechanized mining(FMM)technology has been applied in Chinese coal mines for more than 40 years.At present,the output of a FMM face has reached 10-million tons with Chinese-made equipment.In this study,the new developments in FMM technology and equipment in Chinese coal mines during past decades are introduced.The automatic FMM technology for thin seams,complete sets of FMM technology with ultra large shear height of 7 m for thick seams,complete sets of fully mechanized top coal caving technology with large shear height for ultra-thick seams of 20 m,complete sets of FMM technology for complex and difficult seams,including steeply inclined seams,soft coal seams with large inclination angle,and the mechanized filling mining technology and equipment are presented.Some typical case studies are also introduced.Finally,the existing problems with the FMM technology are discussed,and prospect of FMM technology and equipment applied in Chinese coal mines is put forward. 展开更多
关键词 fully mechanized mining mining with large shear height fully mechanized top coal caving Steeply inclined seam Back filling mining PROSPECT
下载PDF
Waste-filling in fully-mechanized coal mining and its application 被引量:27
3
作者 MIAO Xie-xing ZHANG Ji-xiong FENG Mei-mei 《Journal of China University of Mining and Technology》 EI 2008年第4期479-482,共4页
A fully-mechanized coal mining (FMCM) technology capable of filling up the goaf with wastes (including solid wastes) is described. Industrial tests have proved that by using this technology not only can waste be re-us... A fully-mechanized coal mining (FMCM) technology capable of filling up the goaf with wastes (including solid wastes) is described. Industrial tests have proved that by using this technology not only can waste be re-used but also coal resources can be exploited with a higher recovery rate without removing buildings located over the working faces. Two special devices, a hydraulic support and a scraper conveyor, run side-by-side on the same working face to simultaneously realize mining and filling. These are described in detail. The tests allow analysis of rock pressure and ground subsidence when backfilling techniques are employed. These values are compared to those from mining without using backfilling techniques, under the same geological conditions. The concept of equivalent mining height is proposed based on theoretical analysis of rock pressure and ground subsidence. The upper limits of the rock pressure and ground subsidence can be estimated in backfilling mining using this concept along with traditional engineering formulae. 展开更多
关键词 全机械化采煤 矿渣充填 采煤技术 建筑物下矿床开采
下载PDF
Analysis and key control technologies to prevent spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines 被引量:7
4
作者 QIN Bo-tao SUN Qing-guo +2 位作者 WANG De-ming ZHANG Lei-lin XU Qin 《Mining Science and Technology》 EI CAS 2009年第4期446-451,共6页
In order to prevent spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines in China,we have analyzed the characteristics of spontaneous coal combustion and explain t... In order to prevent spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines in China,we have analyzed the characteristics of spontaneous coal combustion and explain theoretically the factors affecting spontaneous coal combustion,such as rock bursts,high temperatures,high ventilation resistance,slow advancing speed and large obliquity mining.Key technologies to prevent spontaneous combustion occurring in sharply inclined seams in deep mines are proposed;these include pouring water,stopping leakage in upper and lower corners of the working face,choking off the goaf and covering the coal.CO concentrations were controlled within two years to less than 15×10-6 at the upper corner by applying these technologies at the 1410 working face of the Huafeng coal mine.Our method has significant theoretical value and is of practical importance in controlling spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines. 展开更多
关键词 综放工作面 控制技术 大倾角 煤燃烧 深矿 影响因素 岩石破裂 通风阻力
下载PDF
Analysis of Noise at Coal Face by Fully-Mechanized Coal Winning Technology 被引量:1
5
作者 刘照鹏 《Journal of China University of Mining and Technology》 2003年第1期113-116,共4页
The noise level of coal face by full-mechanized coal winning technology was measured in a coal mine. And then it was analyzed and evaluated using environment science, ergonomics and fussy mathematics analysis. Basis o... The noise level of coal face by full-mechanized coal winning technology was measured in a coal mine. And then it was analyzed and evaluated using environment science, ergonomics and fussy mathematics analysis. Basis of the statistics and analysis of the measured noise level some measures, such as applying the new materials and improving the construction of the equipment, were carried out. The resuts show that they can reduce the noise level, improve the working environment and enhance the work efficiency. 展开更多
关键词 噪声 采煤工作面 机械化回采 个人心理 控制方法 模糊数学分析 工作环境
下载PDF
Joint Bearing Mechanism of Coal Pillar and Backfilling Body in Roadway Backfilling Mining Technology 被引量:2
6
作者 Zhengzheng Cao Ping Xu +3 位作者 Zhenhua Li Minxia Zhang Yu Zhao Wenlong Shen 《Computers, Materials & Continua》 SCIE EI 2018年第2期137-159,共23页
In the traditional mining technology,the coal resources trapped beneath surface buildings,railways,and water bodies cannot be mined massively,thereby causing the lower coal recovery and dynamic disasters.In order to s... In the traditional mining technology,the coal resources trapped beneath surface buildings,railways,and water bodies cannot be mined massively,thereby causing the lower coal recovery and dynamic disasters.In order to solve the aforementioned problems,the roadway backfilling mining technology is developed and the joint bearing mechanism of coal pillar and backfilling body is presented in this paper.The mechanical model of bearing system of coal pillar and backfilling body is established,by analyzing the basic characteristics of overlying strata deformation in roadway backfilling mining technology.According to the Ritz method in energy variation principle,the elastic solution expression of coal pillar deformation is deduced in roadway backfilling mining technology.Based on elastic-viscoelastic correspondence principle,combining with the burgers rheological constitutive model and Laplace transform theory,the viscoelastic solution expression of coal pillar deformation is obtained in roadway backfilling mining technology.By analyzing the compressive mechanical property of backfilling body,the time formula required for coal pillar and backfilling body to play the joint bearing function in roadway backfilling mining technology is obtained.The example analysis indicates that the time is 140 days.The results can be treated as an important basis for theoretical research and process design in roadway backfilling mining technology. 展开更多
关键词 Roadway backfilling mining technology coal pillar backfilling body joint bearing mechanism energy variation principle
下载PDF
Fracture mechanics model of fully mechanized top coal caving of shallow coal seams and its application 被引量:6
7
作者 Zhang Jiangong Miao Xiexing +1 位作者 Huang Yanli Li Meng 《International Journal of Mining Science and Technology》 SCIE EI 2014年第3期349-352,共4页
Based on break characteristics of roofs in fully mechanized top-coal mining of thick shallow coal seams, a fracture mechanics model was built, and the criterion of crack propagation in the main roof was derived using ... Based on break characteristics of roofs in fully mechanized top-coal mining of thick shallow coal seams, a fracture mechanics model was built, and the criterion of crack propagation in the main roof was derived using the fracture mechanics theory. The relationships between the fracture length of the roof and the working resistance of the supports were discovered, and the correlations between the load on the overlying strata and the ratio of the crack's length to the thickness of the roof were obtained. Using a working face of Jindi Coal Mine, Xing county Shanxi province as an example, the relationships between the fracture length of the roof and the working resistance of the supports were analysed in detail. The results give a design basis in hydraulic top coal caving supports, which could provide useful references in the practical application. On-site experiment proves that the periodic weighting step interval of the caving face is 15–16 m, which is basically consistent with the theoretical analysis results, and indicates that the mechanized caving hydraulic support is capable of meeting the support requirements in the mining of a super-thick but shallowly buried coal seam. 展开更多
关键词 综采放顶煤开采 断裂力学模型 浅煤层 应用 放顶煤液压支架 放顶煤工作面 放顶煤支架 断裂力学理论
下载PDF
Vertical transportation system of solid material for backfilling coal mining technology 被引量:8
8
作者 Ju Feng Zhang Jixiong,Zhang Qiang 《International Journal of Mining Science and Technology》 2012年第1期41-45,共5页
For transportation of solid backfill material such as waste and fly ash from the surface to the bottom of the shaft in a fully mechanized backfilling coal backfilling coal mining technology, we developed a new vertica... For transportation of solid backfill material such as waste and fly ash from the surface to the bottom of the shaft in a fully mechanized backfilling coal backfilling coal mining technology, we developed a new vertical transportation system to transport this type of solid backfill material. Given the demands imposed on safely in feeding this material, we also investigated the structure and basic parameter of this system. For a mine in the Xingtai mining area the results show that: (1) a vertical transportation system should include three main parts, i.e., a feeding borehole, a maintenance chamber and a storage silo; (2) we determined that 486 mm is a suitable diameter for bore holes, the diameter of the storage silo is 6 m and its height 30 m in this vertical transportation system; (3) a conical buffer was developed to absorb the impact during the feeding process. To ensure normal implementation of fully mechanized backfilling coal mining technology and the safety of underground personnel, we propose a series of security technologies for anti-blockage, storage silo cleaning, high pressure air release and aspiration. This vertical transporting system has been applied in one this particular mine, which has fed about 4 million tons solid material with a feeding depth of 350 m and safely exploited 3 million tons of coal. 展开更多
关键词 垂直运输系统 回填材料 固体物质 采煤技术 安全技术 钻孔直径 固体废物 邢台矿区
下载PDF
Application of deep borehole blasting on fully mechanized hard top-coal pre-splitting and gas extraction in the special thick seam 被引量:3
9
作者 Liu Jian Liu Zegong +2 位作者 Xue Junhua Gao Kui Zhou Wei 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2015年第5期755-760,共6页
In order to solve the problems of top-coal inadequate destruction and large amounts of gas emission in mining extra thick and hard coal seam,this study investigated the pre-splitting for deep borehole blasting and gas... In order to solve the problems of top-coal inadequate destruction and large amounts of gas emission in mining extra thick and hard coal seam,this study investigated the pre-splitting for deep borehole blasting and gas pre-draining technologies on top coal.The mechanism of the technologies was systematically expounded based on hard top-coal cracks development obtained by numerical simulation and theoretical analysis.The results show that explosive blasting in the hard rock results in a large number of cracks and large displacement in the rock mass due to the effect of explosion stress.Meanwhile,the thick top-coal caves,and desorbing gas flows along the cracks improve gas extraction.Finally,the pre-splitting for deep borehole blasting and gas pre-draining technologies was applied in No.3802 working face of Shui Liandong Coal Mine,which increases monthly output in the face to 67.34 kt and the drained gas concentration to 86.2%.The drained gas average concentration from each borehole reaches 40%,and the effect is remarkable. 展开更多
关键词 深孔爆破 特厚煤层 综放工作面 瓦斯抽放 预裂 应用 特厚坚硬煤层 瓦斯预抽
下载PDF
Hydraulic support stability control of fully mechanized top coal caving face with steep coal seams based on instable critical angle 被引量:2
10
作者 屠世浩 袁永 +2 位作者 李乃梁 窦凤金 王方田 《Journal of Coal Science & Engineering(China)》 2008年第3期382-385,共4页
Analyzed the support instable mode of sliding,tripping,and so on,and believed the key point of the support stability control of fully mechanized coal caving face with steep coal seams was to maintain that the seam tru... Analyzed the support instable mode of sliding,tripping,and so on,and believed the key point of the support stability control of fully mechanized coal caving face with steep coal seams was to maintain that the seam true angle was less than the hydraulic support instability critical angle.Through the layout of oblique face,the improvement of support setting load,the control of mining height and nonskid platform,the group support system of end face,the advance optimization of conveyor and support,and the other control tech- nical measures,the true angle of the seam is reduced and the instable critical angle of the support is increased,the hydraulic support stability of fully mechanized coal caving face with steep coal seams is effectively controlled. 展开更多
关键词 深层煤炭裂缝 支护系统 机械化开采 控制技术
下载PDF
Technological optimization of fully mechanized caving mining face with large mining heights 被引量:1
11
作者 Lu-Jia FAN Sheng-Li YANG 《Journal of Coal Science & Engineering(China)》 2013年第3期290-294,共5页
关键词 大采高综采工作面 技术 优化 顶煤回收率 开采厚度 厚煤层开采 采矿方法 巷道掘进
下载PDF
Study on safe thickness of overlying thin bedrock in fully-mechanized top-coal caving face with thick coal seam
12
作者 方新秋 黄汉富 何杰 《Journal of Coal Science & Engineering(China)》 2007年第4期507-511,共5页
关键词 机械化 开采技术 基岩 安全性能
下载PDF
Ground pressure and overlying strata structure for a repeated mining face of residual coal after room and pillar mining 被引量:10
13
作者 Jiang Bangyou Wang Lianguo +2 位作者 Lu Yinlong Sun Xiaokang Jin Gan 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第4期645-652,共8页
To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining,the roof fracture structural model and mechanical model were deve... To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining,the roof fracture structural model and mechanical model were developed using numerical simulation and theoretical analysis.The roof fracture characteristics of a repeated mining face were revealed and the ground pressure law and roof supporting conditions of the repeated mining face were obtained.The results indicate that when the repeated mining face passes the residual pillars,the sudden instability causes fracturing in the main roof above the old goaf and forms an extra-large rock block above the mining face.A relatively stable ‘‘Voussoir beam" structure is formed after the advance fracturing of the main roof.When the repeated mining face passes the old goaf,as the large rock block revolves and touches gangue,the rock block will break secondarily under overburden rock loads.An example calculation was performed involving an integrated mine in Shanxi province,results showed that minimum working resistance values of support determined to be reasonable were respectively 11,412 kN and 10,743 kN when repeated mining face passed through residual pillar and goaf.On-site ground pressure monitoring results indicated that the mechanical model and support resistance calculation were reasonable. 展开更多
关键词 岩层结构 地压 采面 采后 复采工作面 残煤 房柱 顶板裂缝
下载PDF
CHINA'S RECENT DEVELOPMENT IN COAL MINING,PROCESSING AND UTILIZATION
14
作者 范维唐 王成龙 朱德仁 《Journal of Coal Science & Engineering(China)》 1996年第1期1-9,共9页
This paper describes the state-of-the-art and Outlook of coal mining and clean coal technology in China. As the major mining method,underground mining accounts for 96% of the total production. Among the state own mine... This paper describes the state-of-the-art and Outlook of coal mining and clean coal technology in China. As the major mining method,underground mining accounts for 96% of the total production. Among the state own mines, the percentage of mechanized mining reached 71 %. A rapid development of high-productive and high-profitable mines,especially those with longwall sublevel caving method, is described. The issues of heavy duty equipment, roof bolting,mine safety are also addressed. The Chinese government is paying more and more attention on the environmental problems inducing from coal mining,processing and utilization. A basic framework of clean coal technology is being formed and a wide range of technology is included. 展开更多
关键词 中国 煤炭工业 清洁生产 机械化生产 环境保护
下载PDF
煤矿井下非均匀照度图像去噪研究 被引量:1
15
作者 张旭辉 麻兵 +2 位作者 杨文娟 董征 李语阳 《工矿自动化》 CSCD 北大核心 2024年第2期1-8,共8页
煤矿综采工作面空间小、照明环境复杂多变,采煤过程中伴随着大量的粉尘、大雾,导致采集的图像出现曝光、细节特征减弱等问题,难以对井下照明区域光照强度过大的图像进行有效的特征提取。针对上述问题,提出了一种煤矿井下非均匀照度图像... 煤矿综采工作面空间小、照明环境复杂多变,采煤过程中伴随着大量的粉尘、大雾,导致采集的图像出现曝光、细节特征减弱等问题,难以对井下照明区域光照强度过大的图像进行有效的特征提取。针对上述问题,提出了一种煤矿井下非均匀照度图像去噪算法。首先,将视频截取为图像,判断图像是否需要进行光照抑制,将需要进行光照抑制的RGB图像拆分通道,并计算每个通道的光照调节因子,实现图像的整体光照调节;然后,将未进行整体光照抑制的图像和经整体光照抑制的图像进行反射分量提取,即将输入的图像转换为HSV空间图像,使用单尺度Retinex(SSR)算法对V通道图像中的光照分量进行单独处理,将V分量中的入射分量去除,保留反射分量,并对反射分量使用直方图均衡算法实现光照均衡化处理;最后,使用基于引导滤波的暗通道先验算法对经过光照处理后的图像进行去雾处理,并使用伽马校正函数重新调节亮度不均的图像。主观评价结果表明:提出的煤矿井下非均匀照度图像去噪算法有效抑制了因光照导致整体亮度较高的问题,且由于大雾、粉尘等因素导致图像模糊的部分更加清晰,图像的细节特征更加突出。采用信息熵、均值、标准差、空间频率4种评价指标对提出的算法效果进行客观评价,结果表明,提出的算法在信息熵、均值、标准差、空间频率上较多尺度Retinex(MSR)算法分别平均提升了21.87%,-56.06%,153.43%,294.45%,较基于颜色保持的多尺度视网膜增强(MSRCP)算法分别平均提升了1.18%,-39.56%,33.29%,-4.71%,较带色彩恢复的多尺度视网膜增强(MSRCR)算法分别平均提升了38.06%,-55.27%,462.10%,300.96%,说明提出的算法能更有效地增加图像信息量、抑制光照强度、提升边缘信息及图像清晰度。 展开更多
关键词 综采工作面 煤矿井下图像去噪 非均匀光照 高光抑制 亮度均衡 图像去雾 伽马校正
下载PDF
我国大倾角煤层开采技术变革与展望
16
作者 伍永平 郎丁 +14 位作者 贠东风 解盘石 王红伟 高喜才 罗生虎 曾佑富 吕文玉 张艳丽 胡博胜 皇甫靖宇 周邦远 黄国春 王丽 李俊明 刘斌 《煤炭科学技术》 EI CAS CSCD 北大核心 2024年第1期25-51,共27页
大倾角煤层是我国煤炭资源的主要赋存样式之一。在地域分布上呈现出广泛性与区域性,据不完全统计,全国25个省、自治区、直辖市均涉及该类煤层开采,在中西部地区储量丰富、产量大、生产集中程度高。在赋存条件上呈现出多样性与复杂性,不... 大倾角煤层是我国煤炭资源的主要赋存样式之一。在地域分布上呈现出广泛性与区域性,据不完全统计,全国25个省、自治区、直辖市均涉及该类煤层开采,在中西部地区储量丰富、产量大、生产集中程度高。在赋存条件上呈现出多样性与复杂性,不同区域成煤时期不一,构造控煤过程迥异,形成了多样且复杂的开采条件,催生了不同的开采技术要求。大倾角煤层开采的技术难度大。煤层倾角导致采场围岩运动破坏呈现非对称性显现特征,支护系统稳定性控制与“三机”配套与协同、采准巷道布置与支护、工作面“人-机”环境安全保障等工作的难度显著加剧,严重制约了矿井安全高效开采。大倾角煤层开采的区域经济需求强,该类煤层赋存与生产较集中的区域多见以煤炭工业为主的资源型城市,经济结构相对单一,煤炭资源安全高效开发利用对区域能源保供、民生保障、经济保稳具有兜底作用。长期以来,大倾角煤层开采技术变革聚焦于解决“难”与“需”的矛盾,在采煤方法与工艺、岩层控制理论与技术、成套装备研制与应用3个方面不断完善、创新、发展,实现了由非机械化向机械化开采的转变,安全产效水平大幅提升,人员劳动强度大幅下降,作业环境显著改善。20世纪90年代中期,川煤集团绿水洞煤矿首次成功实现了大倾角中厚煤层长壁综采,冲破了大倾角煤层机械化开采技术“禁区”。在此示范作用下,大倾角厚煤层长壁综放开采、大采高综采、薄煤层伪俯斜长壁综采三项首创性工程实践先后取得成功。这一过程中创新了工作面非线性限位布置与调斜方式,确立了“支架-围岩”系统稳定性多维交互控制模式,研发了工作面成套装备,取得良好收效,综合机械化开采技术适用范围进一步拓宽。与此同时,大倾角煤层开采仍存在许多亟待突破的关键科学问题与技术瓶颈,导致自动化、智能化水平提升与近水平/缓倾斜煤层相较仍存在较大差距。需进一步强化倾斜层状煤系地层煤岩体采动力学行为研究,揭示其对采场围岩灾变的控制机制,并实现量化表征;需进一步阐明岩体承载结构-采场装备群组系统间的多维动态作用过程与规律,完善装备与围岩多维动态多目标协同控制理论与技术基础,实现技术转化应用。在科学问题取得突破的基础上进行采煤方法、回采工艺、岩层控制、成套装备的系统性技术创新与研发,破解大倾角煤层开采安全-产效双提升的制约技术瓶颈,使大倾角煤层综合机械化开采倾角上限在有可靠技术保障的前提下向上延伸(扩展),为实现自动化、智能化开采奠定基础。 展开更多
关键词 大倾角煤层 机械化开采 岩层控制 技术变革
下载PDF
基于残差优化的综采工作面煤壁点云补全方法
17
作者 汪卫兵 侯学谦 +3 位作者 赵栓峰 贺海涛 邢志中 路正雄 《工矿自动化》 CSCD 北大核心 2024年第6期120-128,共9页
煤矿综采工作面巷道的数字化三维重建过程中需要完整且密集的煤壁点云数据。受遮挡、视角限制等因素影响,采集的综采工作面煤壁点云数据往往不完整且稀疏,影响下游任务,需进行煤壁点云修复和补全。目前缺少针对井下点云补全任务的数据... 煤矿综采工作面巷道的数字化三维重建过程中需要完整且密集的煤壁点云数据。受遮挡、视角限制等因素影响,采集的综采工作面煤壁点云数据往往不完整且稀疏,影响下游任务,需进行煤壁点云修复和补全。目前缺少针对井下点云补全任务的数据集和网络模型,现有模型用于煤壁点云补全时存在点云密度分布不均匀、点云特征信息丢失等情况。针对上述问题,设计了一种基于残差优化的煤壁点云补全网络模型,采用监督学习方式学习点云特征信息,通过最小化密度采样和残差网络迭代优化输出完整点云。采集煤矿井下真实综采工作面煤壁点云数据,预处理后筛选可用数据,通过模拟随机空洞制作煤壁点云缺失数据集,并用缺失数据集训练基于残差优化的煤壁点云补全网络模型。实验结果表明:与经典的FoldingNet,TopNet,AtlasNet,PCN,3D-Capsule点云补全网络模型相比,基于残差优化的煤壁点云补全网络模型针对构造的缺失煤壁点云和稀疏煤壁点云补全的倒角距离、地移距离及F1分数均能达到最优水平,整体补全效果最佳;针对实际缺失的煤壁点云,该模型能够实现有效补全。 展开更多
关键词 煤矿综采工作面 数字化煤层 巷道三维重建 点云修复 点云补全 残差优化
下载PDF
多频雷达融合的顶煤结构精准探测技术
18
作者 刘万里 王诚龙 +1 位作者 王浩宇 张学亮 《岩土力学》 EI CAS CSCD 北大核心 2024年第2期633-646,共14页
顶煤结构的准确探测是实现综放智能化开采的重要依据,然而我国煤层结构复杂且内部常含多层夹矸,易影响综放智能化开采的水平。为此,提出一种多频雷达融合的顶煤结构精准探测方法,可提高雷达天线探测深度内的浅部探测精度,同时对顶煤内... 顶煤结构的准确探测是实现综放智能化开采的重要依据,然而我国煤层结构复杂且内部常含多层夹矸,易影响综放智能化开采的水平。为此,提出一种多频雷达融合的顶煤结构精准探测方法,可提高雷达天线探测深度内的浅部探测精度,同时对顶煤内部的结构信息进行解释。主要研究步骤如下:首先,对不同频率的雷达数据进行预处理和空间对齐,建立不同频率雷达数据之间的空间对应关系;其次,利用滑动窗口与小波变换加权融合方法对多频率雷达数据进行处理,根据窗口内各分段小波信号的能量占比确定各频率信号的时变权重值,并引入边缘检测算法来提高小波变换对雷达数据的融合效率,实现多频雷达数据有效融合;最后,根据煤-矸-岩的介电常数差异和电磁波传播的衰减特性,建立顶煤内部回波强度模型,并利用分层识别方法计算出顶煤内部煤-矸-岩之间的界面信息,进而反演出顶煤内部结构(包括顶煤厚度、夹矸厚度及层数、夹矸层间距等)。试验结果表明:所提出的方法能有效地将不同频率雷达数据进行融合,并能有效地探测出顶煤内部结构特征,且顶煤厚度、夹矸厚度和夹矸层间距的探测误差均小于10%。该方法有助于实现顶煤结构的精准探测,为综放智能化开采提供理论技术支撑。 展开更多
关键词 综放开采 多频雷达融合 顶煤结构 探测
下载PDF
刮板输送机技术发展历程(一)——国外技术
19
作者 葛世荣 王俊涛 宋智丽 《中国煤炭》 北大核心 2024年第2期1-12,共12页
刮板输送机是井下采煤工作面的“脊梁”装备,它经历了6次技术变革,持续推动采煤工艺变革及生产效率持续提升。刮板输送机第1次技术变革发生于1900-1940年,诞生了可拆卸刮板输送机,煤矿开启半机械化开采时代;第2次技术变革产生于1940-195... 刮板输送机是井下采煤工作面的“脊梁”装备,它经历了6次技术变革,持续推动采煤工艺变革及生产效率持续提升。刮板输送机第1次技术变革发生于1900-1940年,诞生了可拆卸刮板输送机,煤矿开启半机械化开采时代;第2次技术变革产生于1940-1950年,创制了可弯曲刮板输送机,煤矿进入机械化开采时代;第3次技术变革形成于1950-1985年,创设了可自移刮板输送机,煤矿跨入综合机械化开采时代;第4次技术变革出现在1985-2000年,已发展成为重型化刮板输送机,煤矿走向高产高效综采时代;第5次技术变革形成于2000-2010年,研发出自动化刮板输送机,煤矿迈向数字化综采时代;第6次技术变革始于2010年,创新推出智能化刮板输送机,煤矿开启少人化智采时代。英国和德国为刮板输送机初创做出巨大贡献,研制出多种早期的刮板输送机机型。苏联对刮板输送机的系列化,以及对机械化采煤机的配套起到重要的创新推动作用。在此基础上,1954年,英国把安德顿滚筒采煤机与垛式支架、可弯曲刮板输送机组合为综合机械化采煤机组,建成世界上第一个综采工作面。21世纪以来,世界煤炭开采的重心逐步转向我国,国外刮板输送机研发与制造影响力逐年衰减,我国逐渐成为刮板输送机的制造强国。 展开更多
关键词 刮板输送机 采煤工作面 机械化采煤 煤矿智能化 技术发展史
下载PDF
特厚煤层综放开采合理放煤工艺参数研究
20
作者 李正杰 陈万辉 +1 位作者 周鹏 刘绪玉 《煤炭工程》 北大核心 2024年第7期22-27,共6页
针对不连沟煤矿特厚煤层综放开采放煤工艺参数确定的合理性问题,通过实测特厚煤层单轮顺序放煤时单个支架的连续放煤时间,在倾向方向基于“大、中、小、微”放煤理念确定了“大”放煤、“中”放煤、“小”放煤、“微”放煤的循环内位置... 针对不连沟煤矿特厚煤层综放开采放煤工艺参数确定的合理性问题,通过实测特厚煤层单轮顺序放煤时单个支架的连续放煤时间,在倾向方向基于“大、中、小、微”放煤理念确定了“大”放煤、“中”放煤、“小”放煤、“微”放煤的循环内位置和放煤间距;在走向方向通过布置多点位移计测试了不同顶煤高度、不同循环时的顶煤运移轨迹曲线,得出在倾斜方向的顶煤移动轨迹曲线方程,确定不同放煤步距时的工艺损失。研究结果表明:单放煤口充分放煤时,工作面倾向方向影响距离6~12架,倾向单架放煤影响半径平均7.6 m;循环内两端“大”放煤、中间“中”放煤、其余“小”放煤和“微”放煤交替;本架放煤在垂高12.3 m层位的走向影响距离平均4.9 m,在垂高8.3 m层位的走向影响距离平均3.8 m,拟合确定了不同放煤步距的顶煤走向运移方程,理论得出循环步距0.8 m比1.6 m减少煤炭损失694 t。研究结果为指导不连沟煤矿特厚煤层综放开采合理放煤和提高资源回收率提供依据。 展开更多
关键词 特厚煤层 综放开采 放煤工艺参数 顶煤走向运移
下载PDF
上一页 1 2 180 下一页 到第
使用帮助 返回顶部